Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-03545
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 1415 S BROADWAY AVE
Project NameEinstein's Oilery
Customer NumberBLD18-03246 DEMO
ePlanReviewYes
Description
(EINSTEIN’S OILERY) Permit to construct a new single story 2,618 sq. ft. building (with a 359 sq. ft. mezzanine and a 1,299 sq. ft. basement) for auto repair use and related site improvements. Approval is contingent upon adhering to the approved plans on file, attached engineering and plan review report. Scope of work includes: construction of footing foundation, concrete basement walls, concrete slab floor, engineered floor joist at mezzanine, construction of 2x exterior envelope walls, pre-engineered roof trusses, metal roof assembly, stairway, construction of interior nonbearing walls in the basement to create a storage room, a mechanical room and a restroom, construction of interior nonbearing on the main floor to create a storage room a service area and an accessible restroom, construction of interior nonbearing at the mezzanine to create an office, millwork, gypsum ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes to be in compliance with Ch. 8 of the current IBC. Note: Special inspection required see attached 310 form. This building is Not Fire Sprinklered. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/27/2019 DONE
1ST NOTICE
Print Statement  11/6/2019 DONE
Second Notice 8/15/20199/20/2019 DONE
mailed 9-23-19
First Notice 8/11/20198/5/2019 DONE
mailed 8-6-19
PubWorks Occupancy Approval8/2/20198/2/20198/2/2019 DONE
DetailsTiffany Lowery
Zoning Approval8/1/20198/1/20198/1/2019 PASS
DetailsJosh Wilson
Permanent Occupancy  8/1/2019 DONE
FIRE-Final Inspection7/30/20197/31/20197/31/2019PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, locked/unlocked indicator to be placed on main entry lock before BLD permit final. Final life fire safety inspection complete.

Josh Phone #: ###-####
BLD-Final7/30/20197/31/20197/31/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Josh Strasser final ok pending all otherr sign offs
Print Occupancy Form  7/29/2019 DONE
BLD-Other6/17/20196/17/20196/17/2019PPASS
DetailsDave Hannah
Drywall Shear screw pattern prior to drywall finish,Necessary? Phone #: ###-#### Inspection requested via web by mark nearman
BLD-Energy code compliance6/12/20196/13/20196/13/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by mark nearman
BLD-Framing/Rough-in6/11/20196/11/20196/11/2019PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by mark nearman fire blk chase/ brace web
BLD-Framing/Rough-in6/7/20196/10/20196/10/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by mark nearman
BLD-Framing/Rough-in6/7/20196/10/20196/10/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by mark nearman
BLD-Framing/Rough-in6/7/20196/10/20196/10/2019PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by mark nearman
BLD-Other5/29/20195/30/20195/30/2019PPASS
DetailsJim Storey
sheer panel nailing Phone #: ###-#### Inspection requested via web by mark nearman
BLD-Other5/29/20195/30/20195/30/2019PPASS
DetailsJim Storey
sheer panel nailing Phone #: ###-#### Inspection requested via web by mark nearman
BLD-Wall cover5/29/20195/29/20195/29/2019APASS
DetailsMike Jordan
Roof only ok to dry sheet.
BLD-Other5/24/20195/28/20195/28/2019PNR
DetailsMike Jordan
Mark- cover ceailing Phone #: ###-####
BLD-Concrete4/29/20194/30/20194/30/2019PPART
DetailsJim Sly
rebar placement Phone #: ###-#### Inspection requested via web by mark nearman
Main floor slab.......OK pending Allwest speciial inspection, tests and approvals.
BLD-Concrete4/29/20194/30/20194/30/2019PPART
DetailsJim Sly
rebar placement Phone #: ###-#### Inspection requested via web by mark nearman
Main floor slab. OK pending Allwest special inspection, tests and approvals.
