BLD-Aging Inspection | 10/18/2019 | 10/18/2019 | 10/18/2019 | | PASS |
Jim Storey
|
|
|
Expires: 12/03/19
|
BLD-Aging Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 1/23/2019 | 1/23/2019 | 1/23/2019 | | PASS |
Jim Storey
|
|
|
open permit ncfi
|
BLD-Aging Inspection | 9/11/2018 | 9/11/2018 | 9/11/2018 | | PASS |
Jim Storey
|
|
|
ncfi Expires: 10/27/18
|
BLD-Footing | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PASS |
Jim Storey
|
|
|
rebar - Mark Phone #: ###-####
|
PubWorks Subgrade Approval | 4/27/2018 | 4/27/2018 | 4/27/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 4/11/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 4/2/2018 | 4/2/2018 | 4/11/2018 | | PASS |
Josh Bogle
|
|
|
1st done - Hillside pool - engineering not clearly site specific, e-mail out to applicant and engineers - $3.60 copy fees for 2015 engineering
|
Routing - PLAN CHECK | 4/11/2018 | | 4/11/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/11/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/11/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/11/2018 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/4/2018 | | 4/5/2018 | | PASS |
Rachael Beierle
|
|
|
|
1st review completed | | | 4/5/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/5/2018 | | 4/5/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 4/2/2018 | | 4/4/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Routing Walk-In (Zoning) | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2 - JAB
|
Routing - Erosion and Sediment | 4/2/2018 | | 4/2/2018 | | PASS |
Andy J. Long
|
|
|
Approved for ESC general permit.
|
Application received | | 4/2/2018 | | | |
|
|
|
|