Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-02779
StatusFinaled
Name JAYO CONSTRUCTION INC
Site Address 411 W SAND DUNE LN
Project NameL26B1
Customer Number 
ePlanReviewNo
Description
***Fire sprinklers are required***Precriptive component energy approach***WUI Zone A requirements*** Permit for the construction of a new 2,501 sq. ft., two story (first story 2,231 sq. ft., below grade 270 sq. ft.) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 300 sq. ft. of covered patio/porch and a 865 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. MDHA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/18/20205/18/20205/18/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by SHANE JAYO
DOC - Permit Finaled5/18/20205/18/20205/18/2020PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval5/18/20205/18/20205/18/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading, drainage, and stabilization is acceptable and landscaping photos have been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final5/14/20205/15/20205/15/2020AFAIL
DetailsBrandon Shaw
Need PW approval...
R311.7.5.1 open riser are permitted... provided the passage of a 4" sphere is not permitted...
R314.3 Smoke alarms... immediate vicinity of the bedroom, and each story...
BLD-Blower Door Test Results5/15/20205/15/20205/15/2020ADONE
DetailsBrandon Shaw
ACH50- 6.58
BLD-Grading Inspection5/14/20205/14/20205/14/2020PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Aging Inspection1/10/20201/10/20201/10/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days1/10/20201/10/20201/10/2020PDONE
DetailsBrandon Shaw
BLD-Framing/Rough-in8/27/20198/29/20198/29/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Framing/Rough-in8/26/20198/27/20198/27/2019PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO Inspection cancelled from web by: SHANE JAYO
BLD-Energy code compliance8/20/20198/21/20198/21/2019AFAIL
DetailsBrandon Shaw
Previous corrections not complete-
4x8 header, ais seal, and fire caulking...
Per shear pg 7 of 13- Balloon wall to be 2x6 12" o.c....
Need sprinkler trenting approval...
BLD-Framing/Rough-in7/31/20198/1/20198/1/2019APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, ok to insulate,, needs fire blocking, finish fur downs, justify attic venting,, add header at stair landing area,, see painted notes,, will need one more sprinkler inspection
BLD-Wall Bracing7/26/20197/26/20197/26/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Wall Bracing7/25/20197/26/20197/26/2019ADEFR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Framing/Rough-in7/25/20197/25/20197/25/2019PFAIL
DetailsBrandon Shaw
No air/foam seal...
No Sprinkler ruogh-in...
BLD-Other7/23/20197/24/20197/24/2019APASS
DetailsDave Hannah
Need Sheetrock on soffits inspected Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Framing/Rough-in7/23/20197/24/20197/24/2019ACANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by SHANE JAYO Inspection cancelled from web by: SHANE JAYO
BLD-Foundation4/2/20194/2/20194/2/2019PPART
DetailsTony Young
Bill Phone #: ###-####,, work in progress
BLD-Footing3/26/20193/27/20193/28/2019PDONE
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Footing3/27/20193/28/20193/28/2019APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, work in progress
PubWorks Subgrade Approval3/28/20193/28/20193/28/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  3/18/2019 DONE
Extend Review Timeline  2/22/2019 DONE
1st Approved 180 day extension per Adele. See documents
Meeting  2/19/2019 DONE
shane sent in letter for extention
Meeting  2/14/2019 DONE
sent email to shane to recommend an extension request be sent in. home@home.com did not work
Meeting  2/12/2019 DONE
sent email to home@home.com to recommend sending an extension request
OVERRIDE  1/25/2019  
OVERRIDE  1/25/2019  
Inspection Record Card- Bld  1/25/2019 DONE
CHANGE STATUS TO (REV)  1/25/2019 DONE
taken to front desk was not put in activities
PLANS/APPL TAKEN TO FRONT DESK  1/25/2019 DONE
sent to front desk without putting in activity so changed status back to REV then added this activity
Permit Ready to Issue  1/25/2019 DONE
Telephone call  1/25/2019 DONE
called Shane to let know permit is ready and how much is owed-left message on office phone ###-####
Permit Ready to Issue  1/25/2019 DONE
Need
RP (listed rp is expired)
Plan assigned to (M_H)1/17/2019 1/25/2019 DONE
DetailsMichael Hanson
pending pw-hillside review
Routing - PUBLIC WORKS1/22/2019 1/23/2019 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside1/17/2019 1/22/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - PUBLIC WORKS1/17/2019 1/17/2019 PASS
DetailsMorgan Webb
Case Summary (BLD)  1/17/2019 DONE
DetailsMichael Hanson
Plan assigned to (M_H)8/7/2018 1/17/2019 DONE
DetailsMichael Hanson
08/21 #404 L2 Paper. 1st review completed - pending fire review. MDH
Routing - FIRE1/7/20191/7/20191/16/2019 PASS
DetailsErika Akin
Attached comments to case. Residence to be fire sprinklered, with tempered glass and non combustible vegetation facing undeveloped space.
Routing - FIRE9/18/20189/18/20189/18/2018 FAIL
DetailsErika Akin
Attached comments to case; Fire flow okay; no defensible space provided.
Plan resubmittals received  9/10/2018 DONE
Resubmittals-received 3 sets of sheets L1.0 and 3 letters from Suez-took to Michael H
Routing - FIRE8/20/20188/20/20188/21/2018 FAIL
DetailsErika Akin
Attached comments to case and emailed applicant
Routing - PLAN CHECK  8/20/2018 PASS
DetailsMichael Hanson
1st review completed  8/20/2018 DONE
DetailsMichael Hanson
Routing - MECHANICAL8/15/2018 8/17/2018 PASS
DetailsTroy James
Routing - Erosion and Sediment8/17/2018 8/17/2018 PASS
DetailsAndy J. Long
ESC plan approved. Certified RP & PD. Site preparation inspeciton is REQUIRED.
Routing - PUBLIC WORKS8/2/2018 8/15/2018 FAIL
DetailsRachael Beierle
see hillside
Routing PW Grading-Hillside8/3/2018 8/15/2018 FAIL
DetailsMelissa Jannusch
Updated plans will be submitted to reflect drainage changes
Routing PW Sewer Rating8/15/2018 8/15/2018 PASS
DetailsMorgan Webb
Plan resubmittals received  8/15/2018 DONE
received 3 sets of sheets C1.0, C2.0 & ESC1.0; plans stamped and taken to M_H for review/routing
Plan resubmittals received  8/15/2018 DONE
received signed conditions of approval for PW, and three full size plan sheets C2.0; put with plans currnently in mechanial review.
Routing - PLANNING8/15/2018 8/15/2018 PASS
DetailsSue Cummings
Plan assigned to (BJM)  8/7/2018 DEFR
DetailsBrian McGowan
08/21 sfd L2 Paper
Route to Impact Fee Review8/2/20188/5/20188/3/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing8/2/2018 8/3/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  8/2/2018 DONE
Recd Pcfee & Taken To Pln CK  8/2/2018 DONE
Intake Approval  8/2/2018 PASS
Application received 8/2/2018