BLD-Aging Inspection | 7/10/2020 | 7/10/2020 | 7/10/2020 | | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 2/26/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Jim Storey
|
|
|
give me a call Phone #: ###-#### Inspection requested via web by richard harris
|
BLD-Conference | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Jim Storey
|
|
|
give me a call i need to go to work 12ish Thanks Phone #: ###-#### Inspection requested via web by richard harris
|
BLD-Framing/Rough-in | 2/19/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Jim Storey
|
|
|
give me a call i need to go to work 12ish Thanks Phone #: ###-#### Inspection requested via web by richard harris
|
BLD-Aging Inspection | 11/7/2019 | 11/7/2019 | 11/7/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 6/26/2019 | 6/26/2019 | 6/26/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by richard harris garage ok to cover truss engineering ok for gable at overhead door.
|
BLD-Conference | 4/22/2019 | 4/23/2019 | 4/23/2019 | P | CANC |
Jim Storey
|
|
|
please call, so i can meet you there. Thanks Rich ###-#### Phone #: ###-#### Inspection requested via web by richard harris need gable truss free span papper work.
|
BLD-Foundation | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Jim Storey
|
|
|
rebar // Josh Phone #: ###-####
|
BLD-Footing | 2/5/2019 | 2/7/2019 | 2/7/2019 | A | CANC |
Jim Sly
|
|
|
Josh Phone #: ###-#### Josh Cancelled.
|
BLD-Footing | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | CANC |
Jim Storey
|
|
|
Josh Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/4/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/4/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/1/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 9/10/2018 | 9/10/2018 | 10/1/2018 | | PASS |
Josh Bogle
|
|
|
09/14 remodel, paper - 1st done
|
Routing - PLAN CHECK | 10/1/2018 | | 10/1/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/1/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/1/2018 | | DONE |
|
|
|
NEED
GC FORM FROM PARCEL OWNER
|
Routing Walk-In (BLD) | 9/27/2018 | 9/27/2018 | 9/27/2018 | A | FAIL |
Josh Bogle
|
|
|
additional plan for resub
|
Routing - PLAN CHECK | 9/27/2018 | | 9/27/2018 | | FAIL |
Josh Bogle
|
|
|
engineering issues, see e-mail 9/27/18
|
Routing - PLAN CHECK | 9/12/2018 | | 9/17/2018 | | FAIL |
Josh Bogle
|
|
|
see e-mail 9/17
|
1st review completed | | | 9/17/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 9/17/2018 | | 9/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 9/10/2018 | | 9/12/2018 | | FAIL |
Troy James
|
|
|
emailed corrections to heating supply
|
Routing Walk-In (Zoning) | 9/10/2018 | 9/10/2018 | 9/10/2018 | A | PASS |
Colleen T Carroll
|
|
|
Shop to be 20' from front setback and circular drive not to exceed 33'
|
Routing Walk-In (BLD) | 9/10/2018 | 9/10/2018 | 9/10/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level 2 and routed to Mech
|
Application received | | 9/10/2018 | | | |
|
|
|
|