BLD-Final | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Foundation | 8/22/2018 | 8/22/2018 | 8/22/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | CANC |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Inspection cancelled via mobile web on Wednesday, August 22, 2018.
|
BLD-Footing | 8/21/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Issue PAID IN FULL permit | | | 8/9/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/9/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/27/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 7/18/2018 | 7/18/2018 | 7/27/2018 | | DONE |
Rob Patrick
|
|
|
8/6 sfd L2 ePlan
|
Routing - PLAN CHECK | 7/18/2018 | | 7/27/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 7/27/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/27/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/27/2018 | | DONE |
|
|
|
***check with Tisha before you issue***
Need
GC Form (two gc names on application, rce number on app only matches one) - met
|
Routing - MECHANICAL | 7/26/2018 | | 7/26/2018 | | PASS |
Troy James
|
|
|
as per Troy James-no review required
|
Route to Impact Fee Review | 7/18/2018 | 7/21/2018 | 7/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 7/18/2018 | | 7/19/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 7/18/2018 | | 7/19/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/18/2018 | | 7/19/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 7/18/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/18/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/18/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/17/2018 | | FAIL |
|
|
|
Need
Foundation stamped & signed by eng.
Key/table on ele plan
|
Intake Approval | | | 7/2/2018 | | FAIL |
|
|
|
-Drawing File names must include the first characters of the discipline name followed by the sheet number and name. Example: A2.0 Floor Plan
-Please include a key for your electrical plan for outlets, smoke detector, co2, light switches, etc.
-Notes from AHJ on the foundation/details as per the note on A.2
-Need engineering for the attachment to the foundation as per note on A.2
-Rescheck needs to be signed and dated
-please mark on plans crawl space access
-full detail for anchor bolts
Also special inspections maybe required as per engineering.
|
Application received | | | 6/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 29 2018 2:12PM
|
Intake Approval | | | 6/29/2018 | | FAIL |
|
|
|
-Need plans/documents without Approved stamps
-rescheck
-name plans correctly
-connectors
-crawlspace/attic access
-showing locations of decks/porches
-elevations
-Cross section
-wall section
-mechanical/smoke alarms/light switches
|