Second Notice | | 11/19/2018 | 12/11/2018 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
First Notice | | 10/19/2018 | 11/9/2018 | | DONE |
|
|
|
mailed 11-12
|
Zoning Approval | 10/9/2018 | 10/9/2018 | 10/9/2018 | | DONE |
Andrea Tuning
|
|
|
|
Permanent Occupancy | | | 10/9/2018 | | DONE |
|
|
|
|
BLD-Final | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Mike Jordan
|
|
|
later morning- Adam Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
|
FIRE-Final Inspection | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, hood suppression system inspection complete, knox box is located by main entry. Final life fire safety inspection complete.
early morning- Adam Phone #: ###-####
|
Temporary Occupancy | 8/21/2018 | 11/19/2018 | 8/21/2018 | | DONE |
Tisha Gallop
|
|
|
pending Zoning approval
|
PubWorks Occupancy Approval | 8/21/2018 | 8/21/2018 | 8/21/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PEND |
Mike Jordan
|
|
|
fire finals expected today. Thank you Michael McHargue Phone #: ###-#### Inspection requested via web by Mike McHargue. Walk through. Needs fire/life/safety and public works.
|
Zoning Approval Temp | 8/16/2018 | 8/16/2018 | 8/16/2018 | | PASS |
Katelyn Menuge
|
|
|
Temporary Occupancy BND18-00096
|
FIRE-Final Inspection | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | FAIL |
Troy Cobbley
|
|
|
FIre life safety will be ok to pass when the fire dept access signage is installed and the project related fire alarm, fire sprinkerl and hood suppression system permits are finaled.
Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Ceiling Grid Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | A | PASS |
Brandon Shaw
|
|
|
Grid Ceiling Inspection. Troy to inspect FS at 7AM this morning. Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Ceiling Grid Inspection | 7/19/2018 | 7/20/2018 | 7/20/2018 | P | NR |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Needs fire sprinkler rough in inspection.
|
BLD-Energy code compliance | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | PART |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Work in progress on installing insulation. Still needs to fix truss and add missed lateral bracing.
|
BLD-Framing/Rough-in | 4/30/2018 | 5/2/2018 | 5/2/2018 | A | FAIL |
Mike Jordan
|
|
|
adam Phone #: ###-####. Complete lateral bracing on S3 and S4, A01 trusses. Strap top plate in vestibule at line st penetration. provide approved fix for S2 truss. Ok to insulate.
|
BLD-Framing/Rough-in | 4/27/2018 | 4/30/2018 | 4/30/2018 | P | NR |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Nees to complete air seal prior to framing inspection.
|
BLD-Conference | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | DONE |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Wall Bracing | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####. STDH10 holdowns ok per the engineer of record and are nailed off.
|
BLD-Wall Bracing | 3/27/2018 | 3/27/2018 | 3/28/2018 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-#### nailing ok but straps not nailed and engineering called out for hd hold downs and crew used straps engineer needs ot aprove
|
BLD-Other | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | DONE |
Mike Jordan
|
|
|
roof shear // Adam Joslin Phone #: ###-####
|
BLD-Other | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Mike Jordan
|
|
|
roof shear // Adam Phone #: ###-####
|
BLD-Foundation | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Mike Jordan
|
|
|
Column bolts and grout Phone #: ###-#### Inspection requested via web by Mike McHargue
|
OVERRIDE | | | 1/26/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 1/24/2018 | 1/24/2018 | 1/26/2018 | | DONE |
Julie Romig
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/26/2018 | | DONE |
|
|
|
Need to add routing to PW Drainage & Street lights. No new plans, mod for routing only.**WILL BE IN NEXT WEEK TO PAY THE ADDITIONAL PW FEES**
|
Routing - PLAN CHECK | 1/24/2018 | | 1/26/2018 | | PASS |
Julie Romig
|
|
|
Routed for additional Public Works review only, no revisions made to project.
|
Permit Ready to Issue | | | 1/26/2018 | | DONE |
|
|
|
|
Routing PW Drainage | 1/24/2018 | | 1/25/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 1/24/2018 | | 1/24/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 1/24/2018 | | 1/24/2018 | | PASS |
Rachael Beierle
|
|
|
ROUTED TO DRAINAGE AND LIGHTS FOR REVIEW.
|
Plan Modification Accepted | | | 1/24/2018 | | DONE |
Christina Prado
|
|
|
Need to add routing to PW Drainage & Street lights. No new plans, mod for routing only
|
BLD-Energy code compliance | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | NR |
Mike Jordan
|
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue. Moved to pm
|
BLD-Foundation | 1/12/2018 | 1/16/2018 | 1/17/2018 | P | DEFR |
Mike Jordan
|
|
|
Manuel Phone #: ###-####. Foundation placed yesterday 1-15-18.(holiday) Contractor had special inspection.
