First Notice | | 7/27/2019 | 8/5/2019 | | DONE |
|
|
|
mailed 8-6-2019
|
Permanent Occupancy | | | 7/17/2019 | | DONE |
|
|
|
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Dave Hannah
|
|
|
Armando Phone #: ###-####
|
BLD-Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PEND |
Dave Hannah
|
|
|
Armando Phone #: ###-####
|
Zoning Approval | 7/16/2019 | 7/16/2019 | 7/16/2019 | | PASS |
KayCee Babb
|
|
|
|
FIRE-Final Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Jim Page
|
|
|
Armando Phone #: ###-####
|
Zoning Approval | 7/15/2019 | 7/15/2019 | 7/15/2019 | | FAIL |
KayCee Babb
|
|
|
Accessible parking sign needs to be removed from non accessible parking stall and relocated to newly painted accesible parking stall to meet ADA requirements.
|
FIRE-Final Inspection | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | DONE |
Jim Page
|
|
|
Life fire safety inspection has already been completed for this permit.
ARMADO Phone #: ###-####
|
FIRE-Final Inspection | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.
Armando Phone #: ###-####
|
Zoning Approval | 7/10/2019 | 7/10/2019 | 7/11/2019 | | FAIL |
KayCee Babb
|
|
|
Parking lot needs to be striped prior to sign-off. Building and landscaping comply with CZC19-00016.
|
BLD-Framing/Rough-in | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
BLD-Conference | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | DONE |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
Route to Impact Fee Review | 3/14/2019 | 3/17/2019 | 3/15/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Issue PAID IN FULL permit | | | 3/15/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/15/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 2/22/2019 | 2/22/2019 | 3/14/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/13 (L3) Radar Bldg - Diamond Parking Office (Basement), ePlan
|
Routing - PLAN CHECK | 2/22/2019 | | 3/14/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 3/14/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 3/14/2019 | | 3/14/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 3/14/2019 | | 3/14/2019 | | PASS |
KayCee Babb
|
|
|
Per CZC19-00016, as updated 3-11-19.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/14/2019 | | DONE |
|
|
|
NEED
REVISED VALUE
|
Routing - MECHANICAL | 3/8/2019 | | 3/8/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 2/22/2019 | | 2/27/2019 | | FAIL |
Troy James
|
|
|
See eplan for correction
|
Routing - Addressing | 2/22/2019 | | 2/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/22/2019 | | 2/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 2/22/2019 | | 2/22/2019 | | FAIL |
KayCee Babb
|
|
|
Submitted plans vary from those approved through CZC19-00016. Elevations differ and rooftop mechanical equipment was never reviewed. Applicant needs to provide Design Review Staff with updated drawings and equipment details for review.
|
Routing - PLUMBING | 2/22/2019 | | 2/22/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 2/22/2019 | | PASS |
Brian McGowan
|
|
|
Prescreen approved by Brian McGowan.
|
Application received | | | 2/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 15 2019 4:59PM
|