DOC - Permit Finaled | | | 1/7/2019 | | DONE |
|
|
|
Passed final 12/18/2018
|
BLD-Final | 12/18/2018 | 12/19/2018 | 12/19/2018 | A | PASS |
Dave Hannah
|
|
|
Doug Phone #: ###-####
|
BLD-Final | 12/11/2018 | 12/13/2018 | 12/13/2018 | A | FAIL |
Dave Hannah
|
|
|
Doug Phone #: ###-#### Handrail off patio off master bedroom, that will be installed shortly. c/n on site hand rails and window sills
|
PubWorks Occupancy Approval | 12/10/2018 | 12/10/2018 | 12/10/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Dave Hannah
|
|
|
Clive- inspector drywall on soffits-also ###-#### for Doug Phone #: ###-####
|
BLD-Energy code compliance | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Dave Hannah
|
|
|
Clve Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Dave Hannah
|
|
|
Doug Phone #: ###-####
|
BLD-Foundation | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Foundation | 2/23/2018 | 2/23/2018 | 2/23/2018 | A | CANC |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Foundation | 2/22/2018 | 2/22/2018 | 2/22/2018 | P | CANC |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
PubWorks Subgrade Approval | 1/9/2018 | 1/9/2018 | 1/9/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 12/14/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/13/2017 | | |
|
|
|
|
Routing - PLAN CHECK | 12/13/2017 | | 12/13/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/13/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 11/17/2017 | | 12/13/2017 | | PASS |
Josh Bogle
|
|
|
1st done - Hillside, several structural & WUI issues
|
Routing - PLAN CHECK | 12/4/2017 | | 12/4/2017 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 11/18/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/20/2017 | | 11/18/2017 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (BJM) | 10/20/2017 | 10/20/2017 | 11/17/2017 | | DEFR |
Brian McGowan
|
|
|
11/8 sfd L2 ePlan
|
Routing PW Grading-Hillside | 10/20/2017 | | 10/27/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - FIRE | 10/20/2017 | 10/20/2017 | 10/25/2017 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing - MECHANICAL | 10/25/2017 | | 10/25/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 10/20/2017 | 10/23/2017 | 10/23/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 10/20/2017 | | 10/23/2017 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Erosion and Sediment | 10/20/2017 | | 10/23/2017 | | PASS |
Michael Zawacki
|
|
|
Site preperation inspection required.
|
Routing - MECHANICAL | 10/20/2017 | | 10/20/2017 | | FAIL |
Troy James
|
|
|
emailed correction to legends mech
|
Routing - PLANNING | 10/20/2017 | | 10/20/2017 | | PASS |
Sue Cummings
|
|
|
No review required at fron desk
|
Routing - Addressing | 10/20/2017 | | 10/20/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/20/2017 | | 10/20/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/20/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/20/2017 | | DONE |
|
|
|
|
Intake Approval | | | 10/20/2017 | | PASS |
|
|
|
Appeal period ended Oct 19th at 5pm
|
Intake Approval | | | 10/12/2017 | | FAIL |
|
|
|
(10-12-17) As stated in previous comments, please do not resubmit until after the appeal period ends on October 19, 2017 at 5:00pm.
If resubmitted before that date you will be subject to an administrative fee of $46.31.
|
Intake Approval | | | 10/10/2017 | | FAIL |
|
|
|
waiting for planning and zoning appeal period ending on October 19th at 5:00PM at that time the applicant will be allowed to submit for their building permit.
|
Intake Approval | | | 9/28/2017 | | FAIL |
|
|
|
CFH permit/application has not been completed
|
Intake Approval | | | 9/27/2017 | | FAIL |
|
|
|
CAT II need to apply for 114 first per Melissa
|
Application received | | | 9/21/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 21 2017 7:08PM
|
BLD-Conference | 12/19/2018 | 1/11/2019 | | A | |
Dave Hannah
|
|
|
check on items for final 422 4343
|