Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-02927
StatusFinaled
Name WOOD RIVER BUILDERS
Site Address 137 E DEMMING LN
Project Name137 E Demming
Customer Number 
ePlanReviewYes
Description
9/12/18...**Added redlines on Cover sheet and Roof Framing sheet that address eave set-backs, and added those 2 sheets to approved plans.***RDP*** Permit for the construction of a new 1763 sq. ft., two story (first story 962 sq. ft., second story 801 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 25 sq. ft. of covered patio/porch and a 425 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/27/20193/28/20193/28/2019APASS
DetailsBrandon Shaw
Todd Phone #: ###-####
DOC - Permit Finaled3/28/20193/28/20193/28/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results3/28/20193/28/20193/28/2019ADONE
DetailsBrandon Shaw
ACH50- 3.88
BLD-Aging Inspection3/5/20193/5/20193/5/2019 PASS
DetailsJim Storey
Plan Modification Accepted  1/3/2019 DONE
New manual j report
Routing - MECHANICAL1/3/2019 1/3/2019 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Other11/20/201811/21/201811/21/2018APASS
DetailsJim Storey
sofit // todd Phone #: ###-####
BLD-Wall Bracing11/16/201811/20/201811/20/2018ACANC
DetailsMike Jordan
interior shear // Todd Phone #: ###-####
BLD-Other11/16/201811/20/201811/20/2018ACANC
DetailsMike Jordan
WUI soffit // Todd Phone #: ###-####
BLD-Conference11/6/201811/6/201811/6/2018PCANC
DetailsJim Sly
301
BLD-Energy code compliance10/18/201810/23/201810/22/2018APASS
DetailsJim Sly
Todd Phone #: ###-####
BLD-Framing/Rough-in10/18/201810/19/201810/22/2018PPASS
DetailsJim Sly
Todd Phone #: ###-####
BLD-Wall Bracing10/3/201810/3/201810/3/2018PPASS
DetailsJim Storey
Todd Phone #: ###-####
BLD-Footing9/14/20189/14/20189/14/2018PPASS
DetailsJim Storey
Derik Phone #: ###-####
BLD-Footing9/11/20189/11/20189/11/2018PPASS
DetailsJim Storey
Derek Phone #: ###-#### per the reviewed aproved plan
Issue PAID IN FULL permit  9/6/2018 DONE
Inspection Record Card- Bld  9/6/2018 DONE
OVERRIDE  8/30/2018  
Plan assigned to (RDP)8/21/20188/21/20188/30/2018 DONE
DetailsRob Patrick
8/27 sfd L1 ePlan...8/21 Failed: Foundation needs to be per code
Routing - PLAN CHECK8/30/2018 8/30/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  8/30/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  8/30/2018 DONE
met


(Sewer permit name will be update soon- Rachael)
Plan assigned to (BJM)8/14/20188/14/20188/21/2018 DEFR
DetailsBrian McGowan
08/27 sfd L1 ePlan
Routing - PLAN CHECK8/21/2018 8/21/2018 FAIL
DetailsRob Patrick
Foundation needs to be per code
1st review completed  8/21/2018 FAIL
DetailsRob Patrick
Routing - MECHANICAL8/14/2018 8/16/2018 PASS
DetailsTroy James
Route to Impact Fee Review8/14/20188/17/20188/15/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING8/14/2018 8/15/2018 PASS
DetailsSusan Riggs
Modify the garage door to have windows and provide a better street appeal.
Routing - Addressing8/14/2018 8/14/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/14/2018 8/14/2018 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  8/14/2018 DONE
Intake Approval  8/14/2018 PASS
Recd Pcfee & Taken To Pln CK  8/14/2018 DONE
Application received  8/13/2018 DONE
Application submitted via PDS Online on Aug 13 2018 3:18PM