BLD-Foundation4/11/20194/12/20194/12/2019APASS
DetailsJim Storey
To inspect water proofing on foundation exterior walls Phone #: ###-#### Inspection requested via web by mark nearman
BLD-Foundation4/8/20194/9/20194/9/2019PCANC
DetailsJim Storey
for a visual of foundation water proofing Phone #: ###-#### >> Inspection requested via web by mark nearman Inspection cancelled from web by: mark nearman
BLD-Foundation4/8/20194/9/20194/8/2019ACANC
DetailsJim Storey

For Waterproofing on exterior stem walls Phone #: ###-#### >> Inspection requested via web by mark nearman Inspection cancelled from web by: mark nearman
BLD-Footing3/27/20193/27/20193/27/2019PPART
DetailsJim Storey
Mark Phone #: ###-#### rebar ok/ water stop ok/ si pending
Issue PAID IN FULL permit  2/19/2019 DONE
Print Occupancy Form  2/19/2019 DONE
Telephone call  12/12/2018 DONE
Jeff Likes sent an email for the ACHD but it wasn't the actual letter or email from ACHD so emailed Jeff back telling him we need the actual letter from ACHD
OVERRIDE  12/10/2018  
Plan assigned to (JHB)9/27/20189/27/201812/10/2018 PASS
DetailsJoe Bruce
*(2nd Rev Comp) 11/07 (502) - Einstein's Oilery (DR)
Routing - Design Review12/7/2018 12/10/2018 PASS
DetailsAndrea Tuning
PLANS/APPL TAKEN TO FRONT DESK  12/10/2018 DONE
Permit Ready to Issue  12/10/2018 DONE
met jstrasser@wbtbc.com
NEED
RP
Rev cert of val
GC
ACHD
Plan resubmittals received  12/6/2018 DONE
DetailsJoe Bruce
Received resubmittal in ePlan **JHB**
Plan resubmittals requested  11/29/2018 DONE
DetailsJoe Bruce
Routing Off Site - STRUCTURAL11/21/2018 11/28/2018 PASS
DetailsJoe Bruce
KPFF - Cory Harelson
Routing PW Sewer Design11/21/2018 11/23/2018 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK11/21/2018 11/23/2018 PASS
DetailsJoe Bruce
Routing - Design Review11/21/2018 11/21/2018 FAIL
DetailsAndrea Tuning
Install a mixture of deciduous and evergreen trees, shrubs, or other vegetative groundcover that will create a visual barrier that provides a minimum of 60 percent of a barrier within five years of planting in order to adequately screen the residential properties to the west.
Plan resubmittals received  11/21/2018 DONE
DetailsJoe Bruce
Received resubmittal in ePlan **JHB**
Routing - FIRE9/27/20189/27/201811/14/2018 PASS
DetailsErika Akin
Attached comments to case
Route to Impact Fee Review11/8/201811/11/201811/9/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK9/27/2018 11/8/2018 FAIL
DetailsJoe Bruce
1st review completed  11/8/2018 FAIL
DetailsJoe Bruce
Plan resubmittals requested  11/8/2018 DONE
DetailsJoe Bruce
Emailed Plan Review report to architect. **JHB**
Routing PW Sewer Rating9/28/2018 11/7/2018 PASS
DetailsMorgan Webb
NO NEW FEES. CREDIT FOR DEMO
Routing PW Environmental9/28/2018 10/11/2018 PASS
DetailsTerry Alber
Oil/sediment trap approved as shown.
Routing Off Site - STRUCTURAL9/27/2018 10/9/2018 FAIL
DetailsJoe Bruce
KPFF - Cory Harelson
Routing PW Drainage9/28/2018 10/8/2018 PASS
DetailsBrian Murphy
Routing - MECHANICAL9/27/2018 10/5/2018 PASS
DetailsTroy James
Routing PW Solid Waste9/28/2018 10/3/2018 PASS
DetailsEvan Carpenter
Routing - Design Review9/27/2018 10/2/2018 FAIL
DetailsAndrea Tuning
DRH17-00536
Install a mixture of deciduous and evergreen trees, shrubs, or other vegetative groundcover that will create a visual barrier that provides a minimum of 60 percent of a barrier within five years of planting in order to adequately screen the residential properties to the west.
Routing PW Sewer Design9/28/2018 10/1/2018 FAIL
DetailsDeAnn Brown
Add sewer plug permit information on demolition sheet for both sewer services. For sewer service that will not be reused for new building, note the service to be plugged at the mainline rather than the property line.
Routing - Addressing9/27/2018 9/28/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/27/2018 9/28/2018 PASS
DetailsMorgan Webb
Routing PW Street Lights9/28/2018 9/28/2018 PASS
DetailsTom Marshall
Routing - Erosion and Sediment9/27/2018 9/27/2018 PASS
DetailsMichael Zawacki
RP needed before ground disturbing activities. Site prep inspection required.
Routing - PLUMBING9/27/2018 9/27/2018 PASS
DetailsDaryl Spivey
See red line notes and install per plan and ISPC.
Routing - PLANNING9/27/2018 9/27/2018 PASS
DetailsDavid Moser
Plans ACCEPTED BY PLAN TECH  9/27/2018 DONE
Recd Pcfee & Taken To Pln CK  9/27/2018 DONE
Intake Approval  9/27/2018 PASS
Application received  9/26/2018 DONE
Application submitted via PDS Online on Sep 26 2018 8:14AM