Permit Information
Permit NumberBLD17-03187
StatusFinaled
Name BROWN BUILDING CO LLC
Site Address 761 N SANTA PAULA CT
Project Name 
Customer NumberCFH17-00022
ePlanReviewNo
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 4271 sq. ft., two story (first story 1608 sq. ft., second story 1098 sq. ft., basement 1565 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 606 sq. ft. of covered patio/porch and a 706-sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. The Parklex exterior was NOT approved by the Frie Marshall. ***BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/6/20199/6/20199/6/2019PPASS
DetailsDave Hannah
Brian Phone #: ###-####
DOC - Permit Finaled9/6/20199/6/20199/6/2019PPASS
DetailsDave Hannah
BLD-Final7/3/20197/3/20197/5/2019PPEND
DetailsDave Hannah
Brian Phone #: ###-#### needs to finish stairs
BLD-Final6/12/20196/14/20196/14/2019ANR
DetailsDave Hannah
matt Phone #: ###-####
BLD-Final4/23/20194/24/20194/24/2019PCANC
DetailsDave Hannah
Matt Phone #: ###-####
PubWorks Occupancy Approval4/8/20194/8/20194/8/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance9/21/20189/21/20189/21/2018PPASS
DetailsDave Hannah
Matt Phone #: ###-####
BLD-Framing/Rough-in9/7/20189/10/20189/10/2018PPASS
DetailsJim Sly
Matt Phone #: ###-####
BLD-Wall Bracing9/5/20189/6/20189/6/2018APASS
DetailsDave Hannah
Matt Phone #: ###-####
BLD-Framing/Rough-in9/5/20189/5/20189/5/2018PPEND
DetailsDave Hannah
Matt Phone #: ###-#### needs to finish elec rough in and install air seal
BLD-Foundation1/25/20181/25/20181/25/2018PPASS
DetailsDave Hannah
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
Extend Permit 90/180 days1/4/20181/5/20181/5/2018ACANC
DetailsDave Hannah
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing1/5/20181/5/20181/5/2018APASS
DetailsDave Hannah
BLD-Footing1/4/20181/4/20181/4/2018ACANC
DetailsDave Hannah
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing1/2/20181/3/20181/4/2018PCANC
DetailsDave Hannah
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
PubWorks Subgrade Approval1/4/20181/4/20181/4/2018 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  10/27/2017 DONE
OVERRIDE  10/26/2017  
Plan assigned to (BJM)9/5/20179/5/201710/26/2017 DONE
DetailsBrian McGowan
1st review complete - fail- misc WUI items 9/22 sfd L2 paper
Inspection Record Card- Bld  10/26/2017 DONE
Telephone call  10/26/2017 DONE
called Matt and left vm permit is ready and fee due.
Case Summary (BLD)  10/26/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  10/26/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  10/26/2017 DONE
All Met
Routing - PLAN CHECK10/11/2017 10/26/2017 PASS
DetailsBrian McGowan
Plan resubmittals received  10/25/2017 DONE
1 copy of form 310 and 1 copy of roof specifications stamped and taken to Brian M
Plan resubmittals received  10/24/2017 DONE
received 2sets of code compl research and 2 of each sheet-A1.1, A2.0, A2.1, A2.2, A3.1, A3.2, A4.1, A4.2, A5.1, A6.1, S1.1, S1.2, S2.1, S2.2, S3.1, S3.2, S4.0, S4.1, S4.2, E2.0, E2.1, E2.2 & S1.2-Took to Brian McGowan
1st review completed  10/18/2017 DONE
DetailsBrian McGowan
WUI Items
Routing - PLAN CHECK9/14/2017 10/18/2017 FAIL
DetailsBrian McGowan
Wui Items
Routing - FIRE10/17/201710/17/201710/17/2017 PASS
DetailsErika Akin
Plans were reviewed for FD access, availability of hydrants and defensible space.
Routing - Erosion and Sediment10/17/2017 10/17/2017 PASS
DetailsAndy J. Long
ESC plan with site map approved. Valid PD; RP tbd. Site prep required prior to excavation.
Routing PW Grading-Hillside10/4/2017 10/11/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - PUBLIC WORKS10/4/2017 10/11/2017 PASS
DetailsRachael Beierle
Routing - PUBLIC WORKS10/11/2017 10/11/2017 PASS
DetailsRachael Beierle
Routing - MECHANICAL10/9/2017 10/9/2017 PASS
DetailsTroy James
Plan resubmittals received  10/4/2017 DONE
Three copies of sheet C1.0 taken to Brian Mc. Brian took them and the original plans to Rachael.
Routing PW Grading-Hillside9/25/2017 9/26/2017 FAIL
DetailsMelissa Jannusch
Resubmitted plans are and older version than the originally submitted plans. Please submit updated plans/ documents and address corrections requested in e-mail to applicant and engineer dated 9-12-2017 and resent on 9-26-2017.
Routing - PUBLIC WORKS9/26/2017 9/26/2017 FAIL
DetailsMorgan Webb
Plan resubmittals received  9/22/2017 DONE
received three copies of plan sheets C1.0, C2.0, A3.1, A3.2; taken to Brian McGowan
Routing - MECHANICAL  9/14/2017 FAIL
DetailsTroy James
emailed correction to idaho hvac
Routing - PLANNING9/12/2017 9/12/2017 PASS
DetailsNicolette Womack
Routing PW Grading-Hillside9/6/2017 9/12/2017 FAIL
DetailsMelissa Jannusch
Corrections needed see e-mail to applicant (subject 761 N. Santa Paula Dr. BLD17-03187 Hillside Review Corrections) dated 9-12-2017
Routing - PUBLIC WORKS9/12/2017 9/12/2017 FAIL
DetailsRachael Beierle
SEE HILLSIDE NOTES
Route to Impact Fee Review9/5/20179/8/20179/6/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing9/5/2017 9/6/2017 PASS
DetailsDoug Chausow
Routing PW Sewer Rating9/6/2017 9/6/2017 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  9/5/2017 DONE
Recd Pcfee & Taken To Pln CK  9/5/2017 DONE
Intake Approval  9/5/2017 PASS
Application received 9/5/2017