BLD-Final | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Tony Young
|
|
|
Noah Phone #: ###-####
|
DOC - Permit Finaled | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, ok pending DRH permit
|
Zoning Approval | 10/10/2019 | 10/10/2019 | 10/10/2019 | | PASS |
KayCee Babb
|
|
|
Applicant is responsible for finishing the painting of the structure. Any alterations required due to delay of protecting wood finishes will need review by Design Review Staff.
|
BLD-Conference | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PART |
Tony Young
|
|
|
Leah Phone #: ###-####,, look at job prior to the final,, mostly cosmetic concerns,, needs step on front,, needs address
|
Zoning Approval | 9/17/2019 | 9/17/2019 | 9/17/2019 | | FAIL |
KayCee Babb
|
|
|
Finishes were incomplete, per DRH19-00140
|
BLD-Framing/Rough-in | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Tony Young
|
|
|
Noah Phone #: ###-####,, footings not looked at but per owner and contractor was 30" deep with 4 rebar in sonotube,, frame ok to cover
|
Routing Walk-In (BLD) | 7/9/2019 | 7/9/2019 | 7/9/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/9/2019 | | 7/9/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/9/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/9/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/9/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | FAIL |
Josh Bogle
|
|
|
needs constrcution details
|
Routing - PLAN CHECK | 7/1/2019 | | 7/1/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 5/15/2019 | 5/15/2019 | 5/16/2019 | P | PASS |
Josh Bogle
|
|
|
no contact with Joe on this day
|
Routing Walk-In (Zoning) | 3/26/2019 | 3/26/2019 | 3/27/2019 | P | FAIL |
|
|
|
Will need Design Review for a substandard lot
|
1st review completed | | | 3/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Application received | | 3/26/2019 | | | |
|
|
|
|