OVERRIDE | | | 6/29/2020 | | |
|
|
|
|
OVERRIDE | | | 6/29/2020 | | |
|
|
|
|
Plan assigned to (Joe) | 6/22/2020 | 6/22/2020 | 6/29/2020 | | PASS |
Joe Bruce
|
|
|
07/01 plan mod #3- Remove green rood from project- plan mod fee sheet in Eplan
|
Permit Ready to Issue | | | 6/29/2020 | | DONE |
|
|
|
NEED UPDATED VALUE
Plan mod
|
Routing - Design Review | 6/26/2020 | | 6/26/2020 | | PASS |
Katelyn Menuge
|
|
|
Green Roof Removal okay.
|
Routing - PLAN CHECK | 6/26/2020 | | 6/26/2020 | | PASS |
Joe Bruce
|
|
|
Plan mod to remove green roof has been passed.
|
Plan Reviewer's activity | | | 6/24/2020 | | DONE |
Joe Bruce
|
|
|
Prescreen accepted for plan mod to remove green roof. **JHB**
|
Plan Modification Accepted | | | 6/22/2020 | | DONE |
|
|
|
plan mod #3
|
BLD-Final | 6/12/2020 | 6/12/2020 | 6/17/2020 | P | PART |
Dave Hannah
|
|
|
Zach - *Screened* Phone #: ###-#### rest rooms ok
|
Temporary Occupancy | 6/8/2020 | 9/6/2020 | 6/8/2020 | | DONE |
Brittany Hill
|
|
|
|
Zoning Approval Temp | 6/8/2020 | 6/8/2020 | 6/8/2020 | | PASS |
Katelyn Menuge
|
|
|
Temporary - Will need to complete exterior work on patio and roof garden prior to final
|
BLD-Final | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | NR |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
FIRE-Final Inspection | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | PART |
Jim Page
|
|
|
Public restrooms off of common corridor are attached to this permit, final life fire safety inspection for public restrooms complete, permit will remain in issued status until all life fire safety items are complete with restaurant TI.
Zack Phone #: ###-####
|
BLD-Final | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | PART |
Dave Hannah
|
|
|
is there a fire, life , safety inspection other than the final? Phone #: ###-#### Inspection requested via web by Larry Kincaid ok to use kitchen an bar on tco
|
BLD-Other | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | CANC |
Dave Hannah
|
|
|
need fire life safety inspection Phone #: ###-#### Inspection requested via web by Larry Kincaid
|
FIRE-Final Inspection | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection for TCO phase 1 is complete.
|
Plan Reviewer's activity | | | 3/3/2020 | | DONE |
Joe Bruce
|
|
|
Recevied email from CDHD (Scott Paradis) regarding the approval of KIN restaurant. Upload email into documents. Okay to issue CO without health department signature on card. **JHB**
|
BLD-Ceiling Grid Inspection | 2/25/2020 | 2/26/2020 | 2/28/2020 | A | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PART |
Dave Hannah
|
|
|
Inspection requested via web by Larry Kincaid ok to cover kitchen area
|
CHANGE STATUS TO (ISS) | | | 2/6/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 1/24/2020 | | |
|
|
|
|
Plan assigned to (Joe) | 1/16/2020 | 1/16/2020 | 1/24/2020 | | PASS |
Joe Bruce
|
|
|
2nd plan mod KIN
|
Routing - PLAN CHECK | 1/17/2020 | | 1/24/2020 | | PASS |
Joe Bruce
|
|
|
Plan Mod Passed for modified exit/egress plan. JHB
|
Permit Ready to Issue | | | 1/24/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod 2 approved
|
BLD-Framing/Rough-in | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
Plan Modification Accepted | | | 1/16/2020 | | DONE |
|
|
|
Cathy Sewell of platform architects requested a plan mod workflow. Revise exiting requirements.
