Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD18-03613
StatusIssued
Name BOISE CITY GOVERNMENT BUILDINGS
Site Address 150 N CAPITOL BLVD
Project NameBoise City Hall - PDS 2nd Flr
Customer Number 
ePlanReviewYes
Description
(BOISE CITY HALL – PDS DEPT - 2nd FLOOR) Permit to remove an existing office on the second floor within the existing building and create a new 120 sq. ft. office. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select interior glazing, removal of select door/door frame, construction of interior non-bearing walls to create an office, select new door/door frame, select new interior glazing, relocate existing light fixtures, electrical work, and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in12/17/201812/17/201812/17/2018PPASS
DetailsDave Hannah
wall kicker -between 12 and 2:30 Keith Phone #: ###-####
FIRE-Final Inspection12/17/201812/17/201812/17/2018PPASS
DetailsAdele J Schaffeld-Griffin
wall kicker -between 12 and 2:30 Keith Phone #: ###-####
BLD-Framing/Rough-in11/16/201811/16/201811/16/2018PPASS
DetailsBob Archibald
Call 30 mins before // keith Phone #: ###-####. Exterior cover only. electrical rough in approval required prior to interior office cover.
Fees Due Hold10/23/2018 10/24/2018 DONE
DetailsChristina Prado
Issue & PRINT to be Invoiced  10/22/2018 DONE
Inspection Record Card- Bld  10/22/2018  
Plan assigned to (JG)10/16/201810/16/201810/19/2018 PASS
DetailsJavier Guzman
10/19 L1 2nd Floor PDS Remodel ePlan
Routing - PLAN CHECK10/16/2018 10/19/2018 PASS
DetailsJavier Guzman
1st review completed  10/19/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/19/2018 DONE
Permit Ready to Issue  10/19/2018 DONE
NEED
GC FORM
REVISED VALUE
Intake Approval  10/15/2018 PASS
DetailsJavier Guzman
Intake Approval  10/10/2018 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Provide a completed 518 checklist
• Provide a wall sections to show interior top of wall bracing method
Application received  10/1/2018 DONE
Application submitted via PDS Online on Oct 1 2018 2:03PM