Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-02715
StatusFinaled
Name RAMAJLA DURATOVIC
Site Address 200 E WOODVINE ST
Project NameDUPLEX ADDITION
Customer Number 
ePlanReviewYes
Description
(200 & 204 E. Woodvine St.) Permit to convert a single family dwelling into a duplex. Demolition of approx.. 375 sq. ft. of existing garage and repair, as needed, of existing dwelling after demo. Addition of a 2 story single family dwelling with a 413 sq. ft. two car garage, 3 bedrooms, 2 bathrooms and a living area, separated from the existing structure by a one hour rated (UL U305) wall assembly. First floor living area 942 sq. ft., upper living area 1156 sq. ft. Prescriptive Energy Compliance. R-1C zoning and set-backs per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/29/20191/30/20191/30/2019PPASS
DetailsJim Storey
Call 30 minutes ahead, the house is locked // Vedad Phone #: ###-####
DOC - Permit Finaled1/30/20191/30/20191/30/2019PPASS
DetailsJim Storey
BLD-Energy code compliance1/7/20191/8/20191/8/2019PDONE
DetailsJim Storey
VEDAD Phone #: ###-####
BLD-Energy code compliance11/9/201811/13/201811/13/2018APASS
DetailsJim Sly
Vedad Phone #: ###-####
BLD-Framing/Rough-in11/7/201811/7/201811/7/2018PPASS
DetailsJim Storey
call half hour before to meet // vedad Phone #: ###-#### ele insp. allowed pannel in fire wall boxed out with gyp.
BLD-Framing/Rough-in11/5/201811/5/201811/5/2018PFAIL
DetailsJim Storey
Vedad Phone #: ###-#### gyp thur floor around ele aproved pannel and at overbuild front wall.
BLD-Framing/Rough-in10/4/201810/5/201810/5/2018APART
DetailsJim Storey
Vedad Phone #: ###-#### sheer ok/ fire wall ok
BLD-Conference9/25/20189/25/20189/25/2018PPASS
DetailsJim Storey
Call to meet // Mia Phone #: ###-#### uplex not townhoused
BLD-Framing/Rough-in9/25/20189/25/20189/25/2018PCANC
DetailsJim Storey
call to meet // mia Phone #: ###-####
BLD-Foundation9/18/20189/19/20189/19/2018APASS
DetailsJim Storey
Wall // Mark Phone #: ###-####
BLD-Footing9/17/20189/17/20189/17/2018PPASS
DetailsJim Storey
Mark Phone #: ###-####
BLD-Footing9/14/20189/14/20189/14/2018PFAIL
DetailsJim Storey
Mark Phone #: ###-#### not per engineering at common wall
BLD-Footing9/13/20189/13/20189/13/2018PFAIL
DetailsMike Jordan
Mark Phone #: ###-####. Footing along existing structure not per the engineering provided. Also check rear setbck....
Issue PAID IN FULL permit  8/10/2018 DONE
Inspection Record Card- Bld  8/10/2018 DONE
Plan assigned to (RDP)8/1/20188/1/20188/9/2018 DONE
DetailsRob Patrick
08/14 addition L1 ePlan...Duplex add-on: Failed for multiple corrections.
Routing - PLAN CHECK8/9/2018 8/9/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  8/9/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  8/9/2018 DONE
Routing - PLAN CHECK8/1/2018 8/7/2018 FAIL
DetailsRob Patrick
Multiple corrections required
1st review completed  8/7/2018 FAIL
DetailsRob Patrick
Multiple corrections required
Routing - MECHANICAL8/1/2018 8/6/2018 PASS
DetailsChad Schwendiman
Routing - PLANNING8/1/2018 8/6/2018 PASS
DetailsSusan Riggs
Routing - Addressing8/1/2018 8/2/2018 PASS
DetailsDoug Chausow
200 E Woodvine St Original Address
204 E Woodvine ST Addition to duplex
Routing - PUBLIC WORKS8/1/2018 8/2/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  8/1/2018 DONE
Intake Approval  8/1/2018 PASS
Recd Pcfee & Taken To Pln CK  8/1/2018 DONE
Application received  7/31/2018 DONE
Application submitted via PDS Online on Jul 31 2018 8:41AM