Sheets to be uploaded: G0.1, E2.2, E4.0
|
BLD-Ceiling Grid Inspection | 1/13/2020 | 1/13/2020 | 1/14/2020 | P | PART |
Dave Hannah
|
|
|
Larry Phone #: ###-#### cielings above entry doors
|
CHANGE STATUS TO (ISS) | | | 12/17/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 12/4/2019 | | |
|
|
|
|
Plan assigned to (Joe) | 11/5/2019 | 11/5/2019 | 12/4/2019 | | PASS |
Joe Bruce
|
|
|
(plan mod) KIN Restaurant
|
Plan resubmittals received | | | 12/4/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 12/4/2019 | | 12/4/2019 | | PASS |
Joe Bruce
|
|
|
Strucutural Calcs have been revised to show the proper live and dead loads.
|
Permit Ready to Issue | | | 12/4/2019 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Routing - FIRE | 11/25/2019 | 11/25/2019 | 11/29/2019 | | PASS |
Joe Bruce
|
|
|
Requirements of 2015 IFC 317 have been met for rooftop gardens and landscaped roofs.
|
Plan resubmittals requested | | | 11/29/2019 | | DONE |
Joe Bruce
|
|
|
Plan mod requires additional information for a resubmittal.
|
Routing - PLAN CHECK | 11/25/2019 | | 11/29/2019 | | FAIL |
Joe Bruce
|
|
|
See page 12 of the revised structural calculations for corrections required to the dead and live load calculations.
|
Routing - Design Review | 11/25/2019 | | 11/26/2019 | | PASS |
Katelyn Menuge
|
|
|
Redlined DR requirements.
|
Plan Modification Accepted | | | 11/5/2019 | | DONE |
|
|
|
Cathy Sewell from Platform Architecture requested to start a plan mod workflow. Install green roof system. Sheet A3.1
|
BLD-Framing/Rough-in | 10/27/2019 | 10/28/2019 | 10/28/2019 | A | PASS |
Mike Jordan
|
|
|
requesting framing inspection at new canopy Phone #: ###-#### Inspection requested via web by Larry Kincaid
|
BLD-Framing/Rough-in | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Dave Hannah
|
|
|
Inspection requested via web by Larry Kincaid
|
BLD-Foundation | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | PASS |
Dave Hannah
|
|
|
Pour is early in the morning. Please come as early as possible Inspection requested via web by Larry Kincaid
|
BLD-Foundation | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | CANC |
Dave Hannah
|
|
|
Please come later in the day if possible we are trying to get ready for a Monday am pour Thank you >> Inspection requested via web by Larry Kincaid Inspection cancelled from web by: Larry Kincaid
|
BLD-Footing | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Dave Hannah
|
|
|
Inspection requested via web by Larry Kincaid
|
Issue PAID IN FULL permit | | | 7/18/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/18/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/17/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/13/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 4/29/2019 | 4/29/2019 | 6/13/2019 | | PASS |
Joe Bruce
|
|
|
06/14 (2nd Rev) 05/23 (L3) Kin Restaurant, ePlan
|
Routing - PLAN CHECK | 6/10/2019 | | 6/13/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/13/2019 | | DONE |
|
|
|
All Met
Need
GC Form
Rev Valule
RP
|
Routing - PLUMBING | 6/10/2019 | | 6/10/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - Design Review | 6/10/2019 | | 6/10/2019 | | PASS |
Katelyn Menuge
|
|
|
Planter change is approved.
|
Plan resubmittals received | | | 6/7/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 5/23/2019 | 5/26/2019 | 5/24/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/23/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 5/23/2019 | | DONE |
Joe Bruce
|
|
|
emailed architect plan review report.
|
Routing - PLAN CHECK | 4/29/2019 | | 5/23/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - FIRE | 4/29/2019 | 4/29/2019 | 5/22/2019 | | PASS |
Mark Scharfen
|
|
|
Completed fire review and uploaded rev_fire 05.22.2019.pdf. Passed review.
|
Routing - MECHANICAL | 4/29/2019 | | 5/7/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 4/30/2019 | | 5/2/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - Erosion and Sediment | 5/2/2019 | | 5/2/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver approved, states that total commercial disturbance will be less than 10 cubic yards.
|
Routing - PLUMBING | 4/29/2019 | | 5/1/2019 | | PASS |
Daryl Spivey
|
|
|
See redline on G/I venting. Install per plan and ISPC.
|
Routing - Addressing | 4/29/2019 | | 4/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/29/2019 | | 4/30/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW FEES. NO ADDITION OF CUSTOMER SERVICE AREA.
|
Routing - Design Review | 4/29/2019 | | 4/30/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH19-00100
|
Routing Off Site - C.D.H | 4/29/2019 | | 4/30/2019 | | PASS |
Joe Bruce
|
|
|
CDHD pass.
|
Intake Approval | | | 4/26/2019 | | PASS |
|
|
|
|
Intake Approval | | | 4/19/2019 | | FAIL |
Julie Romig
|
|
|
Need Sheet A8.0 with door/hardware schedule and accessibility info.
|
Application received | | | 4/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 18 2019 7:07AM
|