BLD-Final | 9/24/2018 | 9/24/2018 | 9/25/2018 | A | PASS |
Dave Hannah
|
|
|
Final approval on awnings. DAVE HANNAH: Note zoning signature not required. Zoning was called for inspection Friday and never showed due to zoning signature not required, check PDS online and signatures required to confirm. Call superintendent Devan Hardwick with any questions at 2084843721. Super not on site, please update PDS to show approval. Thanks. Phone #: ###-#### Inspection requested via web by Devan Hardwick
|
Zoning Approval | 9/21/2018 | 9/21/2018 | 9/21/2018 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Final | 9/16/2018 | 9/17/2018 | 9/17/2018 | P | NR |
Dave Hannah
|
|
|
Inspect knife plate to awning connections. Contact Devan Hardwick at number above upon arrival. Phone #: ###-#### Inspection requested via web by Devan Hardwick
|
BLD-Framing/Rough-in | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Dave Hannah
|
|
|
Steel // Devon Phone #: ###-####
|
(F) Reprint permit | | | 7/11/2018 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2018 | | DONE |
|
|
|
Deirdra Parker emailed me that there was a GC change and valuation change-attached revised forms and emailed her the revised fees due
|
Issue PAID IN FULL permit | | | 5/22/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2018 | | DONE |
|
|
|
|
Telephone call | | | 5/4/2018 | | DONE |
|
|
|
emailed Deirdra the 302 & 306 forms to get to the GC. I told her if she would have them fill the forms out and send them back, we'll get the fees due emailed to her.
|
Telephone call | | | 5/4/2018 | | DONE |
|
|
|
emailed Deirdra the fees due
|
Plan assigned to (JG) | 4/3/2018 | 4/3/2018 | 4/23/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 4/16 L2 BII Awnings ePlan** pend eng
|
Routing Off Site - STRUCTURAL | 4/23/2018 | | 4/23/2018 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan By Ena of AHJ
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/23/2018 | | DONE |
|
|
|
all met-Need
GC Form-met
Revised Cert of Value-met
|
Route to Impact Fee Review | 4/19/2018 | 4/22/2018 | 4/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 4/3/2018 | | 4/19/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 4/19/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 4/3/2018 | | 4/18/2018 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Ena Beganovic
|
Routing - Design Review | 4/3/2018 | | 4/18/2018 | | PASS |
Ted Vanegas
|
|
|
siged off in ePlan by DR Ted Vanegas
|
Intake Approval | | | 4/3/2018 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 3/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 19 2018 3:15PM
|