Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-03695
StatusFinaled
Name BIG D BUILDERS
Site Address 4184 S ORCHARD ST
Project NameTurbo Air Hangar - New Bldg
Customer Number 
ePlanReviewYes
Description
(TURBO AIR HANGAR – NEW BUILDING) (3-5-20 PLAN MODIFICATION TO DELETE THE PARKING LOT WORK FROM THIS PERMIT AND TO MOVE THAT WORK TO A FUTURE PERMIT TO CONSTRUCT A SEPARATE BUILDING ON SITE. THE PARKING LOT WILL NOT BE CONSTRUCTED UNDER PHASE 1 AND WILL INSTEAD BE CONSTRUCTED UNDER PHASE 2.) (10-16-19 PLAN MODIFICATION TO CHANGE THE GAS LINE FROM A LOW-PRESSURE SYSTEM TO A 2 POUND SYSTEM INSIDE THE BUILDING WITH A REGULATOR AT EACH PIECE OF EQUIPMENT. THE MECHANICAL ENGINEER WAS CHANGED FROM CHRISTIAN GELLERT TO JARED MILLER.) The fire sprinkler system is used for building area increase, for fire area, for fire flow, and because it is an aircraft hangar. This aircraft hangar is not approved for painting operations. The hangar that was formerly at this location was relocated under permit BLD18-03446. To construct a new 29,423 square foot pre-engineered steel building to be used as a Group II aircraft hangar on property leased from the City of Boise. Work is to include concrete pier spot footings, concrete piers, concrete continuous footings, concrete stem walls, tension tie grade beams, concrete slab on grade with hairpins, steel moment frames, steel rod cross bracing, steel purlins, metal roofing, metal siding, an R-30 liner system for roof insulation, R-25 exterior wall insulation, interior toilet rooms and office, a floor above the toilet rooms and office used for mechanical equipment and served by a ladder surrounded by a guard, bi-fold hangar doors, overhead door, side-hinged swinging egress doors, interior window, exterior horizontal sliding window, and finishes. Special Inspection is required for soils, for concrete, and for steel (including welding and bolting). The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/13/20208/10/2020 DONE
mailed 8-14-2020
Third Notice 5/12/20207/8/2020 DONE
mailed 7-9-2020
Second Notice 4/13/20205/7/2020 DONE
mailed 5-8-2020
First Notice 3/21/20204/3/2020 DONE
mailed 4-6-2020
Zoning Approval3/11/20203/11/20203/11/2020 DONE
DetailsDavid Moser
Permanent Occupancy  3/11/2020 DONE
BLD-Final3/9/20203/10/20203/10/2020PPASS
DetailsJim Storey
Mark Phone #: ###-####
FIRE-Final Inspection3/9/20203/10/20203/10/2020APASS
DetailsTroy Cobbley
Life safety passed.

Mark Phone #: ###-####
BLD-Final3/5/20203/6/20203/9/2020PCANC
DetailsJim Storey
mark Phone #: ###-####
FIRE-Final Inspection3/5/20203/6/20203/6/2020ACANC
DetailsTroy Cobbley
mark Phone #: ###-####
OVERRIDE  3/6/2020  
CHANGE STATUS TO (ISS)  3/6/2020 DONE
Permit Ready to Issue  3/6/2020 DONE
plan mod approved
Plan assigned to (CJW)2/6/20202/6/20203/5/2020 PASS
DetailsCarl Westfall
plan mod - (turbo air hangar) (route to staff)
Plan Reviewer's activity  3/5/2020 PASS
The Plan Mod was approved
Routing - FIRE3/4/20203/4/20203/4/2020 PASS
DetailsErika Akin
Attached revised comments to case
Routing - PLAN CHECK3/2/2020 3/4/2020 PASS
DetailsCarl Westfall
Plan resubmittals received  3/2/2020 DONE
Routing - FIRE2/11/20202/13/20292/24/2020 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Plan resubmittals requested  2/24/2020 DONE
Routing PW Street Lights2/11/2020 2/12/2020 PASS
DetailsTom Marshall
Routing PW Sewer Design2/11/2020 2/12/2020 PASS
DetailsDeAnn Brown
Routing PW Environmental2/11/2020 2/12/2020 PASS
DetailsRick Christenson
No AFFF system allowed without prior approval.
Routing PW Solid Waste2/11/2020 2/11/2020 PASS
DetailsEvan Carpenter
Routing - PUBLIC WORKS2/11/2020 2/11/2020 PASS
DetailsCandy A. Nichols
plan mod
Routing PW Drainage2/11/2020 2/11/2020 PASS
DetailsBrian Murphy
Routing - PLAN CHECK2/10/2020 2/11/2020 PASS
DetailsCarl Westfall
Defering the construction of the parking lot is OK with me. Routed to other agencies.
Routing - PLANNING2/11/2020 2/11/2020 PASS
DetailsDavid Moser
Plan Modification Accepted  2/6/2020 DONE
Plan Mod - Applicant proposes to delete parking lot work as part of Phase 1 and move the work to Phase 2

Sheet SP 1.0
PubWorks Occupancy Approval1/23/20201/23/20201/23/2020 DONE
DetailsTiffany Lowery
FIRE-Final Inspection1/8/20201/13/20201/13/2020AFAIL
DetailsTroy Cobbley
Provide plan modifications showing the actual fence/security/gate layout and the acutual fire hydrant locations. Repair the exit sign/emergency light.

