BLD-Final | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Final | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Dave Hannah
|
|
|
3.69
|
PubWorks Occupancy Approval | 8/22/2019 | 8/22/2019 | 8/22/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | NR |
Brandon Shaw
|
|
|
Need Ele, Mec, and PW finals...
|
BLD-Other | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Framing/Rough-in | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Brandon Shaw
|
|
|
Fire block dropped ceiling in pantry... OK to insulate...
|
BLD-Foundation | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 3/28/2019 | 3/28/2019 | 3/28/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 3/14/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 3/6/2019 | 3/6/2019 | 3/14/2019 | | DONE |
Jenny Nelson
|
|
|
Plan Mod. 1st complete 3/11, shear wall over windows, waiting on mechanical and ESC reviews.
|
Issue PAID IN FULL permit | | | 3/14/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/14/2019 | | 3/14/2019 | | PASS |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 3/14/2019 | | DONE |
|
|
|
plan mod approved
|
1st review completed | | | 3/13/2019 | | DONE |
|
|
|
Plan Mod
|
Routing - MECHANICAL | 3/7/2019 | | 3/13/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Erosion and Sediment | 3/8/2019 | | 3/11/2019 | | PASS |
Andy J. Long
|
|
|
ESCP approved. Valid stormwater team.
|
Routing - PLAN CHECK | 3/6/2019 | | 3/11/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Plan Modification Accepted | | | 3/6/2019 | | |
|
|
|
NEVER BEEN ISSUED - resubmittal
|
OVERRIDE | | | 2/22/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 2/14/2019 | 2/14/2019 | 2/22/2019 | | DONE |
Jenny Nelson
|
|
|
02/26 sfd L1 ePlan. 1st complete 2/20, waiting for fire review
|
Routing - MECHANICAL | 2/22/2019 | | 2/22/2019 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 2/22/2019 | | DONE |
|
|
|
met
|
Routing - FIRE | 2/19/2019 | 2/19/2019 | 2/20/2019 | | PASS |
Lee G Meredith
|
|
|
Inadequate fire flow available. Emailed review comments. to applicant.
2-21 Ron Johnson provided an updated fire flow availability list that allows the current fire flow to be adequate due to fire reserve volume at the tank for this development. This permit will be passed when resubmitted.
|
1st review completed | | | 2/20/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 2/13/2019 | | 2/20/2019 | | PASS |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 2/13/2019 | 2/16/2019 | 2/14/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (BJM) | 2/13/2019 | 2/13/2019 | 2/14/2019 | | DEFR |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 2/13/2019 | | 2/14/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLANNING | 2/13/2019 | | 2/13/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 2/13/2019 | | 2/13/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/13/2019 | | 2/13/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 2/13/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/13/2019 | | DONE |
|
|
|
|
Application received | | | 2/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 12 2019 11:26AM
|
Intake Approval | | | 2/12/2019 | | FAIL |
|
|
|
Prescritpive code on E1.0 Main Electrical & E1.1 Upper Electircal needs be 2017 IECC
|