BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 2/14/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | FAIL |
Jim Storey
|
|
|
david Phone #: ###-#### c/n on site.
|
BLD-Final | 1/30/2020 | 1/31/2020 | 2/3/2020 | P | NR |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PART |
Jim Storey
|
|
|
David Phone #: ###-#### airseal and hanger ok //missing nailling and two locations bracing required.
|
BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | FAIL |
Jim Storey
|
|
|
David Phone #: ###-#### c/n on site/ truss engineering noted.
|
BLD-Conference | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####-PLEASE CALL DAVID SO HE CAN MEET YOU THERE THANKS mono pour at slab pannel wall ft ok
|
BLD-Foundation | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PASS |
Dave Hannah
|
|
|
Nathan Phone #: ###-####
|
BLD-Foundation | 9/9/2019 | 9/10/2019 | 9/10/2019 | A | CANC |
Jim Storey
|
|
|
THIS was resch on 9-9-19 for 9-11-19 -Nathan Phone #: ###-####
|
BLD-Footing | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
Telephone call | | | 7/17/2019 | | DONE |
|
|
|
David had given us the wrong number. Should be RCE-51757, not 51575. GC form now in documents
|
Telephone call | | | 7/16/2019 | | DONE |
|
|
|
Called and emailed David letting him know we need a 302 filled out by Rizcon for our files.
|
Telephone call | | | 7/8/2019 | | DONE |
|
|
|
Received email from David changing RCE to RCE-51575
|
Telephone call | | | 6/25/2019 | | DONE |
|
|
|
Called David Bowman again to request valid GC and an RP. The GC on the application is not valid.
|
Telephone call | | | 6/6/2019 | | DONE |
|
|
|
send an email informing building that we need GC and RP
|
Routing Walk-In (Zoning) | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 6/5/2019 | | DONE |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 6/5/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 6/5/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/9/2019 | | FAIL |
|
|
|
Please upload drawings in landscape orientation. Name files according to ePlan naming convention (https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf) See page 6
|
Application received | | | 5/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2019 7:26AM
|