Permit Information
Permit NumberBLD17-03581
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 10038 W OVERLAND RD
Project NamePad Thai House Restaurant
Customer Number 
ePlanReviewYes
Description
(PAD THAI HOUSE RESTAURANT) **Permit for the construction of a new 4,796 sq. ft. restaurant with work to include a concrete foundation, slab on grade floor, and wood framed type VB structure above along with related site improvements, per the approved plans. This building is fully fire sprinklered for A2 occupancy over 100. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/19/201812/11/2018 DONE
This permit finaled on the web by Mike McHargue
First Notice 10/19/201811/9/2018 DONE
mailed 11-12
Zoning Approval10/9/201810/9/201810/9/2018 DONE
DetailsAndrea Tuning
Permanent Occupancy  10/9/2018 DONE
BLD-Final8/21/20188/21/20188/21/2018PCANC
DetailsMike Jordan
BLD-Final8/20/20188/21/20188/21/2018APASS
DetailsMike Jordan
later morning- Adam Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection8/20/20188/21/20188/21/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, hood suppression system inspection complete, knox box is located by main entry. Final life fire safety inspection complete.

early morning- Adam Phone #: ###-####
Temporary Occupancy8/21/201811/19/20188/21/2018 DONE
DetailsTisha Gallop
pending Zoning approval
PubWorks Occupancy Approval8/21/20188/21/20188/21/2018 DONE
DetailsTiffany Lowery
BLD-Final8/17/20188/17/20188/17/2018PPEND
DetailsMike Jordan
fire finals expected today. Thank you Michael McHargue Phone #: ###-#### Inspection requested via web by Mike McHargue. Walk through. Needs fire/life/safety and public works.
Zoning Approval Temp8/16/20188/16/20188/16/2018 PASS
DetailsKatelyn Menuge
Temporary Occupancy BND18-00096
FIRE-Final Inspection8/14/20188/15/20188/15/2018AFAIL
DetailsTroy Cobbley
FIre life safety will be ok to pass when the fire dept access signage is installed and the project related fire alarm, fire sprinkerl and hood suppression system permits are finaled.

Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Ceiling Grid Inspection7/23/20187/23/20187/23/2018APASS
DetailsBrandon Shaw
Grid Ceiling Inspection. Troy to inspect FS at 7AM this morning.
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Ceiling Grid Inspection7/19/20187/20/20187/20/2018PNR
DetailsMike Jordan
Adam Phone #: ###-####. Needs fire sprinkler rough in inspection.
BLD-Energy code compliance5/4/20185/4/20185/4/2018PPASS
DetailsMike Jordan
Adam Phone #: ###-####
BLD-Framing/Rough-in5/4/20185/4/20185/4/2018PPASS
DetailsMike Jordan
Adam Phone #: ###-####
BLD-Framing/Rough-in5/2/20185/3/20185/3/2018PPART
DetailsMike Jordan
Adam Phone #: ###-####. Work in progress on installing insulation. Still needs to fix truss and add missed lateral bracing.
BLD-Framing/Rough-in4/30/20185/2/20185/2/2018AFAIL
DetailsMike Jordan
adam Phone #: ###-####. Complete lateral bracing on S3 and S4, A01 trusses. Strap top plate in vestibule at line st penetration. provide approved fix for S2 truss. Ok to insulate.
BLD-Framing/Rough-in4/27/20184/30/20184/30/2018PNR
DetailsMike Jordan
Adam Phone #: ###-####. Nees to complete air seal prior to framing inspection.
BLD-Conference4/11/20184/12/20184/12/2018ADONE
DetailsMike Jordan
Adam Phone #: ###-####
BLD-Wall Bracing3/28/20183/28/20183/28/2018PPASS
DetailsMike Jordan
Adam Phone #: ###-####. STDH10 holdowns ok per the engineer of record and are nailed off.
BLD-Wall Bracing3/27/20183/27/20183/28/2018PPEND
DetailsDave Hannah
Adam Phone #: ###-#### nailing ok but straps not nailed and engineering called out for hd hold downs and crew used straps engineer needs ot aprove
BLD-Other3/20/20183/20/20183/20/2018PDONE
DetailsMike Jordan
roof shear // Adam Joslin Phone #: ###-####
BLD-Other3/16/20183/16/20183/16/2018PPASS
DetailsMike Jordan
roof shear // Adam Phone #: ###-####
BLD-Foundation2/13/20182/13/20182/13/2018PPASS
DetailsMike Jordan
Column bolts and grout Phone #: ###-#### Inspection requested via web by Mike McHargue
OVERRIDE  1/26/2018  
Plan assigned to (JAR)1/24/20181/24/20181/26/2018 DONE
DetailsJulie Romig
CHANGE STATUS TO (ISS)  1/26/2018 DONE
Need to add routing to PW Drainage & Street lights. No new plans, mod for routing only.**WILL BE IN NEXT WEEK TO PAY THE ADDITIONAL PW FEES**
Routing - PLAN CHECK1/24/2018 1/26/2018 PASS
DetailsJulie Romig
Routed for additional Public Works review only, no revisions made to project.
Permit Ready to Issue  1/26/2018 DONE
Routing PW Drainage1/24/2018 1/25/2018 PASS
DetailsBrian Murphy
Routing PW Street Lights1/24/2018 1/24/2018 PASS
DetailsTom Marshall
Routing - PUBLIC WORKS1/24/2018 1/24/2018 PASS
DetailsRachael Beierle
ROUTED TO DRAINAGE AND LIGHTS FOR REVIEW.
Plan Modification Accepted  1/24/2018 DONE
DetailsChristina Prado
Need to add routing to PW Drainage & Street lights. No new plans, mod for routing only
BLD-Energy code compliance1/17/20181/17/20181/17/2018PPASS
DetailsMike Jordan
BLD-Energy code compliance1/16/20181/17/20181/17/2018ANR
DetailsMike Jordan
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue. Moved to pm
BLD-Foundation1/12/20181/16/20181/17/2018PDEFR
DetailsMike Jordan
Manuel Phone #: ###-####. Foundation placed yesterday 1-15-18.(holiday) Contractor had special inspection.
BLD-Energy code compliance1/16/20181/16/20181/16/2018PCANC
DetailsMike Jordan
Late PM if possible foundation insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Energy code compliance1/16/20181/16/20181/16/2018ACANC
DetailsMike Jordan
Late AM if possible. Foundation insulation. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Foundation1/11/20181/12/20181/12/2018PCANC
DetailsMike Jordan
Manual Phone #: ###-####
BLD-Foundation1/10/20181/11/20181/11/2018PNR
DetailsMike Jordan
Dane Phone #: ###-####. Cancelled per Dane.
BLD-Footing1/9/20181/10/20181/10/2018PPASS
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing1/8/20181/9/20181/9/2018ACANC
DetailsMike Jordan
Dane Phone #: ###-####
Print Occupancy Form  12/21/2017 DONE
Issue PAID IN FULL permit  12/21/2017 DONE
Routing PW Sewer Design11/30/2017 12/20/2017 PASS
DetailsMike Sheppard
OVERRIDE  12/19/2017  
Plan assigned to (JAR)10/12/201710/12/201712/19/2017 DONE
DetailsJulie Romig
**1st Rev Comp - 2nd Rec'd 11/30 - 502 Pad Thai Restaurant
PLANS/APPL TAKEN TO FRONT DESK  12/19/2017 DONE
Permit Ready to Issue  12/19/2017 DONE
all met-NEED
ACHD-met
GC Form-met
Revised Cert-met
Routing Off Site - STRUCTURAL12/15/2017 12/18/2017 PASS
DetailsJulie Romig
3rd Review
Routing - PLAN CHECK12/15/2017 12/15/2017 PASS
DetailsJulie Romig
3rd Review
Routing - PLAN CHECK11/30/2017 12/8/2017 FAIL
DetailsJulie Romig
2nd Review - Corrections required per ePlanReview
Routing Off Site - STRUCTURAL11/30/2017 12/7/2017 FAIL
DetailsJulie Romig
2nd Review - Corrections required per ePlanReview
Routing PW Environmental11/30/2017 12/5/2017 PASS
DetailsRick Christenson
Routing - PLUMBING12/4/2017 12/4/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Solid Waste11/30/2017 11/30/2017 PASS
DetailsEvan Carpenter
Routing - Design Review11/30/2017 11/30/2017 PASS
DetailsAndrea Tuning
Route to Impact Fee Review11/28/201712/1/201711/29/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  11/28/2017 FAIL
DetailsJulie Romig
Routing - PLAN CHECK10/12/2017 11/28/2017 FAIL
DetailsJulie Romig
Routing - PLANNING Land Div10/12/2017 11/27/2017 PASS
DetailsTodd Tucker
Routing - PLANNING10/12/2017 11/27/2017 PASS
DetailsTodd Tucker
Routing Off Site - STRUCTURAL10/12/2017 10/25/2017 FAIL
DetailsJulie Romig
Corrections Required per ePlanReview
Routing - FIRE10/12/201710/12/201710/17/2017 PASS
DetailsScott Arellano
Attached review comments to case
Routing - Erosion and Sediment10/12/2017 10/17/2017 PASS
DetailsMichael Zawacki
Site prep required.
Routing - PLUMBING10/12/2017 10/16/2017 FAIL
DetailsBill VanDegrift
1) disposals are not allowed by Public Works Pretreatment.
2) all kitchen fixtures except hand sinks must be indirectly wasted.
3) conect expansion tank on water heater side of the check valve.
Routing PW Solid Waste10/13/2017 10/16/2017 FAIL
DetailsEvan Carpenter
The solid waste enclosure must have at least 18 feet of unobstructed clearance between gate posts to ensure that the dumpsters can be serviced properly.

The front of the dumpsters must be oriented towards the enclosure opening; otherwise the truck will be unable to service the dumpsters properly. Suggest using the standard double-dumpster enclosure design from the location design standards policy.
Routing PW Sewer Design10/13/2017 10/13/2017 FAIL
DetailsKyle S. Rosenmeyer
Submit public sewer extension to Public Works for review and approval.
Routing - Design Review10/12/2017 10/13/2017 FAIL
DetailsAndrea Tuning
A parcel consolidation and lot line adjustment has not been completed at this time. This is required to be completed prior to issuance of a building permit.
Routing - MECHANICAL10/12/2017 10/13/2017 PASS
DetailsTroy James
Routing - PUBLIC WORKS10/12/2017 10/13/2017 PASS
DetailsRachael Beierle
MUST SUPPLY OWN SERVICE LINE.
Routing - Addressing10/12/2017 10/13/2017 PASS
DetailsDoug Chausow
Plan Reviewer's activity  10/12/2017 PASS
Plan intake approved
Intake Approval  10/12/2017 PASS
Intake Approval  10/10/2017 FAIL
(10-10-17) Please see the circled items in the plan intake checklist that do not have and "OK" in the circle. Please resolve each item as directed.
Application received  10/4/2017 DONE
Application submitted via PDS Online on Oct 4 2017 12:09PM
Intake Approval  10/4/2017 FAIL
(10-4-17) Please see the circled items in the plan intake checklist. Please resolve each item as directed.
Routing PW Environmental10/13/2017   FAIL
No Garbage Disposal allowed.