BLD-Final | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Brandon Shaw
|
|
|
rolo Phone #: ###-####
|
DOC - Permit Finaled | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Subgrade Approval | 9/20/2018 | 9/20/2018 | 9/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
PubWorks Occupancy Approval | 9/20/2018 | 9/20/2018 | 9/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Framing/Rough-in | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Energy code compliance | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Energy code compliance | 6/21/2018 | 6/22/2018 | 6/23/2018 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner Do Not Cover.....Complete items on Correction notice.
|
BLD-Other | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PEND |
Brandon Shaw
|
|
|
Pending framing corrections
|
BLD-Framing/Rough-in | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PART |
Jim Sly
|
|
|
Wes Phone #: ###-#### Faming OK when bearing point on two A-2 trusses are addressed.
|
BLD-Wall Bracing | 5/22/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
BLD-Foundation | 4/29/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 4/25/2018 | 4/26/2018 | 4/27/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
OVERRIDE | | | 4/25/2018 | | |
|
|
|
|
OVERRIDE | | | 4/25/2018 | | |
|
|
|
|
OVERRIDE | | | 4/25/2018 | | |
|
|
|
|
OVERRIDE | | | 4/25/2018 | | |
|
|
|
|
OVERRIDE | | | 4/25/2018 | | |
|
|
|
|
OVERRIDE | | | 4/25/2018 | | |
|
|
|
|
OVERRIDE | | | 4/25/2018 | | |
|
|
|
|
OVERRIDE | | | 4/25/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 3/14/2018 | 3/14/2018 | 4/25/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete - FAIL- 4-2 sfd L2 ePlan
|
Routing - PLAN CHECK | 4/25/2018 | | 4/25/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2018 | | DONE |
Brian McGowan
|
|
|
|
Override - Parcel Holds | | | 4/25/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 4/25/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/25/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 4/24/2018 | | 4/24/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLAN CHECK | 4/23/2018 | | 4/23/2018 | | FAIL |
Brian McGowan
|
|
|
Must resolve the requirements from Hillside.
|
Routing PW Grading-Hillside | 4/19/2018 | | 4/19/2018 | | FAIL |
Melissa Jannusch
|
|
|
See changemark from 3-14-2018
|
Telephone call | | | 4/18/2018 | | DONE |
|
|
|
recieved email from Chelsea-she was confused about whether the permit was ready or not. I told her it was still in review and that there would still be building fees due when it is made ready
|
Routing - PLAN CHECK | 4/13/2018 | | 4/13/2018 | | FAIL |
Brian McGowan
|
|
|
Did not provide all the requested information.
|
Routing PW Grading-Hillside | 4/6/2018 | | 4/6/2018 | | FAIL |
Melissa Jannusch
|
|
|
See Changemark from 3-14-2018
|
1st review completed | | | 3/30/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/14/2018 | | 3/30/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 3/14/2018 | | 3/16/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 3/14/2018 | 3/17/2018 | 3/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 3/14/2018 | 3/14/2018 | 3/15/2018 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing - Erosion and Sediment | 3/14/2018 | | 3/15/2018 | | PASS |
Michael Zawacki
|
|
|
Harris North. Site prep and inspection required.
|
Routing PW Grading-Hillside | 3/14/2018 | | 3/14/2018 | | FAIL |
Melissa Jannusch
|
|
|
see changemark in ePlan
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/14/2018 | | PASS |
|
|
|
|
Routing - PLANNING | 3/14/2018 | | 3/14/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 3/14/2018 | | 3/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/14/2018 | | 3/14/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 3/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 13 2018 12:56PM
|