Third Notice | | 7/13/2020 | 8/10/2020 | | DONE |
|
|
|
mailed 8-14-2020
|
Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Second Notice | | 4/13/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | | 3/21/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Zoning Approval | 3/11/2020 | 3/11/2020 | 3/11/2020 | | DONE |
David Moser
|
|
|
|
Permanent Occupancy | | | 3/11/2020 | | DONE |
|
|
|
|
BLD-Final | 3/9/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
FIRE-Final Inspection | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Mark Phone #: ###-####
|
BLD-Final | 3/5/2020 | 3/6/2020 | 3/9/2020 | P | CANC |
Jim Storey
|
|
|
mark Phone #: ###-####
|
FIRE-Final Inspection | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | CANC |
Troy Cobbley
|
|
|
mark Phone #: ###-####
|
OVERRIDE | | | 3/6/2020 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/6/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/6/2020 | | DONE |
|
|
|
plan mod approved
|
Plan assigned to (CJW) | 2/6/2020 | 2/6/2020 | 3/5/2020 | | PASS |
Carl Westfall
|
|
|
plan mod - (turbo air hangar) (route to staff)
|
Plan Reviewer's activity | | | 3/5/2020 | | PASS |
|
|
|
The Plan Mod was approved
|
Routing - FIRE | 3/4/2020 | 3/4/2020 | 3/4/2020 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Routing - PLAN CHECK | 3/2/2020 | | 3/4/2020 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 3/2/2020 | | DONE |
|
|
|
|
Routing - FIRE | 2/11/2020 | 2/13/2029 | 2/24/2020 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Plan resubmittals requested | | | 2/24/2020 | | DONE |
|
|
|
|
Routing PW Street Lights | 2/11/2020 | | 2/12/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 2/11/2020 | | 2/12/2020 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Environmental | 2/11/2020 | | 2/12/2020 | | PASS |
Rick Christenson
|
|
|
No AFFF system allowed without prior approval.
|
Routing PW Solid Waste | 2/11/2020 | | 2/11/2020 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PUBLIC WORKS | 2/11/2020 | | 2/11/2020 | | PASS |
Candy A. Nichols
|
|
|
plan mod
|
Routing PW Drainage | 2/11/2020 | | 2/11/2020 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 2/10/2020 | | 2/11/2020 | | PASS |
Carl Westfall
|
|
|
Defering the construction of the parking lot is OK with me. Routed to other agencies.
|
Routing - PLANNING | 2/11/2020 | | 2/11/2020 | | PASS |
David Moser
|
|
|
|
Plan Modification Accepted | | | 2/6/2020 | | DONE |
|
|
|
Plan Mod - Applicant proposes to delete parking lot work as part of Phase 1 and move the work to Phase 2
Sheet SP 1.0
|
PubWorks Occupancy Approval | 1/23/2020 | 1/23/2020 | 1/23/2020 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 1/8/2020 | 1/13/2020 | 1/13/2020 | A | FAIL |
Troy Cobbley
|
|
|
Provide plan modifications showing the actual fence/security/gate layout and the acutual fire hydrant locations. Repair the exit sign/emergency light.
