Permit Information
Permit NumberBLD19-00366
StatusReady to Issue
Name LAYTON CONSTRUCTION
Site Address 330 N 2ND ST
Project NameSt. Lukes DCIP Shipping & Rece
Customer Number 
ePlanReviewYes
Description
(ST. LUKE'S DCIP SHIPPING & RECEIVING) ""DEFERRED SUBMITTAL FOR THE TRANSVAC SYSTEM"" (PLAN MOD #1 FOR THE RECONFIGURATION OF SHIPPING AND RECEIVING AREAS INCLUDING ELECTRICAL, PLUMBING AND MECHANICAL) This project is for the construction of St. Luke's Shipping and Receiving building and associated Tunnel. The building is 33,801 sq. ft. including a 11,902 sq. ft. basement, 11,424 sq. ft. first story and a 10,475 sq. ft. second story. the pedestrian walkway tunnel 1,726 sq. ft. but is not considered to contribute to building area. This building is fully fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permit Ready to Issue  7/23/2020 DONE
NEED UPDATE VALUE PER PLAN MOD APP
Plan assigned to (CDM)5/18/20205/18/20207/22/2020 PASS
DetailsCarl D Madsen
Deffered Submittal 1
Routing - PLAN CHECK7/22/2020 7/22/2020 PASS
DetailsCarl D Madsen
BLD-Framing/Rough-in6/30/20207/1/20207/1/2020PPART
DetailsDave Hannah
//Screened// Charlie - Call for access Phone #: ###-#### nw stair tower ok
Routing - FIRE5/21/20205/21/20206/8/2020 PASS
DetailsErika Akin
Deferred submittal trans vac system. No new comments attached. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems.
Routing - PLAN CHECK5/21/2020 6/5/2020 FAIL
DetailsCarl D Madsen
Routing - MECHANICAL5/21/2020 5/21/2020 PASS
DetailsTroy James
Plan Modification Accepted  5/18/2020 DONE
Per Angie B. Deffered Submittal 1 5-18-20
BLD-Framing/Rough-in4/23/20204/24/20204/24/2020APASS
DetailsDave Hannah
Call for access Phone #: 2086970439 >> Inspection requested via mobile web by Charles F. Kajkowski
BLD-Conference4/22/20204/23/20204/23/2020APASS
DetailsDave Hannah
Call for access Phone #: 2086970439 >> Inspection requested via mobile web by Charlie Kajkowski
BLD-Framing/Rough-in4/8/20204/9/20204/9/2020APASS
DetailsBrandon Shaw
Call for access Phone #: 2086970439 >> Inspection requested via mobile web by Charlie
BLD-Framing/Rough-in4/3/20204/3/20204/6/2020PPART
DetailsDave Hannah
Call for access Phone #: 2086970439 >> Inspection requested via mobile web by Charlie Kajkowski basement ok to top walls with sheetrock
BLD-Framing/Rough-in4/2/20204/3/20204/3/2020APART
DetailsDave Hannah
Call for access Phone #: 2086970439 >> Inspection requested via mobile web by Charlie Kajkowski west side ext ok
(F) Reprint permit  3/11/2020 DONE
Print Occupancy Form  3/11/2020 DONE
Telephone call  3/11/2020 DONE
email permit to be sign to - hrunyon@laytonconstruction.com PLAN MOD EPLAN WILL NEED TO BE RELEASE
BLD-Framing/Rough-in3/9/20203/9/20203/9/2020PPART
DetailsDave Hannah
Charlie Phone #: ###-#### south ext walllevels 1 and 2 ok and second layers of ext rock
CHANGE STATUS TO (ISS)  3/9/2020 DONE
email permit to be signed to hruyon@laytonconstruction.com **permit was not scan when issued the 1st time**
Plan assigned to (CDM)1/23/20201/23/20202/25/2020 PASS
DetailsCarl D Madsen
Permit Ready to Issue  2/25/2020  
**DO NOT REISSUE - PLAN MOD**
Routing - FIRE2/5/20202/5/20202/24/2020 PASS
DetailsErika Akin
Reviewed mod, no changes to previous review comments
Routing - PLAN CHECK2/5/2020 2/13/2020 PASS
DetailsCarl D Madsen
Routing - PLUMBING2/5/2020 2/10/2020 PASS
DetailsDaryl Spivey
Plan mod. Per plan and ISPC and NFPA 99.
