BLD-Final | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Tell Riley
|
|
|
Please call if any issue arise as I will not be home. ###-#### Phone #: ###-#### Inspection requested via web by Jimmy Acuna//corrections made//
|
DOC - Permit Finaled | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | PART |
Tell Riley
|
|
|
please call before coming, ###-#### Phone #: ###-#### Inspection requested via web by Jimmy Acuna//need to caulk exterior siding joints//interior complete per plans//
|
BLD-Energy code compliance | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Tell Riley
|
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by Jimmy Acuna//ok to cover//
|
BLD-Framing/Rough-in | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Jim Sly
|
|
|
Please call before coming to ensure someone is home. Phone #: ###-#### Inspection requested via web by Jimmy Acuna
|
BLD-Framing/Rough-in | 1/3/2019 | 1/3/2019 | 1/4/2019 | P | NR |
Jim Sly
|
|
|
As late as possible Phone #: 2089495745 >> Inspection requested via mobile web by Jimmy Acuna Need all trade Rough ins
|
BLD-Foundation | 12/17/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Jimmy Acuna
|
BLD-Conference | 12/17/2018 | 12/18/2018 | 12/17/2018 | P | CANC |
Jim Sly
|
|
|
As late as possible Phone #: 2089495745 >> Inspection requested via mobile web by Jimmy Acuna Inspection cancelled from web by: Jimmy Acuna
|
BLD-Footing | 12/3/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Jim Sly
|
|
|
Call prior to going Phone #: 2089495745 >> Inspection requested via mobile web by Jimmy Acuna
|
Routing Walk-In (BLD) | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 10/9/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/9/2018 | | 10/9/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/9/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2018 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 10/9/2018 | | DONE |
|
|
|
Attempted to call Parcel Owner, mailbox full so no message could be left
|
Permit Ready to Issue | | | 10/9/2018 | | DONE |
|
|
|
All requirements met
|
Issue PAID IN FULL permit | | | 10/9/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/25/2018 | 9/25/2018 | 9/25/2018 | A | FAIL |
Josh Bogle
|
|
|
applicant to draw 2 section views, 3 elevations, & a floor plan with fixtures, doors, windows, insluation etc. shown
|
Routing Walk-In (Zoning) | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | FAIL |
Michael Hanson
|
|
|
Needs additional information.
|
Routing - PLAN CHECK | 9/21/2018 | | 9/21/2018 | | FAIL |
Michael Hanson
|
|
|
Provided with methods to meet structural, energy, and life safety requirements for a garage and patio conversion to living space. MDH
|
1st review completed | | | 9/21/2018 | | FAIL |
Michael Hanson
|
|
|
|
Application received | | 9/21/2018 | | | |
|
|
|
|