Permit Information
Permit NumberBLD19-01628
StatusFinaled
Name CBH HOMES
Site Address 7748 E BRIAN AVE
Project NameLOT 03 BLK 02 FAREWELL BEND SU
Customer Number 
ePlanReviewYes
Description
***W.U.I. Valley Perimeter Lot; Class "A" Roof Required; Non-Combustible Construction*** Permit for the construction of a new 2332 sq. ft., two story (first story 1032 sq. ft., second story 1300 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 64 sq. ft. of covered patio/porch and a 481 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/12/201912/12/201912/12/2019PPASS
DetailsJim Storey
Garage code 2468 Inspection requested via web by Rob Ashworth
DOC - Permit Finaled12/12/201912/12/201912/12/2019PPASS
DetailsJim Storey
BLD-Blower Door Test Results12/12/201912/12/201912/12/2019PDONE
DetailsJim Storey
3.9
BLD-Conference12/12/201912/12/201912/12/2019PCANC
DetailsJim Storey
BLD-Energy code compliance10/23/201910/24/201910/24/2019PPASS
DetailsJim Storey
Inspection requested via web by Rob Ashworth
BLD-Framing/Rough-in10/17/201910/18/201910/18/2019AFAIL
DetailsJim Storey
Inspection requested via web by Rob Ashworth soffits covered w/o insp. 1/2 inch ply// missing floor truss hanger nailling at mlb stairs/ b-vent void combustable foam.
BLD-Framing/Rough-in10/16/201910/17/201910/17/2019PDEFR
DetailsJim Storey
Inspection requested via web by Rob Ashworth out of time resch to am.
BLD-Wall Bracing10/9/201910/9/201910/9/2019PPASS
DetailsBrandon Shaw
BLD-Foundation9/20/20199/23/20199/23/2019PPASS
DetailsJim Storey
Jerry Phone #: ###-####
BLD-Footing9/19/20199/20/20199/23/2019PPASS
DetailsJim Storey
Jerry Phone #: ###-####
Issue PAID IN FULL permit  8/12/2019 DONE
Inspection Record Card- Bld  8/12/2019 DONE
OVERRIDE  5/20/2019  
Plan assigned to (RDP)5/9/20195/9/20195/20/2019 DONE
DetailsRob Patrick
05/22 sfd L1 ePlan
Routing - PLAN CHECK5/9/2019 5/20/2019 PASS
DetailsRob Patrick
1st review completed  5/20/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  5/20/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  5/20/2019 DONE
Route to Impact Fee Review5/9/20195/12/20195/10/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL5/9/2019 5/10/2019 PASS
DetailsChad Schwendiman
Routing - PLANNING5/9/2019 5/9/2019 PASS
DetailsSue Cummings
Routing - Addressing5/9/2019 5/9/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/9/2019 5/9/2019 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  5/9/2019 DONE
Intake Approval  5/9/2019 PASS
Recd Pcfee & Taken To Pln CK  5/9/2019 DONE
Application received  5/8/2019 DONE
Application submitted via PDS Online on May 8 2019 3:50PM