Routing - MECHANICAL2/5/2020 2/6/2020 PASS
DetailsTroy James
Plan Modification Accepted  1/23/2020 DONE
plan mod requested by Isaac Prado of Hummel. St. Luke's user group requested room reconfigurations and program changes on Level SB and Level 1. Sheets to be uploaded: G020, G100A, G100B, G111A, G111B, S111, S306, A010, A011, A100, A100a, A100t, A111, A230, A601, A602, A700, A800, Q100, Q110, Q111, P002, P100, P101, P111, P401, M002, M003, M100, M111, M200, M211, M401, EC100, EC100t, EC111, EC112, EF100, EF111, EL100, EL100t, EL111, EL700, EP100, EP100t, EP111, EP112, EP201, EP715, EP716, EP717, EP770
Telephone call  1/23/2020 DONE
met
**need 306 for plan mod**
BLD-Conference9/5/20199/6/20199/6/2019APEND
DetailsDave Hannah
As early as possible Phone #: 2086970439 >> Inspection requested via mobile web by Charles F. Kajkowski ok after spec insp[ection oks
BLD-Foundation9/3/20199/4/20199/4/2019APEND
DetailsDave Hannah
Brain Phone #: ###-####
Issue PAID IN FULL permit  6/17/2019 DONE
Print Occupancy Form  6/17/2019 DONE
Routing - FIRE5/22/20195/22/20196/3/2019 PASS
DetailsErika Akin
Attached comments to case
Plan assigned to (CDM)2/11/20192/13/20196/3/2019 PASS
DetailsCarl D Madsen
502 St. Luke's DCIP Shipping & Receiving
Routing Off Site - STRUCTURAL5/22/2019 6/3/2019 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/3/2019 DONE
Permit Ready to Issue  6/3/2019 DONE
MET (alauda@hummelarch.com)
NEED
GC FORM
REVISED VALUE
(ACHD CREATED AND FEE ADDED JUST FOR SHIPPING)
Routing PW Sewer Design5/29/2019 5/30/2019 PASS
DetailsDeAnn Brown
Routing - PUBLIC WORKS5/22/2019 5/29/2019 PASS
DetailsAngela Hardy
Routing Off Site - STRUCTURAL2/13/2019 5/28/2019 FAIL
DetailsCarl D Madsen
KPFF
Routing - PLAN CHECK5/22/2019 5/25/2019 PASS
DetailsCarl D Madsen
Routing - MECHANICAL5/22/2019 5/22/2019 PASS
DetailsTroy James
Routing - PLAN CHECK4/6/2019 5/4/2019 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL4/6/2019 5/4/2019 FAIL
DetailsCarl D Madsen
Routing - FIRE4/6/20194/6/20195/3/2019 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Routing - Design Review4/6/2019 4/15/2019 PASS
DetailsJosh Wilson
Routing - PLANNING4/6/2019 4/15/2019 PASS
DetailsCody Riddle
Routing PW Sewer Design4/12/2019 4/12/2019 FAIL
DetailsDeAnn Brown
Sewer easement vacation and ownership transfer agreement must be complete prior to approval of this building permit.
Routing PW Drainage4/8/2019 4/8/2019 PASS
DetailsBrian Murphy
Route to Impact Fee Review3/28/20193/31/20193/29/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE2/11/20192/13/20193/28/2019 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
1st review completed  3/28/2019 DONE
Routing - PLAN CHECK2/13/2019 3/2/2019 FAIL
DetailsCarl D Madsen
Routing PW Sewer Design2/13/2019 2/22/2019 FAIL
DetailsDeAnn Brown
Sewer ownership transfer must be complete prior to approval of this building permit. Also, I only see one 4" waste line exiting the building on plumbing plans, but the site work package shows two 4" sewer services.
Routing PW Solid Waste2/13/2019 2/22/2019 PASS
DetailsEvan Carpenter
Routing - Design Review2/13/2019 2/22/2019 FAIL
DetailsJosh Wilson
Applicant will upload Landscape Plan with 2nd review.
Routing - PLANNING2/13/2019 2/22/2019 FAIL
DetailsCody Riddle
Applicant will upload a landscape plan for review with 2nd review cycle.
Routing PW Environmental2/13/2019 2/20/2019 PASS
DetailsTerry Alber
No Pretreatment issues. Tunnel sump pump discharges to surface, not sewer.
Routing PW Geothermal2/13/2019 2/20/2019 PASS
DetailsJavier Guzman
City geothermal lines in 1st Street. Contact Public Works if a utility conflic arises.
Routing - MECHANICAL2/13/2019 2/15/2019 PASS
DetailsTroy James
Routing PW Street Lights2/13/2019 2/14/2019 PASS
DetailsTom Marshall
Routing - PLUMBING2/13/2019 2/13/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC and NFPA 99.
Routing PW Drainage2/13/2019 2/13/2019 FAIL
DetailsBrian Murphy
NEED CIVIL SET WITH REFERANCE TO GRADING PERMIT #
Routing - Addressing2/13/2019 2/13/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/13/2019 2/13/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment2/13/2019 2/13/2019 PASS
DetailsAndy J. Long
VOID. See ESC18-01168
Intake Approval  2/11/2019 PASS
DetailsMichael Hanson
Prescreen approval per M_H
Application received  2/5/2019 DONE
Application submitted via PDS Online on Feb 5 2019 8:52AM