Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD17-04249
StatusFinaled
Name RIVERBROOK HOMES INC
Site Address 8704 W POCONO LN
Project NameLot 6
Customer NumberSEE COMMENTS FOR PERMIT #S
ePlanReviewYes
Description
(12 PERMITS FILED UNDER BLD17-04249 IN EPLANREVIEW) Permit for the construction of a new 1247 sq. ft., two story (first story 648 sq. ft., second story 599 sq. ft.) townhouse with 2 bedrooms, 2.5 bathrooms, and approximately 10 sq. ft. of covered porch per the approved plans and any notations. R-3D zoning and setbacks per planning. Meets prescriptive energy code and better. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/14/201812/14/201812/21/2018 DONE
DetailsTony Young
BLD-Final12/17/201812/17/201812/17/2018PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Nate Mitchell
DOC - Permit Finaled12/17/201812/17/201812/17/2018PPASS
DetailsJim Sly
BLD-Aging Inspection12/13/201812/13/201812/14/2018 PEND
DetailsTony Young
BLD-Final12/4/201812/4/201812/5/2018PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchellll// needs trades,, road sign
BLD-Energy code compliance8/1/20188/1/20188/1/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD-Framing/Rough-in7/18/20187/18/20187/18/2018APART
DetailsTony Young
please call nate Phone #: ###-#### Inspection requested via web by Nate Mitchell,, needs fire caulking,, stair rise fixed,, ok to insulate
BLD-Wall Bracing6/19/20186/20/20186/20/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD-Wall Bracing6/19/20186/19/20186/19/2018PFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD-Wall Bracing5/17/20185/17/20185/17/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD-Wall Bracing5/10/20185/10/20185/10/2018PPART
DetailsTony Young
drywall Phone #: ###-#### Inspection requested via web by Nate Mitchell,, 1st floor firewall ok
BLD-Footing1/9/20181/9/20181/9/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD-Footing1/3/20181/5/20181/5/2018PNR
DetailsJim Sly
Huron Phone #: ###-####
Issue PAID IN FULL permit  1/3/2018 DONE
Inspection Record Card- Bld  1/3/2018 DONE
OVERRIDE  12/29/2017  
Plan assigned to (BJM)11/21/201711/21/201712/29/2017 DONE
DetailsBrian McGowan
1st review complete –12/8 Townhome L2 paper
Routing - PLAN CHECK12/29/2017 12/29/2017 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  12/29/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  12/29/2017 DONE
Met
Routing - PLAN CHECK12/19/2017 12/27/2017 FAIL
DetailsBrian McGowan
Structure did not match Architectural
Routing - Design Review12/19/2017 12/20/2017 PASS
DetailsSarah Schafer
Approved per DRH17-00039.
Routing - MECHANICAL12/19/2017 12/19/2017 PASS
DetailsTroy James
1st review completed  12/6/2017 FAIL
DetailsBrian McGowan
Engineering as individual units required.
Routing - PLAN CHECK  12/6/2017 FAIL
DetailsBrian McGowan
Engineering as individual units required.
Routing - MECHANICAL11/24/2017 11/24/2017 FAIL
DetailsTroy James
Routing - PLANNING11/22/2017 11/24/2017 PASS
DetailsColleen T Carroll
PUD16-00031/DRH17-00039
Routing - Design Review11/24/2017 11/24/2017 FAIL
DetailsSarah Schafer
The plans failed per the requirements of DRH17-00038. The side entry access to the unit adjacent to the parking area was not provided and the landscape plan shown on the cover sheet was not a detailed landscape plan nor did it match the plan in the DR file. Notes were made to the requirement for the entry and canopy on sheets A0.1, A03, A2.1 and A3.
Route to Impact Fee Review11/21/201711/24/201711/22/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing11/21/2017 11/22/2017 PASS
DetailsLaura Hunter
Corrected post type from Dr to Ln
Routing - PUBLIC WORKS  11/22/2017 PASS
Plans ACCEPTED BY PLAN TECH  11/21/2017 DONE
Recd Pcfee & Taken To Pln CK  11/21/2017 DONE
Intake Approval  11/21/2017 PASS
Application received 11/20/2017