BLD-Final | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
DOC - Permit Finaled | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/4/2018 | 12/4/2018 | 12/5/2018 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell// needs trades,, road sign
|
BLD-Aging Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/4/2018 | 9/4/2018 | 9/5/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 4/20/2018 | 4/23/2018 | 4/23/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Energy code compliance | 4/20/2018 | 4/20/2018 | 4/20/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchelll, framing made ok, need to repair firewall
|
BLD-Framing/Rough-in | 4/13/2018 | 4/13/2018 | 4/13/2018 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell,, needs engineer approval as built or strap, nail, per plans and justify
|
BLD-Wall Bracing | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PEND |
Tony Young
|
|
|
Please call first Phone #: ###-#### Inspection requested via web by Nate Mitchell,, needs to fix per engineering,, then re-call inspection
|
BLD-Wall Bracing | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | NR |
Tony Young
|
|
|
Please call first Phone #: ###-#### Inspection requested via web by Nate Mitchell,, may need to get the engineer out to see,, missed hold downs, etc. covered,, need to meet on site
|
BLD-Wall Bracing | 2/8/2018 | 2/8/2018 | 2/8/2018 | A | PART |
Tony Young
|
|
|
Please call first. Nate Phone #: ###-#### Inspection requested via web by Nate Mitchell,, firewall,, work in progress,, needs fire blocking between walls at 10' max
|
BLD-Footing | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Footing | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Footing | 1/3/2018 | 1/5/2018 | 1/5/2018 | P | NR |
Jim Sly
|
|
|
Huron Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/3/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/3/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 12/29/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 11/21/2017 | 11/21/2017 | 12/29/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete -12/8 Townhome L2 paper
|
Routing - MECHANICAL | 12/19/2017 | | 12/29/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 12/29/2017 | | 12/29/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/29/2017 | | DONE |
|
|
|
12 permits total
|
Routing - PLAN CHECK | 12/19/2017 | | 12/27/2017 | | FAIL |
Brian McGowan
|
|
|
Structure did not match Architectural
|
Routing - Design Review | 12/19/2017 | | 12/20/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH17-00039.
|
1st review completed | | | 12/6/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering as individual units required.
|
Routing - PLAN CHECK | | | 12/6/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering as individual units required.
|
Routing - MECHANICAL | 11/24/2017 | | 11/24/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 11/22/2017 | | 11/24/2017 | | PASS |
Colleen T Carroll
|
|
|
PUD16-00031/DRH17-00039
|
Routing - Design Review | 11/24/2017 | | 11/24/2017 | | FAIL |
Sarah Schafer
|
|
|
The plans failed per the requirements of DRH17-00038. The side entry access to the unit adjacent to the parking area was not provided and the landscape plan shown on the cover sheet was not a detailed landscape plan nor did it match the plan in the DR file. Notes were made to the requirement for the entry and canopy on sheets A0.1, A03, A2.1 and A3.
|
Route to Impact Fee Review | 11/21/2017 | 11/24/2017 | 11/22/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 11/21/2017 | | 11/22/2017 | | PASS |
Laura Hunter
|
|
|
Corrected post type from Dr to Ln
|
Routing - PUBLIC WORKS | | | 11/22/2017 | | PASS |
|
|
|
NO CREDIT FOR DEMO. NEVER CONNECTED TO SEWER.
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/21/2017 | | DONE |
|
|
|
|
Intake Approval | | | 11/21/2017 | | PASS |
|
|
|
|
Application received | | 11/20/2017 | | | |
|
|
|
|