BLD-Foundation | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 8/6/2020 | 8/7/2020 | 8/7/2020 | A | PASS |
Tony Young
|
|
|
Rod *screened* Phone #: ###-####// retaining wall footing SW corner
|
PubWorks Subgrade Approval | 8/7/2020 | 8/7/2020 | 8/7/2020 | | DONE |
Jason C. Taylor
|
|
|
***Retaining Walls SW Corner of House***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | PEND |
Tony Young
|
|
|
Rod *screened* Phone #: ###-####// needs soils approval
|
OVERRIDE | | | 8/5/2020 | | |
|
|
|
|
Plan assigned to (J_N) | 6/22/2020 | 6/22/2020 | 8/5/2020 | | DONE |
Jenny Nelson
|
|
|
1st complete 06/26 plan mod - failed planning
|
CHANGE STATUS TO (ISS) | | | 8/5/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/5/2020 | | DONE |
|
|
|
Plan Mod Do not Reissue Met
|
Routing - PLANNING | 8/4/2020 | | 8/4/2020 | | PASS |
Karla Nelson
|
|
|
PLA recorded, Planning Ok, new walls may require Hillside permits
|
Routing PW Grading-Hillside | 6/23/2020 | | 7/1/2020 | | PASS |
Jason C. Taylor
|
|
|
New front patio area approved per plans. Retaining wall in rear yard was not approved to cross property lines based on last plan modification. Resubmitals for wall and possibly a new CFH case will be requierd prior to approval of those walls. Jason Taylor ###-####
|
Routing - PLANNING | 6/23/2020 | | 6/30/2020 | | FAIL |
Karla Nelson
|
|
|
The proposed 4' wall is within the front setback the record of survey property line adjustment will need to be completed prior to approving this wall. The patio also appears to be higher than 1' in the front setback, and will also require the proposed property line adjustment.
|
Routing - PLAN CHECK | 6/23/2020 | | 6/29/2020 | | PASS |
Jenny Nelson
|
|
|
|
Plan Modification Accepted | | | 6/22/2020 | | DONE |
|
|
|
We are adding a retaining wall and patio on the front near the Entry, all exterior work.
|
Change Expiration Date Only | | | 2/18/2020 | | DONE |
|
|
|
permit was mistakenly re-issued on 9/24/19
|
BLD-Energy code compliance | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Jim Storey
|
|
|
Rod Phone #: ###-####
|
BLD-Framing/Rough-in | 2/4/2020 | 2/5/2020 | 2/5/2020 | A | PART |
Tony Young
|
|
|
Rod Phone #: ###-####// ok to insulate,, needs sprinklers passed
|
BLD-Wall Bracing | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PART |
Tony Young
|
|
|
Rod Phone #: ###-####,, exterior ok
|
BLD-Framing/Rough-in | 10/21/2019 | 10/22/2019 | 10/22/2019 | P | CANC |
Dave Hannah
|
|
|
ROD- Phone #: ###-####
|
BLD-Foundation | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PART |
Tony Young
|
|
|
Would like an early inspection if possible. Hoping to pour at 9 Phone #: ###-#### Inspection requested via web by Ben Sears.. house walls ok
|
CHANGE STATUS TO (ISS) | | | 9/24/2019 | | DONE |
|
|
|
plan mod
|
Change Expiration Date Only | | | 9/24/2019 | | DONE |
|
|
|
permit was mistakenly re-issued on 9/24/19
|
Inspection Record Card- Bld | | | 9/24/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/20/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 9/12/2019 | 9/12/2019 | 9/20/2019 | | DONE |
Jenny Nelson
|
|
|
09/18 plan mod, waiting for hillside
|
Routing PW Grading-Hillside | 9/12/2019 | | 9/20/2019 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD APPROVED A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Permit Ready to Issue | | | 9/20/2019 | | DONE |
|
|
|
plan mod approved
DO NOT RE ISSUE
|
BLD-Footing | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, work in progress on the house footings,, ok
|
Routing - PLAN CHECK | 9/17/2019 | | 9/17/2019 | | PASS |
Jenny Nelson
|
|
|
1 hour plan mod fee
|
PubWorks Subgrade Approval | 9/13/2019 | 9/13/2019 | 9/13/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Plan Modification Accepted | | | 9/12/2019 | | |
|
|
|
Per Cory from Pivot North. plan mod for grading. Sheet L1.1
|
BLD-Foundation | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears,, basement and retaining walls,, work in progress
|
BLD-Footing | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PART |
Tony Young
|
|
|
Request early inspection. Would like to pour about 9:30 or 10:00 Please call me to let me know if this can be arranged Phone #: ###-#### Inspection requested via web by Ben Sears,, 1st set of retaining wall footings and basement
|
PubWorks Subgrade Approval | 8/14/2019 | 8/14/2019 | 8/14/2019 | | DONE |
Melissa Jannusch
|
|
|
**BASEMENT Footings** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 7/22/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 6/7/2019 | 6/7/2019 | 7/22/2019 | | DONE |
Jenny Nelson
|
|
|
06/26 sfd L2 ePlan. 2nd, waiting for planning and hillside. 1st complete, foam report, basement dampproofing, code year, wui venting
|
Issue PAID IN FULL permit | | | 7/22/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 7/22/2019 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 7/22/2019 | | DONE |
|
|
|
permit was mistakenly re-issued on 9/24/19
|
Routing PW Grading-Hillside | 7/19/2019 | | 7/19/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing PW Grading-Hillside | 7/10/2019 | | 7/10/2019 | | FAIL |
Melissa Jannusch
|
|
|
Site suitability letter
|
Routing - PLANNING | 7/5/2019 | | 7/8/2019 | | PASS |
Karla Nelson
|
|
|
Looks to meet code. Walls cannot exceed 3' in 20' front yard setback or 6' in side yard setback.
|
Routing - PLAN CHECK | 7/5/2019 | | 7/5/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 7/2/2019 | | 7/2/2019 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 6/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 6/7/2019 | | 6/26/2019 | | FAIL |
Jenny Nelson
|
|
|
Foam report, update code year, basement dampproofing, wui venting
|
Routing PW Grading-Hillside | 6/10/2019 | | 6/17/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - PLANNING | 6/7/2019 | | 6/13/2019 | | FAIL |
Karla Nelson
|
|
|
Corrections required. Walls exceed 3' in the 20' front yard setback.
|
Route to Impact Fee Review | 6/7/2019 | 6/10/2019 | 6/11/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/7/2019 | | 6/11/2019 | | FAIL |
Troy James
|
|
|
Emailed applicant missing manual j report.
|
Routing - FIRE | 6/7/2019 | 6/7/2019 | 6/10/2019 | | PASS |
Lee G Meredith
|
|
|
06/21-3484 N Winsome Road ePlan Res 404.
Sprinkler system is being provided, as noted on the site plan.
|
Routing - Addressing | 6/7/2019 | | 6/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/7/2019 | | 6/10/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/7/2019 | | 6/10/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required. RP must be on site with authority to make any changes needed.
|
Plans ACCEPTED BY PLAN TECH | | | 6/7/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/7/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/7/2019 | | DONE |
|
|
|
|
Application received | | | 6/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 6 2019 9:04AM
|