BLD-Final | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
DOC - Permit Finaled | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 5/3/2019 | 5/7/2019 | 5/7/2019 | A | PASS |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
BLD-Energy code compliance | 5/2/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
BLD-Wall Bracing | 4/22/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Jim Storey
|
|
|
shear // Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 4/22/2019 | 4/25/2019 | 4/25/2019 | A | NR |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
BLD-Foundation | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Jim Storey
|
|
|
please call Ryan for access Phone #: ###-#### ft and wall ok
|
Routing Walk-In (Zoning) | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Andrea Tuning
|
|
|
|
Routing Walk-In (BLD) | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 3/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 3/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
1st review completed | | | 3/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 3/28/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/28/2019 | | DONE |
|
|
|
|
Intake Approval | | | 3/25/2019 | | FAIL |
|
|
|
Needs
Full floor pans and 2nd copy
|
Plan Reviewer's activity | | | 3/25/2019 | | FAIL |
Brian McGowan
|
|
|
A scaled drawing of the existing upper and lower floor plans are needed in order to verify the headers/beams specified on the drawings (signed and stamped engineering would be acceptable).
|
Application received | | 3/25/2019 | | | |
|
|
|
|