|
BLD-Energy code compliance | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | CANC |
Mike Jordan
|
|
|
Late PM if possible foundation insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
|
BLD-Energy code compliance | 1/16/2018 | 1/16/2018 | 1/16/2018 | A | CANC |
Mike Jordan
|
|
|
Late AM if possible. Foundation insulation. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
|
BLD-Foundation | 1/11/2018 | 1/12/2018 | 1/12/2018 | P | CANC |
Mike Jordan
|
|
|
Manual Phone #: ###-####
|
BLD-Foundation | 1/10/2018 | 1/11/2018 | 1/11/2018 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Cancelled per Dane.
|
BLD-Footing | 1/9/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
Print Occupancy Form | | | 12/21/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/21/2017 | | DONE |
|
|
|
|
Routing PW Sewer Design | 11/30/2017 | | 12/20/2017 | | PASS |
Mike Sheppard
|
|
|
|
OVERRIDE | | | 12/19/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 10/12/2017 | 10/12/2017 | 12/19/2017 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rec'd 11/30 - 502 Pad Thai Restaurant
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/19/2017 | | DONE |
|
|
|
all met-NEED
ACHD-met
GC Form-met
Revised Cert-met
|
Routing Off Site - STRUCTURAL | 12/15/2017 | | 12/18/2017 | | PASS |
Julie Romig
|
|
|
3rd Review
|
Routing - PLAN CHECK | 12/15/2017 | | 12/15/2017 | | PASS |
Julie Romig
|
|
|
3rd Review
|
Routing - PLAN CHECK | 11/30/2017 | | 12/8/2017 | | FAIL |
Julie Romig
|
|
|
2nd Review - Corrections required per ePlanReview
|
Routing Off Site - STRUCTURAL | 11/30/2017 | | 12/7/2017 | | FAIL |
Julie Romig
|
|
|
2nd Review - Corrections required per ePlanReview
|
Routing PW Environmental | 11/30/2017 | | 12/5/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 12/4/2017 | | 12/4/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing PW Solid Waste | 11/30/2017 | | 11/30/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Design Review | 11/30/2017 | | 11/30/2017 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 11/28/2017 | 12/1/2017 | 11/29/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/28/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 10/12/2017 | | 11/28/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLANNING Land Div | 10/12/2017 | | 11/27/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLANNING | 10/12/2017 | | 11/27/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing Off Site - STRUCTURAL | 10/12/2017 | | 10/25/2017 | | FAIL |
Julie Romig
|
|
|
Corrections Required per ePlanReview
|
Routing - FIRE | 10/12/2017 | 10/12/2017 | 10/17/2017 | | PASS |
Scott Arellano
|
|
|
Attached review comments to case
|
Routing - Erosion and Sediment | 10/12/2017 | | 10/17/2017 | | PASS |
Michael Zawacki
|
|
|
Site prep required.
|
Routing - PLUMBING | 10/12/2017 | | 10/16/2017 | | FAIL |
Bill VanDegrift
|
|
|
1) disposals are not allowed by Public Works Pretreatment.
2) all kitchen fixtures except hand sinks must be indirectly wasted.
3) conect expansion tank on water heater side of the check valve.
|
Routing PW Solid Waste | 10/13/2017 | | 10/16/2017 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 18 feet of unobstructed clearance between gate posts to ensure that the dumpsters can be serviced properly.
The front of the dumpsters must be oriented towards the enclosure opening; otherwise the truck will be unable to service the dumpsters properly. Suggest using the standard double-dumpster enclosure design from the location design standards policy.
|
Routing PW Sewer Design | 10/13/2017 | | 10/13/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Submit public sewer extension to Public Works for review and approval.
|
Routing - Design Review | 10/12/2017 | | 10/13/2017 | | FAIL |
Andrea Tuning
|
|
|
A parcel consolidation and lot line adjustment has not been completed at this time. This is required to be completed prior to issuance of a building permit.
|
Routing - MECHANICAL | 10/12/2017 | | 10/13/2017 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2017 | | 10/13/2017 | | PASS |
Rachael Beierle
|
|
|
MUST SUPPLY OWN SERVICE LINE.
|
Routing - Addressing | 10/12/2017 | | 10/13/2017 | | PASS |
Doug Chausow
|
|
|
|
Plan Reviewer's activity | | | 10/12/2017 | | PASS |
|
|
|
Plan intake approved
|
Intake Approval | | | 10/12/2017 | | PASS |
|
|
|
|
Intake Approval | | | 10/10/2017 | | FAIL |
|
|
|
(10-10-17) Please see the circled items in the plan intake checklist that do not have and "OK" in the circle. Please resolve each item as directed.
|
Application received | | | 10/4/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 4 2017 12:09PM
|
Intake Approval | | | 10/4/2017 | | FAIL |
|
|
|
(10-4-17) Please see the circled items in the plan intake checklist. Please resolve each item as directed.
|
Routing PW Environmental | 10/13/2017 | | | | FAIL |
|
|
|
No Garbage Disposal allowed.
|