BLD-Conference | 2/11/2019 | 2/12/2019 | 2/12/2019 | P | PEND |
Dave Hannah
|
|
|
this is for rough in for electrical, framing, and plumbing for bathroom remodel Phone #: ###-#### Inspection requested via web by Doug Wimer ok after they get a plumbing and elec rough in sign off.
|
Routing Walk-In (BLD) | 1/23/2019 | 1/23/2019 | 1/23/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 1/23/2019 | 1/23/2019 | 1/23/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/23/2019 | | 1/23/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/23/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/23/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 1/23/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/23/2019 | | DONE |
|
|
|
adding bathroom remodel
|
BLD-Framing/Rough-in | 2/1/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Jim Sly
|
|
|
Doug Wimer Phone #: ###-#### Frame and energy......OK
|
Routing Walk-In (BLD) | 12/20/2017 | 12/20/2017 | 12/20/2017 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/20/2017 | | 12/20/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/20/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/20/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/20/2017 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 12/20/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 12/15/2017 | 12/15/2017 | 12/15/2017 | A | FAIL |
Josh Bogle
|
|
|
need more info
|
Routing - PLAN CHECK | 12/15/2017 | | 12/15/2017 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 12/15/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 12/15/2017 | | | |
|
|
|
|