Telephone call | | | 10/15/2019 | | DONE |
|
|
|
spoke with Jared from Wright Bro- the pluming value was a mistake because a toilet was moved for the flooring to be install and water heater check and per Dan Ediger no permit is require.
|
Print Statement | | | 10/15/2019 | | DONE |
|
|
|
|
Second Notice | | 8/15/2019 | 9/20/2019 | | DONE |
|
|
|
mailed 9-23-19
|
First Notice | | 8/12/2019 | 8/5/2019 | | DONE |
|
|
|
mailed 8-6-19
|
BLD-Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Dave Hannah
|
|
|
Cory Phone #: ###-####
|
Print Occupancy Form | | | 8/2/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/2/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Cory Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Dave Hannah
|
|
|
Cory Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2019 | 7/15/2019 | 7/15/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Cory Overlin ok to cover shearwall
|
BLD-Framing/Rough-in | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Cory Overlin
|
Issue PAID IN FULL permit | | | 7/1/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/28/2019 | | 6/28/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
MET AMOORE@WBTBC.COM
Need
GC Form
Revised Value
|
Plan assigned to (M_H) | 6/20/2019 | | 6/28/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 06/25 #518 L1 ePlan - AT&T Store
|
Route to Impact Fee Review | 6/21/2019 | 6/24/2019 | 6/24/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 6/24/2019 | | 6/24/2019 | | FAIL |
Michael Hanson
|
|
|
Original sheet set must be revised and resubmitted. Sketches without titleblock or stamped are not acceptable.
|
1st review completed | | | 6/21/2019 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 6/20/2019 | | 6/21/2019 | | FAIL |
Michael Hanson
|
|
|
See changemark in ePlan for corrections required.
|
Routing - Addressing | 6/20/2019 | | 6/21/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2019 | | 6/20/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING-NO NEW FEES
|
Intake Approval | | | 6/19/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 6/17/2019 | | FAIL |
Michael Hanson
|
|
|
Please separately upload each drawing sheet. Each drawings sheet must not only be stamped but signed and dated as well. Provide required city stamp area in the bottom right corner of each drawing sheet.
|
Intake Approval | | | 6/17/2019 | | FAIL |
Michael Hanson
|
|
|
Please provide the required city stamp area in the bottom right corner of each drawing sheet. For specifics please refer to the drawings upload standards at cityofboise.org.
|
Application received | | | 6/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 12 2019 10:32AM
|