BLD-Aging Inspection | 4/10/2018 | 4/10/2018 | 4/10/2018 | | CANC |
Mike Jordan
|
|
|
|
BLD-Footing | 11/25/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Mike Jordan
|
|
|
This footing inspection can be for the PM on Monday. Jason will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Issue PAID IN FULL permit | | | 11/3/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 10/23/2017 | 10/23/2017 | 10/24/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/24/2017 | | 10/24/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/24/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/24/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 10/24/2017 | | DONE |
|
|
|
met
|
Telephone call | | | 10/24/2017 | | DONE |
|
|
|
called Rich and left message permit is ready and fee due.
|
Routing Walk-In (Zoning) | 10/23/2017 | 10/23/2017 | 10/23/2017 | A | PASS |
Nicolette Womack
|
|
|
|
Routing Walk-In (BLD) | 10/23/2017 | 10/23/2017 | 10/23/2017 | A | PASS |
Josh Bogle
|
|
|
applicant dropped plans off, took in as level 2
|
Application received | | 10/23/2017 | | | |
|
|
|
|