BLD-Final | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
DOC - Permit Finaled | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/3/2019 | 7/3/2019 | 7/5/2019 | P | PEND |
Dave Hannah
|
|
|
Brian Phone #: ###-#### needs to finish stairs
|
BLD-Final | 6/12/2019 | 6/14/2019 | 6/14/2019 | A | NR |
Dave Hannah
|
|
|
matt Phone #: ###-####
|
BLD-Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | P | CANC |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
PubWorks Occupancy Approval | 4/8/2019 | 4/8/2019 | 4/8/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 9/7/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
BLD-Wall Bracing | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PEND |
Dave Hannah
|
|
|
Matt Phone #: ###-#### needs to finish elec rough in and install air seal
|
BLD-Foundation | 1/25/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
Extend Permit 90/180 days | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | CANC |
Dave Hannah
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 1/5/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 1/4/2018 | 1/4/2018 | 1/4/2018 | A | CANC |
Dave Hannah
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 1/2/2018 | 1/3/2018 | 1/4/2018 | P | CANC |
Dave Hannah
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
PubWorks Subgrade Approval | 1/4/2018 | 1/4/2018 | 1/4/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 10/27/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/26/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 9/5/2017 | 9/5/2017 | 10/26/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete - fail- misc WUI items 9/22 sfd L2 paper
|
Inspection Record Card- Bld | | | 10/26/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/26/2017 | | DONE |
|
|
|
called Matt and left vm permit is ready and fee due.
|
Case Summary (BLD) | | | 10/26/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/26/2017 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | 10/11/2017 | | 10/26/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 10/25/2017 | | DONE |
|
|
|
1 copy of form 310 and 1 copy of roof specifications stamped and taken to Brian M
|
Plan resubmittals received | | | 10/24/2017 | | DONE |
|
|
|
received 2sets of code compl research and 2 of each sheet-A1.1, A2.0, A2.1, A2.2, A3.1, A3.2, A4.1, A4.2, A5.1, A6.1, S1.1, S1.2, S2.1, S2.2, S3.1, S3.2, S4.0, S4.1, S4.2, E2.0, E2.1, E2.2 & S1.2-Took to Brian McGowan
|
1st review completed | | | 10/18/2017 | | DONE |
Brian McGowan
|
|
|
WUI Items
|
Routing - PLAN CHECK | 9/14/2017 | | 10/18/2017 | | FAIL |
Brian McGowan
|
|
|
Wui Items
|
Routing - FIRE | 10/17/2017 | 10/17/2017 | 10/17/2017 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing - Erosion and Sediment | 10/17/2017 | | 10/17/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map approved. Valid PD; RP tbd. Site prep required prior to excavation.
|
Routing PW Grading-Hillside | 10/4/2017 | | 10/11/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PUBLIC WORKS | 10/4/2017 | | 10/11/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PUBLIC WORKS | 10/11/2017 | | 10/11/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 10/9/2017 | | 10/9/2017 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 10/4/2017 | | DONE |
|
|
|
Three copies of sheet C1.0 taken to Brian Mc. Brian took them and the original plans to Rachael.
|
Routing PW Grading-Hillside | 9/25/2017 | | 9/26/2017 | | FAIL |
Melissa Jannusch
|
|
|
Resubmitted plans are and older version than the originally submitted plans. Please submit updated plans/ documents and address corrections requested in e-mail to applicant and engineer dated 9-12-2017 and resent on 9-26-2017.
|
Routing - PUBLIC WORKS | 9/26/2017 | | 9/26/2017 | | FAIL |
Morgan Webb
|
|
|
|
Plan resubmittals received | | | 9/22/2017 | | DONE |
|
|
|
received three copies of plan sheets C1.0, C2.0, A3.1, A3.2; taken to Brian McGowan
|
Routing - MECHANICAL | | | 9/14/2017 | | FAIL |
Troy James
|
|
|
emailed correction to idaho hvac
|
Routing - PLANNING | 9/12/2017 | | 9/12/2017 | | PASS |
Nicolette Womack
|
|
|
|
Routing PW Grading-Hillside | 9/6/2017 | | 9/12/2017 | | FAIL |
Melissa Jannusch
|
|
|
Corrections needed see e-mail to applicant (subject 761 N. Santa Paula Dr. BLD17-03187 Hillside Review Corrections) dated 9-12-2017
|
Routing - PUBLIC WORKS | 9/12/2017 | | 9/12/2017 | | FAIL |
Rachael Beierle
|
|
|
SEE HILLSIDE NOTES
|
Route to Impact Fee Review | 9/5/2017 | 9/8/2017 | 9/6/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 9/5/2017 | | 9/6/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Sewer Rating | 9/6/2017 | | 9/6/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/5/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/5/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/5/2017 | | PASS |
|
|
|
|
Application received | | 9/5/2017 | | | |
|
|
|
|