BLD-Final | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Mike Jordan
|
|
|
Call half hour before to meet // Robere Phone #: ###-####
|
DOC - Permit Finaled | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Tell Riley
|
|
|
Robere Phone #: ###-####//talked with contractor onsite will add insulation in wall of garage where water lines are ran//
|
BLD-Framing/Rough-in | 7/23/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Tell Riley
|
|
|
Robere Phone #: ###-####//framing ok per plans//ok to insulate//trades rough ok// need trusses verified prior to pass on energy//
|
BLD-Wall Bracing | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Mike Jordan
|
|
|
shear panel nailing /// Robere Phone #: ###-####
|
Routing Walk-In (BLD) | 6/14/2019 | 6/14/2019 | 6/14/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/14/2019 | | 6/14/2019 | | PASS |
Josh Bogle
|
|
|
1hr. Plan Mod fee
|
Case Summary (BLD) | | | 6/14/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/14/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/14/2019 | | DONE |
|
|
|
plan mod accepted
|
BLD-Footing | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PASS |
Mike Jordan
|
|
|
Robere Phone #: ###-####
|
Routing Walk-In (BLD) | 6/6/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Josh Bogle
|
|
|
chatted about a potential floor framing change
|
Plan Modification Accepted | | | 6/6/2019 | | DONE |
|
|
|
Changing a beam
|
Issue PAID IN FULL permit | | | 4/25/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/24/2019 | | 4/24/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/24/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/24/2019 | | DONE |
|
|
|
|
Telephone call | | | 4/24/2019 | | DONE |
|
|
|
called Robere to informed him that permit is ready for pick up and the fees due
|
Routing Walk-In (Zoning) | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/23/2019 | | 4/23/2019 | | FAIL |
Josh Bogle
|
|
|
innadequate footings
|
1st review completed | | | 4/23/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 4/23/2019 | | | |
|
|
|
|