BLD-Footing | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PEND |
Dave Hannah
|
|
|
in the alley behind // annie Phone #: ###-#### ok after spec inspection sign offs
|
BLD-Aging Inspection | 3/5/2020 | 3/5/2020 | 3/9/2020 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/4/2020 | 3/4/2020 | 3/9/2020 | | PEND |
Dave Hannah
|
|
|
|
BLD-Footing | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Dave Hannah
|
|
|
Annie- entrace to work area in thru the Alley Phone #: ###-#### needs spec.inspection
|
BLD-Footing | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PART |
Jim Storey
|
|
|
Anne Phone #: ###-#### rebar ok 4 locations/ vert at one ok to place wall.
|
BLD-Footing | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PART |
Dave Hannah
|
|
|
Annie Phone #: ###-#### first 6 ftgs ok
|
Issue PAID IN FULL permit | | | 6/14/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/14/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 5/9/2019 | 5/9/2019 | 6/13/2019 | | PASS |
Joe Bruce
|
|
|
06/12 (3rd Rev) 05/31 (L3) Union Block Basement, ePlan
|
Routing Off Site - STRUCTURAL | 6/6/2019 | | 6/13/2019 | | PASS |
Joe Bruce
|
|
|
KPFF
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/13/2019 | | DONE |
|
|
|
ALL MET (lio@parklaneco.com)
Need GC
Need Rev Val
|
Plan resubmittals received | | | 6/6/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 6/6/2019 | | 6/6/2019 | | PASS |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 5/31/2019 | 6/3/2019 | 6/3/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 5/9/2019 | 5/9/2019 | 5/31/2019 | | PASS |
Mark Scharfen
|
|
|
05/31 Completed fire review, uploaded rev_fire 05.31.2019.pdf.
|
Routing - PLAN CHECK | 5/9/2019 | | 5/31/2019 | | FAIL |
Joe Bruce
|
|
|
|
1st review completed | | | 5/31/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 5/9/2019 | | 5/24/2019 | | FAIL |
Joe Bruce
|
|
|
KPFF - Corrections Required, see ePlan changemarks.
|
Routing - Design Review | 5/9/2019 | | 5/13/2019 | | PASS |
Josh Wilson
|
|
|
Ok for basement work only. Condiitons for exterior work have not been met.
|
Routing - PLANNING | 5/9/2019 | | 5/10/2019 | | PASS |
David Moser
|
|
|
See DRH17-00571
|
Routing - Erosion and Sediment | 5/9/2019 | | 5/10/2019 | | PASS |
Andy J. Long
|
|
|
project may be covered under existing permit, ESC18-00778. No new ESC permit required.
|
Routing - Addressing | 5/9/2019 | | 5/9/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2019 | | 5/9/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 5/6/2019 | | PASS |
|
|
|
|
Intake Approval | | | 1/25/2019 | | FAIL |
Joe Bruce
|
|
|
1. Provide a COMPLETE soils report that is stamped and signed by an Idaho licensed engineer for the soil bearing pressure stated on the structural drawings. The soils report submitted was incomplete and shall comply with IBC section 1803.6.
2. Plan sheet, S3.1 does not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheet with a blank 4” x 2” located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
|
Application received | | | 1/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2019 5:33PM
|