mark Phone #: ###-####
|
BLD-Conference | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/5/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 10/16/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 10/11/2019 | 10/11/2019 | 10/16/2019 | | PASS |
Carl Westfall
|
|
|
plan mod "Turbo Air Hangar" (routed to staff)
|
Plan Reviewer's activity | | | 10/16/2019 | | PASS |
|
|
|
Plan mod review approved
|
Permit Ready to Issue | | | 10/16/2019 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
Routing - MECHANICAL | 10/14/2019 | | 10/15/2019 | | PASS |
Troy James
|
|
|
|
BLD-Wall cover | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-#### office and restrooms ok plywood mec deck is fire treated
|
Routing - PLAN CHECK | 10/11/2019 | | 10/14/2019 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Routing - PLAN CHECK | 10/14/2019 | | 10/14/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod review approved
|
Plan Modification Accepted | | | 10/11/2019 | | DONE |
|
|
|
plan mod-changes to gas line from a low pressure to a 2lb system inside the building with a regualro at each piece of equipment-sheets P2.2 & P4.0-assinged to plan reviewer
|
BLD-Foundation | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Jim Storey
|
|
|
Rick Phone #: 20-###-####
|
BLD-Footing | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Jim Storey
|
|
|
Rick- please go out around 2:30 or 3pm Phone #: ###-#### south half tenton ties rebar ok
|
BLD-Foundation | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Jim Storey
|
|
|
RICK- rebar inspection Phone #: ###-####
|
BLD-Footing | 7/3/2019 | 7/8/2019 | 7/8/2019 | A | PART |
Jim Storey
|
|
|
Please call 30 minutes before if possible. Phone #: ###-#### Inspection requested via web by Rick Slama pad ft ok
|
Print Occupancy Form | | | 6/27/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/11/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/11/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/11/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 10/18/2018 | 10/18/2018 | 1/3/2019 | | PASS |
Carl Westfall
|
|
|
(2nd done) 11/16/18 (new - 25 days) (ePlan - 63 sheets) Turbo Air
|
Routing Off Site - STRUCTURAL | 12/21/2018 | | 1/3/2019 | | PASS |
Carl Westfall
|
|
|
Jordan Terry (KPFF) The structural design for the building wasn't reviewed the 1st time.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/3/2019 | | DONE |
|
|
|
all met-NEED
ACHD-still need-emailed Tiffany@bigbuilders.com-MET
GC FORM-met
REVISED VALUE-met
|
Routing PW Drainage | 12/21/2018 | | 12/26/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 12/21/2018 | | 12/26/2018 | | PASS |
DeAnn Brown
|
|
|
|
Plan resubmittals received | | | 12/21/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/21/2018 | | 12/21/2018 | | PASS |
Carl Westfall
|
|
|
Pending approval by Structural
|
Route to Impact Fee Review | 12/17/2018 | 12/20/2018 | 12/17/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 10/18/2018 | | 12/17/2018 | | FAIL |
Carl Westfall
|
|
|
|
1st review completed | | | 12/17/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/17/2018 | | DONE |
|
|
|
|
Routing - FIRE | 10/18/2018 | 10/18/2018 | 11/23/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 10/18/2018 | | 11/5/2018 | | PASS |
Carl Westfall
|
|
|
Jordan Terry (KPFF)
|
Routing PW Sewer Design | 10/18/2018 | | 10/24/2018 | | FAIL |
DeAnn Brown
|
|
|
Re-design sewer service as a gravity sewer service stub to property line (perpendicular to mainline) and discharge 2" pressure service into 4" gravity service stub. Please coordinate with DeAnn Brown ###-####
|
Routing - MECHANICAL | 10/18/2018 | | 10/24/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 10/18/2018 | | 10/23/2018 | | PASS |
Terry Alber
|
|
|
No Fire System shown. No AFFF system allowed without prior approval.
|
Routing - Erosion and Sediment | 10/18/2018 | | 10/22/2018 | | PASS |
Michael Zawacki
|
|
|
Site prep required. Contractor responsible for providing access onto airport property.
|
Routing PW Street Lights | 10/18/2018 | | 10/19/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 10/18/2018 | | 10/19/2018 | | PASS |
Evan Carpenter
|
|
|
No new solid waste containers are proposed, so none are approved.
|
Routing - PLANNING | 10/18/2018 | | 10/19/2018 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 10/18/2018 | | 10/18/2018 | | PASS |
Doug Chausow
|
|
|
New address: 4194 S Orchard St
|
Routing - PUBLIC WORKS | 10/18/2018 | | 10/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 10/18/2018 | | 10/18/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 10/18/2018 | | 10/18/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC. See redline notes.
|
Intake Approval | | | 10/15/2018 | | PASS |
|
|
|
|
Intake Approval | | | 10/12/2018 | | FAIL |
Joe Bruce
|
|
|
1) Provide the Erosion and Sediment Control Narrative as noted on your checklist. It could not be located in the documents folder.
2) MB sheets are 17"x22" and do not meet the required minimum sheet size as noted on the checklist. All building plans shall be 18"x24" minimum sheet size.
3) MB sheets are not included in the sheet index. All sheets shall be listed on the sheet index.
|
Application received | | | 10/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2018 10:20AM
|
Third Notice | | 8/15/2020 | | | |
|
|
|
|