BLD-Final | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
DOC - Permit Finaled | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####,, hand rail ?s
|
BLD-Energy code compliance | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Tyler Phone #: ###-####
|
BLD-Energy code compliance | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | NR |
Mike Jordan
|
|
|
Neil Phone #: ###-####
|
BLD-Energy code compliance | 6/19/2019 | 6/20/2019 | 6/20/2019 | P | NR |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Wall Bracing | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Foundation | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Tony Young
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Tony Young
|
|
|
Tim Phone #: ###-####
|
PubWorks Subgrade Approval | 4/18/2019 | 4/18/2019 | 4/18/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | NR |
Tony Young
|
|
|
Tim Phone #: ###-####,, needs soils report 1st
|
Issue PAID IN FULL permit | | | 3/22/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/19/2019 | | 3/21/2019 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 3/21/2019 | | 3/21/2019 | | DONE |
Michael Hanson
|
|
|
03/25 #406 L2 Paper
|
1st review completed | | | 3/21/2019 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 3/21/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 3/21/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/21/2019 | | DONE |
|
|
|
MET
|
Telephone call | | | 3/21/2019 | | DONE |
|
|
|
Left voicemail for Bill to inform him the permit is ready and what fees are due.
|
Routing PW Grading-Hillside | 3/19/2019 | | 3/20/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - Erosion and Sediment | 3/19/2019 | | 3/20/2019 | | PASS |
Michael Zawacki
|
|
|
TI. No ESC required.
|
Routing Walk-In (Zoning) | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two and routed
|
Plan assigned to (JAB) Josh | 3/19/2019 | 3/19/2019 | 3/19/2019 | | DONE |
Josh Bogle
|
|
|
3/25 addition, paper - Hillside
|
Application received | | 3/19/2019 | | | |
|
|
|
|