BLD-Final | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Andrina Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.90
|
BLD-Final | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | FAIL |
Dave Hannah
|
|
|
Garage code 1919 Phone #: ###-#### Inspection requested via web by Andrina Davis c/n on elec panel in garage
|
BLD-Final | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | NR |
Tony Young
|
|
|
garage code 1919 Phone #: ###-#### Inspection requested via web by Andrina Davis,, need fire caulking,, blower door test,, protection post ballard in front of gas appliances in the garage, clean crawl, door trim, hardware, seals etc.
|
BLD-Energy code compliance | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis,,m strap 2 plates,, seal 2 holes,, ok to insulate
|
BLD-Energy code compliance | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis,, need 2 straps on top plates,, seal 2 holes in plates,, ok to insulate
|
BLD-Wall Bracing | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Foundation | 1/17/2018 | 1/18/2018 | 1/18/2018 | P | DONE |
Tony Young
|
|
|
pour at 1pm // Paul Phone #: ###-####
|
BLD-Footing | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | PASS |
Tony Young
|
|
|
Andrina Phone #: ###-####
|
BLD-Other | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | CANC |
Tony Young
|
|
|
Shaun-fire caulking 4th floor units 409-419 Phone #: ###-####,, wrong permit called in
|
Issue PAID IN FULL permit | | | 1/16/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/16/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/12/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 1/3/2018 | 1/3/2018 | 1/12/2018 | | DONE |
Rob Patrick
|
|
|
1/11 sfd L1 ePlan Fail for Tall Wall Engineering
|
Routing - PLAN CHECK | 1/12/2018 | | 1/12/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/12/2018 | | DONE |
|
|
|
|
1st review completed | | | 1/8/2018 | | FAIL |
Rob Patrick
|
|
|
Need Tall Wall engineering
|
Plan Reviewer's activity | | | 1/8/2018 | | FAIL |
Rob Patrick
|
|
|
|
Route to Impact Fee Review | 12/29/2017 | 1/1/2018 | 1/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 12/29/2017 | | 1/2/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/29/2017 | | 1/2/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 12/29/2017 | | 1/2/2018 | | PASS |
Troy James
|
|
|
|
Plan assigned to (BJM) | 12/29/2017 | 12/29/2017 | 12/29/2017 | | DEFR |
Brian McGowan
|
|
|
1/12 sfd L1 ePlan
|
Routing - PLANNING | 12/29/2017 | | 12/29/2017 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 12/29/2017 | | FAIL |
|
|
|
Still needs REScheck or prescriptive and attic and crawl acesses
|
Plans ACCEPTED BY PLAN TECH | | | 12/29/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/29/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/29/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/28/2017 | | FAIL |
|
|
|
Still missing ResCheck and showing where attic/crawl space access is
|
Intake Approval | | | 12/19/2017 | | FAIL |
|
|
|
Need to separate plans
ResCheck
attice/crawlspace
|
Application received | | | 12/18/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 18 2017 11:22AM
|
Routing - PLAN CHECK | 12/29/2017 | | | | |
Brian McGowan
|
|
|
|