Permit Information
Permit NumberBLD19-00387
StatusFinaled
Name TRADEWINDS GENERAL CONTRACTING INC
Site Address 1811 S OWYHEE ST
Project NameLot 23
Customer NumberDEMO BLD19-00076
ePlanReviewNo
Description
***06/27/19 PLAN MODIFICATION TO RELOCATE FOUNDATION AND CENTER IT IN THE LOT*** Permit for the construction of a new 1574 sq. ft., two story (first story 867 sq. ft., second story 707 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 120 sq. ft. of covered patio/porch and a 464 sq. ft. detached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/21/201910/21/201910/21/2019PPASS
DetailsJim Storey
Jason Phone #: ###-####
DOC - Permit Finaled10/21/201910/21/201910/21/2019PPASS
DetailsJim Storey
BLD-Framing/Rough-in7/30/20197/30/20197/30/2019PCANC
DetailsMike Jordan
Jason Phone #: ###-####
BLD-Energy code compliance7/30/20197/30/20197/30/2019PPASS
DetailsMike Jordan
Jason Phone #: ###-####
BLD-Framing/Rough-in7/23/20197/24/20197/24/2019APASS
DetailsJim Storey
Jason Phone #: ###-####
Inspection Record Card- Bld  7/10/2019 DONE
CHANGE STATUS TO (ISS)  7/10/2019 DONE
OVERRIDE  6/27/2019  
BLD-Wall Bracing6/27/20196/27/20196/27/2019PPASS
DetailsJim Storey
Jason Phone #: ###-####
Plan assigned to (RDP)6/26/20196/26/20196/27/2019 DONE
DetailsRob Patrick
07/03 "PLAN MOD" sfd L1 PAPER...Gave 2 copies to Katelyn
Routing - PLANNING6/27/2019 6/27/2019 PASS
DetailsKatelyn Menuge
4-foot setbacks on each side okay
Plan Reviewer's activity  6/27/2019 DONE
Delivered both copies of Dite Plan to Katelyn for review
Routing - PLAN CHECK6/27/2019 6/27/2019 PASS
DetailsRob Patrick
Permit Ready to Issue  6/27/2019 DONE
Plan Mod Approved
DO NOT REISSUE
Telephone call  6/27/2019 DONE
Spoke with Jason to inform him the plan mod is approved and what fees are due.
Plan Modification Accepted  6/26/2019 DONE
site plan being modified. Sheet A1
BLD-Wall Bracing6/20/20196/20/20196/20/2019PFAIL
DetailsJim Storey
shear // Jason Phone #: ###-#### resubmit for change in lot location of building.
BLD-Footing4/11/20194/11/20194/11/2019PPART
DetailsJim Storey
JR Phone #: ###-#### ft ok resubmit for change in lot location of building.
Issue PAID IN FULL permit  4/3/2019 DONE
OVERRIDE  3/5/2019  
Plan assigned to (RDP)2/13/20192/13/20193/5/2019 DONE
DetailsRob Patrick
02/19 sfd L1 PAPER...2/14 Failed; Needs to correct wall bracing.
Inspection Record Card- Bld  3/5/2019 DONE
Telephone call  3/5/2019 DONE
Left voicemail for Jason to inform him the permit is ready and what fees are due.
Routing - PLAN CHECK3/5/2019 3/5/2019 PASS
DetailsRob Patrick
Case Summary (BLD)  3/5/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  3/5/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  3/5/2019 DONE
Plan resubmittals received  2/28/2019 DONE
Two copies of each S1, S2, S3.1 and S3.2 stamped and taken to plan reviewer
Routing - PLAN CHECK2/13/2019 2/14/2019 FAIL
DetailsRob Patrick
Needs to correct wall bracing.
1st review completed  2/14/2019 FAIL
DetailsRob Patrick
Needs to correct wall bracing.
Plan assigned to (M_H)2/6/2019 2/13/2019 DEFR
DetailsMichael Hanson
02/19 #402 L1 Paper
Routing - PLANNING2/6/2019 2/13/2019 PASS
DetailsKatelyn Menuge
Rear setback for garage must be minimum of 7-feet.
Routing - MECHANICAL2/8/2019 2/12/2019 PASS
DetailsTroy James
Routing - Addressing2/6/2019 2/8/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/6/2019 2/8/2019 PASS
DetailsAngela Hardy
Route to Impact Fee Review2/6/20192/9/20192/7/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Intake Approval  2/6/2019 PASS
Plans ACCEPTED BY PLAN TECH  2/6/2019 DONE
Recd Pcfee & Taken To Pln CK  2/6/2019 DONE
Application received 2/6/2019