BLD-Final | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
DOC - Permit Finaled | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 5/18/2020 | 5/18/2020 | 5/18/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading, drainage, and stabilization is acceptable and landscaping photos have been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 5/14/2020 | 5/15/2020 | 5/15/2020 | A | FAIL |
Brandon Shaw
|
|
|
Need PW approval... R311.7.5.1 open riser are permitted... provided the passage of a 4" sphere is not permitted... R314.3 Smoke alarms... immediate vicinity of the bedroom, and each story...
|
BLD-Blower Door Test Results | 5/15/2020 | 5/15/2020 | 5/15/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 6.58
|
BLD-Grading Inspection | 5/14/2020 | 5/14/2020 | 5/14/2020 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Aging Inspection | 1/10/2020 | 1/10/2020 | 1/10/2020 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 8/27/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Framing/Rough-in | 8/26/2019 | 8/27/2019 | 8/27/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO Inspection cancelled from web by: SHANE JAYO
|
BLD-Energy code compliance | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | FAIL |
Brandon Shaw
|
|
|
Previous corrections not complete- 4x8 header, ais seal, and fire caulking... Per shear pg 7 of 13- Balloon wall to be 2x6 12" o.c.... Need sprinkler trenting approval...
|
BLD-Framing/Rough-in | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, ok to insulate,, needs fire blocking, finish fur downs, justify attic venting,, add header at stair landing area,, see painted notes,, will need one more sprinkler inspection
|
BLD-Wall Bracing | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Wall Bracing | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | DEFR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Framing/Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | FAIL |
Brandon Shaw
|
|
|
No air/foam seal... No Sprinkler ruogh-in...
|
BLD-Other | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
Dave Hannah
|
|
|
Need Sheetrock on soffits inspected Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Framing/Rough-in | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO Inspection cancelled from web by: SHANE JAYO
|
BLD-Foundation | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, work in progress
|
BLD-Footing | 3/26/2019 | 3/27/2019 | 3/28/2019 | P | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Footing | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, work in progress
|
PubWorks Subgrade Approval | 3/28/2019 | 3/28/2019 | 3/28/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 3/18/2019 | | DONE |
|
|
|
|
Extend Review Timeline | | | 2/22/2019 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Meeting | | | 2/19/2019 | | DONE |
|
|
|
shane sent in letter for extention
|
Meeting | | | 2/14/2019 | | DONE |
|
|
|
sent email to shane to recommend an extension request be sent in. home@home.com did not work
|
Meeting | | | 2/12/2019 | | DONE |
|
|
|
sent email to home@home.com to recommend sending an extension request
|
OVERRIDE | | | 1/25/2019 | | |
|
|
|
|
OVERRIDE | | | 1/25/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/25/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 1/25/2019 | | DONE |
|
|
|
taken to front desk was not put in activities
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2019 | | DONE |
|
|
|
sent to front desk without putting in activity so changed status back to REV then added this activity
|
Permit Ready to Issue | | | 1/25/2019 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2019 | | DONE |
|
|
|
called Shane to let know permit is ready and how much is owed-left message on office phone ###-####
|
Permit Ready to Issue | | | 1/25/2019 | | DONE |
|
|
|
Need
RP (listed rp is expired)
|
Plan assigned to (M_H) | 1/17/2019 | | 1/25/2019 | | DONE |
Michael Hanson
|
|
|
pending pw-hillside review
|
Routing - PUBLIC WORKS | 1/22/2019 | | 1/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 1/17/2019 | | 1/22/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PUBLIC WORKS | 1/17/2019 | | 1/17/2019 | | PASS |
Morgan Webb
|
|
|
|
Case Summary (BLD) | | | 1/17/2019 | | DONE |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 8/7/2018 | | 1/17/2019 | | DONE |
Michael Hanson
|
|
|
08/21 #404 L2 Paper. 1st review completed - pending fire review. MDH
|
Routing - FIRE | 1/7/2019 | 1/7/2019 | 1/16/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case. Residence to be fire sprinklered, with tempered glass and non combustible vegetation facing undeveloped space.
|
Routing - FIRE | 9/18/2018 | 9/18/2018 | 9/18/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case; Fire flow okay; no defensible space provided.
|
Plan resubmittals received | | | 9/10/2018 | | DONE |
|
|
|
Resubmittals-received 3 sets of sheets L1.0 and 3 letters from Suez-took to Michael H
|
Routing - FIRE | 8/20/2018 | 8/20/2018 | 8/21/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed applicant
|
Routing - PLAN CHECK | | | 8/20/2018 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 8/20/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 8/15/2018 | | 8/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 8/17/2018 | | 8/17/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP & PD. Site preparation inspeciton is REQUIRED.
|
Routing - PUBLIC WORKS | 8/2/2018 | | 8/15/2018 | | FAIL |
Rachael Beierle
|
|
|
see hillside
|
Routing PW Grading-Hillside | 8/3/2018 | | 8/15/2018 | | FAIL |
Melissa Jannusch
|
|
|
Updated plans will be submitted to reflect drainage changes
|
Routing PW Sewer Rating | 8/15/2018 | | 8/15/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan resubmittals received | | | 8/15/2018 | | DONE |
|
|
|
received 3 sets of sheets C1.0, C2.0 & ESC1.0; plans stamped and taken to M_H for review/routing
|
Plan resubmittals received | | | 8/15/2018 | | DONE |
|
|
|
received signed conditions of approval for PW, and three full size plan sheets C2.0; put with plans currnently in mechanial review.
|
Routing - PLANNING | 8/15/2018 | | 8/15/2018 | | PASS |
Sue Cummings
|
|
|
|
Plan assigned to (BJM) | | | 8/7/2018 | | DEFR |
Brian McGowan
|
|
|
08/21 sfd L2 Paper
|
Route to Impact Fee Review | 8/2/2018 | 8/5/2018 | 8/3/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 8/2/2018 | | 8/3/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/2/2018 | | PASS |
|
|
|
|
Application received | | 8/2/2018 | | | |
|
|
|
|