Permit Information
Permit NumberBLD17-04248
StatusFinaled
Name RIVERBROOK HOMES INC
Site Address 8702 W POCONO LN
Project NameLot 5
Customer NumberDEMO BLD17-00299/ COMMENTS FOR PERM
ePlanReview 
Description
(12 PERMITS FILED UNDER BLD17-04203 IN EPLANREVIEW) Permit for the construction of a new 1247 sq. ft., two story (first story 648 sq. ft., second story 599 sq. ft.) townhouse with 2 bedrooms, 2.5 bathrooms, and approximately 10 sq. ft. of covered porch per the approved plans and any notations. R-3D zoning and setbacks per planning. Meets prescriptive energy code and better. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/17/201812/17/201812/17/2018PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Nate Mitchell
DOC - Permit Finaled12/17/201812/17/201812/17/2018PPASS
DetailsJim Sly
BLD-Final12/4/201812/4/201812/5/2018PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell// needs trades,, road sign
BLD-Aging Inspection9/5/20189/5/20189/5/2018 PASS
DetailsTony Young
BLD-Aging Inspection9/4/20189/4/20189/5/2018 PASS
DetailsTony Young
BLD-Energy code compliance4/20/20184/23/20184/23/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD-Energy code compliance4/20/20184/20/20184/20/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchelll, framing made ok, need to repair firewall
BLD-Framing/Rough-in4/13/20184/13/20184/13/2018PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell,, needs engineer approval as built or strap, nail, per plans and justify
BLD-Wall Bracing3/14/20183/15/20183/15/2018APEND
DetailsTony Young
Please call first Phone #: ###-#### Inspection requested via web by Nate Mitchell,, needs to fix per engineering,, then re-call inspection
BLD-Wall Bracing3/14/20183/14/20183/14/2018PNR
DetailsTony Young
Please call first Phone #: ###-#### Inspection requested via web by Nate Mitchell,, may need to get the engineer out to see,, missed hold downs, etc. covered,, need to meet on site
BLD-Wall Bracing2/8/20182/8/20182/8/2018APART
DetailsTony Young
Please call first. Nate Phone #: ###-#### Inspection requested via web by Nate Mitchell,, firewall,, work in progress,, needs fire blocking between walls at 10' max
BLD-Footing1/9/20181/9/20181/9/2018PDONE
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD-Footing1/9/20181/9/20181/9/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD-Footing1/3/20181/5/20181/5/2018PNR
DetailsJim Sly
Huron Phone #: ###-####
Issue PAID IN FULL permit  1/3/2018 DONE
(F) Reprint permit  1/3/2018 DONE
Inspection Record Card- Bld  1/3/2018 DONE
OVERRIDE  12/29/2017  
Plan assigned to (BJM)11/21/201711/21/201712/29/2017 DONE
DetailsBrian McGowan
1st review complete -12/8 Townhome L2 paper
Routing - MECHANICAL12/19/2017 12/29/2017 PASS
DetailsTroy James
Routing - PLAN CHECK12/29/2017 12/29/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  12/29/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  12/29/2017 DONE
12 permits total
Routing - PLAN CHECK12/19/2017 12/27/2017 FAIL
DetailsBrian McGowan
Structure did not match Architectural
Routing - Design Review12/19/2017 12/20/2017 PASS
DetailsSarah Schafer
Approved per DRH17-00039.
1st review completed  12/6/2017 FAIL
DetailsBrian McGowan
Engineering as individual units required.
Routing - PLAN CHECK  12/6/2017 FAIL
DetailsBrian McGowan
Engineering as individual units required.
Routing - MECHANICAL11/24/2017 11/24/2017 FAIL
DetailsTroy James
Routing - PLANNING11/22/2017 11/24/2017 PASS
DetailsColleen T Carroll
PUD16-00031/DRH17-00039
Routing - Design Review11/24/2017 11/24/2017 FAIL
DetailsSarah Schafer
The plans failed per the requirements of DRH17-00038. The side entry access to the unit adjacent to the parking area was not provided and the landscape plan shown on the cover sheet was not a detailed landscape plan nor did it match the plan in the DR file. Notes were made to the requirement for the entry and canopy on sheets A0.1, A03, A2.1 and A3.
Route to Impact Fee Review11/21/201711/24/201711/22/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing11/21/2017 11/22/2017 PASS
DetailsLaura Hunter
Corrected post type from Dr to Ln
Routing - PUBLIC WORKS  11/22/2017 PASS
NO CREDIT FOR DEMO. NEVER CONNECTED TO SEWER.
Plans ACCEPTED BY PLAN TECH  11/21/2017 DONE
Recd Pcfee & Taken To Pln CK  11/21/2017 DONE
Intake Approval  11/21/2017 PASS
Application received 11/20/2017