Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-04274
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 4423 E PARKCENTER BLVD
Project NameSutton Lot 4
Customer NumberEPLAN 04271 & BLD18-04272 TO 04274
ePlanReviewNo
Description
**WUI VALLEY ZONE B CLASS A ROOF REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** (4 PERMITS IN EPLAN UNDER BLD18-04271) Permit for the construction of a new 2088 sq. ft., 2 story (first story 1067 sq. ft., second story 1021sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 40 sq. ft. of covered patio/porch and a 462 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/2/20201/2/20201/2/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Laz Ponce
DOC - Permit Finaled1/2/20201/2/20201/2/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results1/2/20201/2/20201/2/2020PDONE
DetailsBrandon Shaw
ACH50- 4.1
BLD-Blower Door Test Results12/20/201912/26/201912/26/2019ACANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Final12/20/201912/26/201912/26/2019ACANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Energy code compliance10/23/201910/23/201910/23/2019PCANC
DetailsBrandon Shaw
Laz Phone #: ###-####
BLD-Energy code compliance10/18/201910/18/201910/18/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Laz Ponce
BLD-Framing/Rough-in10/15/201910/15/201910/15/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Framing/Rough-in10/11/201910/11/201910/11/2019APEND
DetailsBrandon Shaw
OK, pending Mech rough-in approval...
Routing - MECHANICAL9/19/2019 9/25/2019 PASS
DetailsTroy James
Plan Modification Accepted  9/19/2019 DONE
Amy called to open workflow for new Manual J's for all 4 permits
BLD-Wall Bracing9/5/20199/5/20199/5/2019PPASS
DetailsBrandon Shaw
Gillermo Phone #: ###-####
BLD-Footing1/18/20191/22/20191/22/2019APASS
DetailsDave Hannah
Ryan Phone #: ###-####
Issue PAID IN FULL permit  1/10/2019 DONE
Inspection Record Card- Bld  1/10/2019 DONE
OVERRIDE  12/4/2018  
Plan assigned to (J_N)11/27/201811/27/201812/4/2018 DONE
DetailsJenny Nelson
12/14 sfd L1 ePlan. 1st complete, Wui compliance, engineer stamp needs signed and dated
Routing - PLAN CHECK12/4/2018 12/4/2018 PASS
DetailsJenny Nelson
Per Ron Johnson ok to not treat as wui valley perimeter.
PLANS/APPL TAKEN TO FRONT DESK  12/4/2018 DONE
DetailsJenny Nelson
Permit Ready to Issue  12/4/2018 DONE
met
1st review completed  12/3/2018 FAIL
DetailsJenny Nelson
Wui compliance, engineer stamp needs signed and dated
Routing - PLAN CHECK11/27/2018 12/3/2018 FAIL
DetailsJenny Nelson
Route to Impact Fee Review11/27/201811/30/201811/28/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL11/27/2018 11/28/2018 PASS
DetailsTroy James
Routing - PUBLIC WORKS11/27/2018 11/28/2018 PASS
DetailsMorgan Webb
Routing - PLANNING11/27/2018 11/27/2018 PASS
DetailsKatelyn Menuge
Pending floodplain approval. DRH18-00387 and CFH18-00096
Routing - Addressing11/27/2018 11/27/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  11/27/2018 DONE
Recd Pcfee & Taken To Pln CK  11/27/2018 DONE
Intake Approval  11/27/2018 PASS
Application received 11/26/2018   
Application received 11/26/2018   
Application received 11/26/2018