Permit Information
Permit NumberBLD19-02184
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 135 S BROADWAY AVE
Project NameAT&T Broadway Store TI
Customer Number 
ePlanReviewYes
Description
(AT&T BROADWAY) This building is fully fire sprinkled. Permit to remodel an existing 1,549 sqft tenant space. Work to include: Demo of non-bearing interior walls and drinking fountain, construct new interior walls to create an enlarged accessible restroom / office / hallway, electrical work, mechanical work. Approval is contingent on adhering to the approved plans. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire Department. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  10/15/2019 DONE
spoke with Jared from Wright Bro- the pluming value was a mistake because a toilet was moved for the flooring to be install and water heater check and per Dan Ediger no permit is require.
Print Statement  10/15/2019 DONE
Second Notice 8/15/20199/20/2019 DONE
mailed 9-23-19
First Notice 8/12/20198/5/2019 DONE
mailed 8-6-19
BLD-Final8/1/20198/2/20198/2/2019APASS
DetailsDave Hannah
Cory Phone #: ###-####
Print Occupancy Form  8/2/2019 DONE
Permanent Occupancy  8/2/2019 DONE
FIRE-Final Inspection7/31/20198/1/20198/1/2019APASS
DetailsTroy Cobbley
Life safety passed.

Cory Phone #: ###-####
BLD-Ceiling Grid Inspection7/31/20197/31/20197/31/2019PPASS
DetailsDave Hannah
Cory Phone #: ###-####
BLD-Framing/Rough-in7/13/20197/15/20197/15/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Cory Overlin ok to cover shearwall
BLD-Framing/Rough-in7/10/20197/11/20197/11/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Cory Overlin
Issue PAID IN FULL permit  7/1/2019 DONE
Inspection Record Card- Bld  7/1/2019 DONE
Routing - PLAN CHECK6/28/2019 6/28/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/28/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/28/2019 DONE
MET AMOORE@WBTBC.COM
Need
GC Form
Revised Value
Plan assigned to (M_H)6/20/2019 6/28/2019 DONE
DetailsMichael Hanson
1st review completed - 06/25 #518 L1 ePlan - AT&T Store
Route to Impact Fee Review6/21/20196/24/20196/24/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK6/24/2019 6/24/2019 FAIL
DetailsMichael Hanson
Original sheet set must be revised and resubmitted. Sketches without titleblock or stamped are not acceptable.
1st review completed  6/21/2019 DONE
DetailsMichael Hanson
Routing - PLAN CHECK6/20/2019 6/21/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan for corrections required.
Routing - Addressing6/20/2019 6/21/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/20/2019 6/20/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING-NO NEW FEES
Intake Approval  6/19/2019 PASS
DetailsJavier Guzman
Intake Approval  6/17/2019 FAIL
DetailsMichael Hanson
Please separately upload each drawing sheet. Each drawings sheet must not only be stamped but signed and dated as well. Provide required city stamp area in the bottom right corner of each drawing sheet.
Intake Approval  6/17/2019 FAIL
DetailsMichael Hanson
Please provide the required city stamp area in the bottom right corner of each drawing sheet. For specifics please refer to the drawings upload standards at cityofboise.org.
Application received  6/12/2019 DONE
Application submitted via PDS Online on Jun 12 2019 10:32AM