mark Phone #: ###-####
BLD-Conference12/5/201912/6/201912/6/2019APASS
DetailsJim Storey
Mark Phone #: ###-####
CHANGE STATUS TO (ISS)  12/5/2019 DONE
plan mod
OVERRIDE  10/16/2019  
Plan assigned to (CJW)10/11/201910/11/201910/16/2019 PASS
DetailsCarl Westfall
plan mod "Turbo Air Hangar" (routed to staff)
Plan Reviewer's activity  10/16/2019 PASS
Plan mod review approved
Permit Ready to Issue  10/16/2019 DONE
**PLAN MOD - DO NOT REISSUE**
Routing - MECHANICAL10/14/2019 10/15/2019 PASS
DetailsTroy James
BLD-Wall cover10/11/201910/14/201910/14/2019APASS
DetailsDave Hannah
Rick Phone #: ###-#### office and restrooms ok plywood mec deck is fire treated
Routing - PLAN CHECK10/11/2019 10/14/2019 PASS
DetailsCarl Westfall
Plan intake review approved
Routing - PLAN CHECK10/14/2019 10/14/2019 PASS
DetailsCarl Westfall
Plan mod review approved
Plan Modification Accepted  10/11/2019 DONE
plan mod-changes to gas line from a low pressure to a 2lb system inside the building with a regualro at each piece of equipment-sheets P2.2 & P4.0-assinged to plan reviewer
BLD-Foundation9/23/20199/23/20199/23/2019PPASS
DetailsJim Storey
Rick Phone #: 20-###-####
BLD-Footing9/17/20199/17/20199/17/2019PPASS
DetailsJim Storey
Rick- please go out around 2:30 or 3pm Phone #: ###-#### south half tenton ties rebar ok
BLD-Foundation7/22/20197/22/20197/22/2019PPASS
DetailsJim Storey
RICK- rebar inspection Phone #: ###-####
BLD-Footing7/3/20197/8/20197/8/2019APART
DetailsJim Storey
Please call 30 minutes before if possible. Phone #: ###-#### Inspection requested via web by Rick Slama pad ft ok
Print Occupancy Form  6/27/2019 DONE
Print Occupancy Form  2/11/2019 DONE
Print Occupancy Form  2/11/2019 DONE
Issue PAID IN FULL permit  2/11/2019 DONE
OVERRIDE  1/3/2019  
Plan assigned to (CJW)10/18/201810/18/20181/3/2019 PASS
DetailsCarl Westfall
(2nd done) 11/16/18 (new - 25 days) (ePlan - 63 sheets) Turbo Air
Routing Off Site - STRUCTURAL12/21/2018 1/3/2019 PASS
DetailsCarl Westfall
Jordan Terry (KPFF) The structural design for the building wasn't reviewed the 1st time.
PLANS/APPL TAKEN TO FRONT DESK  1/3/2019 DONE
Permit Ready to Issue  1/3/2019 DONE
all met-NEED
ACHD-still need-emailed Tiffany@bigbuilders.com-MET
GC FORM-met
REVISED VALUE-met
Routing PW Drainage12/21/2018 12/26/2018 PASS
DetailsBrian Murphy
Routing PW Sewer Design12/21/2018 12/26/2018 PASS
DetailsDeAnn Brown
Plan resubmittals received  12/21/2018 DONE
Routing - PLAN CHECK12/21/2018 12/21/2018 PASS
DetailsCarl Westfall
Pending approval by Structural
Route to Impact Fee Review12/17/201812/20/201812/17/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK10/18/2018 12/17/2018 FAIL
DetailsCarl Westfall
1st review completed  12/17/2018 DONE
Plan resubmittals requested  12/17/2018 DONE
Routing - FIRE10/18/201810/18/201811/23/2018 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL10/18/2018 11/5/2018 PASS
DetailsCarl Westfall
Jordan Terry (KPFF)
Routing PW Sewer Design10/18/2018 10/24/2018 FAIL
DetailsDeAnn Brown
Re-design sewer service as a gravity sewer service stub to property line (perpendicular to mainline) and discharge 2" pressure service into 4" gravity service stub. Please coordinate with DeAnn Brown ###-####
Routing - MECHANICAL10/18/2018 10/24/2018 PASS
DetailsTroy James
Routing PW Environmental10/18/2018 10/23/2018 PASS
DetailsTerry Alber
No Fire System shown. No AFFF system allowed without prior approval.
Routing - Erosion and Sediment10/18/2018 10/22/2018 PASS
DetailsMichael Zawacki
Site prep required. Contractor responsible for providing access onto airport property.
Routing PW Street Lights10/18/2018 10/19/2018 PASS
DetailsTom Marshall
Routing PW Solid Waste10/18/2018 10/19/2018 PASS
DetailsEvan Carpenter
No new solid waste containers are proposed, so none are approved.
Routing - PLANNING10/18/2018 10/19/2018 PASS
DetailsDavid Moser
Routing - Addressing10/18/2018 10/18/2018 PASS
DetailsDoug Chausow
New address: 4194 S Orchard St
Routing - PUBLIC WORKS10/18/2018 10/18/2018 PASS
DetailsMorgan Webb
Routing PW Drainage10/18/2018 10/18/2018 PASS
DetailsBrian Murphy
Routing - PLUMBING10/18/2018 10/18/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC. See redline notes.
Intake Approval  10/15/2018 PASS
Intake Approval  10/12/2018 FAIL
DetailsJoe Bruce
1) Provide the Erosion and Sediment Control Narrative as noted on your checklist. It could not be located in the documents folder.
2) MB sheets are 17"x22" and do not meet the required minimum sheet size as noted on the checklist. All building plans shall be 18"x24" minimum sheet size.
3) MB sheets are not included in the sheet index. All sheets shall be listed on the sheet index.
Application received  10/8/2018 DONE
Application submitted via PDS Online on Oct 8 2018 10:20AM
Third Notice 8/15/2020