Permit Information
Permit NumberBLD18-00970
StatusIssued
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 176 S CAPITOL BLVD
Project NameBusiness Interiors - Awnings
Customer Number 
ePlanReviewYes
Description
(BUSINESS INTERIORS – EXTERIOR AWNING REMODEL) Permit to install (9) exterior awnings. Approval is contingent upon adhering to the approved plans on file, DRH17-00460 and attached engineering. Work to include: removal of (9) existing canvas and metal exterior awnings and replace with (8) 5’8” x 22’4” and (1) 5’8” x 15’8.5” engineered design steel frame awnings that has metal roof covering with cedar soffits located on the existing building on the west, south and east sides of the existing building. Note: Special inspection required, see attached form 310. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/24/20189/24/20189/25/2018APASS
DetailsDave Hannah
Final approval on awnings. DAVE HANNAH: Note zoning signature not required. Zoning was called for inspection Friday and never showed due to zoning signature not required, check PDS online and signatures required to confirm. Call superintendent Devan Hardwick with any questions at 2084843721. Super not on site, please update PDS to show approval. Thanks. Phone #: ###-#### Inspection requested via web by Devan Hardwick
Zoning Approval9/21/20189/21/20189/21/2018 DONE
DetailsTed Vanegas
BLD-Final9/16/20189/17/20189/17/2018PNR
DetailsDave Hannah
Inspect knife plate to awning connections. Contact Devan Hardwick at number above upon arrival. Phone #: ###-#### Inspection requested via web by Devan Hardwick
BLD-Framing/Rough-in9/17/20189/17/20189/17/2018PPASS
DetailsDave Hannah
BLD-Other8/6/20188/6/20188/6/2018PPASS
DetailsDave Hannah
Steel // Devon Phone #: ###-####
(F) Reprint permit  7/11/2018 DONE
Telephone call  5/22/2018 DONE
Deirdra Parker emailed me that there was a GC change and valuation change-attached revised forms and emailed her the revised fees due
Issue PAID IN FULL permit  5/22/2018 DONE
Inspection Record Card- Bld  5/22/2018 DONE
Telephone call  5/4/2018 DONE
emailed Deirdra the 302 & 306 forms to get to the GC. I told her if she would have them fill the forms out and send them back, we'll get the fees due emailed to her.
Telephone call  5/4/2018 DONE
emailed Deirdra the fees due
Plan assigned to (JG)4/3/20184/3/20184/23/2018 PASS
DetailsJavier Guzman
1st rev comp, 4/16 L2 BII Awnings ePlan** pend eng
Routing Off Site - STRUCTURAL4/23/2018 4/23/2018 PASS
DetailsJavier Guzman
Signed off in ePlan By Ena of AHJ
PLANS/APPL TAKEN TO FRONT DESK  4/23/2018 DONE
Permit Ready to Issue  4/23/2018 DONE
all met-Need
GC Form-met
Revised Cert of Value-met
Route to Impact Fee Review4/19/20184/22/20184/19/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK4/3/2018 4/19/2018 PASS
DetailsJavier Guzman
1st review completed  4/19/2018 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL4/3/2018 4/18/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Ena Beganovic
Routing - Design Review4/3/2018 4/18/2018 PASS
DetailsTed Vanegas
siged off in ePlan by DR Ted Vanegas
Intake Approval  4/3/2018 PASS
DetailsJavier Guzman
Application received  3/19/2018 DONE
Application submitted via PDS Online on Mar 19 2018 3:15PM