Permit Information
Permit NumberBLD19-00547
StatusFinaled
Name ALTECCA LLC
Site Address 109 S 10TH ST
Project Namea cafe’ Tenant Improvement
Customer Number 
ePlanReviewYes
Description
(A CAFE) (6/28/19 PLAN MODIFICATION TO MODIFY ERU DUCT IN SPACE TO BE CLOSED OFF WITH DAMPER.) **Permit for a tenant improvement in an existing 1,190 sq. ft. tenant space for a new restaurant and commercial kitchen. Work to include construction of new interior nonbearing partition walls; new seating, bar area, and kitchen; new overhead roll-up door; plumbing, electrical, and mechanical work; and interior finishes in compliance with Ch. 8 of the 2015 IBC. A commercial kitchen with a new Type I Hood and new UL listed kitchen equipment is being installed. Tenant is utilizing the shared restrooms in the common area located on the 1st floor. All work to be done per the approved plans and applicable codes and ordinances. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations to the sprinkler/alarm system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/15/20199/18/2019 DONE
mailed 9-19-19
First Notice 7/26/20198/5/2019 DONE
mailed 8-5-2019
BLD-Final7/16/20197/16/20197/16/2019PPASS
DetailsDave Hannah
Taylor Phone #: ###-####
FIRE-Final Inspection7/16/20197/16/20197/16/2019PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, hood suppression system inspection is complete, fire extinguishers are placed, including Class K extinguisher and all have current inspection tags. Final life fire safety inspection for area of work complete.

Taylor Phone #: ###-####
Permanent Occupancy  7/16/2019 DONE
Zoning Approval7/12/20197/12/20197/12/2019 DONE
DetailsAndrea Tuning
FIRE-Conference7/11/20197/11/20197/11/2019PDONE
DetailsJim Page
Fire conference complete.

Taylor Phone #: ###-####
BLD-Ceiling Grid Inspection6/28/20197/1/20197/1/2019APASS
DetailsDave Hannah
Taylor Phone #: ###-####
Plan assigned to (JHB)6/26/20196/26/20196/28/2019 PASS
DetailsJoe Bruce
(plan mod) A-Cafe
Routing - PLAN CHECK6/28/2019 6/28/2019 PASS
DetailsJoe Bruce
Mechanical ductwork modified as inspected in field by Chad Schwendiman. **JHB**
Permit Ready to Issue  6/28/2019 DONE
DO NOT ISSUE-plan mod
CHANGE STATUS TO (ISS)  6/28/2019 DONE
Plan Modification Accepted  6/26/2019 DONE
close a mechanical damper
BLD-Ceiling Grid Inspection6/24/20196/24/20196/24/2019PCANC
DetailsDave Hannah
Taylor Phone #: ###-####
BLD-Framing/Rough-in5/28/20195/28/20195/28/2019PPASS
DetailsDave Hannah
BLD-Conference5/24/20195/28/20195/28/2019ADONE
DetailsDave Hannah
Taylor Phone #: ###-####
CHANGE STATUS TO (ISS)  4/25/2019 DONE
Plan assigned to (JHB)3/21/20193/21/20194/24/2019 PASS
DetailsJoe Bruce
04/23 (2nd Rev) 04/15 (L3) A-Cafe Level 3 ePlan (Plan Check, Struc)
PLANS/APPL TAKEN TO FRONT DESK  4/24/2019 DONE
Permit Ready to Issue  4/24/2019 DONE
ALL MET-
NEED
GC FORM
REVISED VALUE
Issue PAID IN FULL permit  4/24/2019 DONE
Print Occupancy Form  4/24/2019 DONE
CHANGE STATUS TO (RDY)  4/24/2019 DONE
Waiting for Sewer fees to be paid,- Change status to issued when sewer fees are paid and release plans in eplan
Routing Off Site - STRUCTURAL4/17/2019 4/23/2019 PASS
DetailsJoe Bruce
Routing - PLAN CHECK4/17/2019 4/22/2019 PASS
DetailsJoe Bruce
Plan resubmittals received  4/17/2019 DONE
DetailsJoe Bruce
Route to Impact Fee Review4/15/20194/18/20194/16/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE3/21/20193/21/20194/15/2019 PASS
DetailsMark Scharfen
IFC Review 04.15.2019.pdf
1st review completed  4/15/2019 DONE
DetailsJoe Bruce
Plan resubmittals requested  4/15/2019 DONE
DetailsJoe Bruce
Routing - PLAN CHECK3/21/2019 4/11/2019 FAIL
DetailsJoe Bruce
Routing Off Site - STRUCTURAL3/21/2019 4/3/2019 FAIL
DetailsJoe Bruce
Routing - MECHANICAL3/21/2019 3/26/2019 PASS
DetailsTroy James
Routing PW Environmental3/21/2019 3/25/2019 PASS
DetailsTerry Alber
Based on on-site inspection, grease abatement is available. Size of grease interceptor may or may not be adequate for all facilities in building. Peak flow rate of all connected facilities shall not exceed manufacturer's rating.
Intake Approval  3/21/2019 PASS
DetailsAdele J Schaffeld-Griffin
pre screen accepted by M_H
Routing PW Solid Waste3/21/2019 3/21/2019 PASS
DetailsEvan Carpenter
Routing - PLUMBING3/21/2019 3/21/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing3/21/2019 3/21/2019 PASS
DetailsDoug Chausow
Corrected address: 109 S 10th St
Routing - PUBLIC WORKS3/21/2019 3/21/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment3/21/2019 3/21/2019 PASS
DetailsMichael Zawacki
Minor TI, no disturbance, no ESC required.
Routing - Design Review3/21/2019 3/21/2019 PASS
DetailsKayCee Babb
Per DRH19-00059 and rooftop mechanical equipment approved through DRH19-00080.
Intake Approval  3/1/2019 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Provide structural calculations demonstrating sufficient structural capacity for the new mechanical equipment on the roof.
Application received  2/22/2019 DONE
Application submitted via PDS Online on Feb 22 2019 1:13PM