BLD-Final | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Tell Riley
|
|
|
JEREMY Phone #: ###-####//door was changed//advised to adjust hinges to close//
|
DOC - Permit Finaled | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/6/2018 | 9/7/2018 | 9/7/2018 | P | NR |
Jim Sly
|
|
|
Monica Phone #: ###-#### Need code complying door...house/ garage.
|
BLD-Final | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PEND |
Dave Hannah
|
|
|
Monica Phone #: ###-#### needs to sheetrock garage side wall
|
BLD-Final | 8/27/2018 | 8/28/2018 | 8/28/2018 | P | NR |
Jim Sly
|
|
|
Monica Phone #: ###-#### Need Electrical final..
|
BLD-Framing/Rough-in | 4/20/2018 | 4/20/2018 | 4/20/2018 | P | PASS |
Jim Sly
|
|
|
Jeremy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/28/2018 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/16/2018 | 3/16/2018 | 3/19/2018 | | PASS |
Josh Bogle
|
|
|
due 3/22 - garage conversion, already done-tagged
|
Inspection Record Card- Bld | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/19/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/19/2018 | | DONE |
|
|
|
Left a message informing permit is ready to be picked up and the fee amount due (which includes the ele permit also)
|
Routing Walk-In (BLD) | 3/16/2018 | 3/16/2018 | 3/16/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level 2 - waiting for ES reports
|
Routing Walk-In (BLD) | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | FAIL |
Josh Bogle
|
|
|
needs a section view
|
Routing Walk-In (Zoning) | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Brent Moore
|
|
|
|
Routing Walk-In (BLD) | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | FAIL |
Josh Bogle
|
|
|
talke about the issues involved in converting garage space into habitable space - JAB
|
Routing - PLAN CHECK | 3/9/2018 | | 3/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 3/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 3/9/2018 | | | |
|
|
|
|
Routing - PLAN CHECK | 3/16/2018 | | | | |
Josh Bogle
|
|
|
|