BLD-Aging Inspection | 7/24/2020 | 7/24/2020 | 7/30/2020 | | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | NH |
Jim Storey
|
|
|
Mike Phone #: ###-#### voice mail full no access
|
Routing - MECHANICAL | 3/2/2020 | | 3/2/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Framing/Rough-in | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | CANC |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 1/29/2020 | 1/30/2020 | 1/30/2020 | P | PART |
Jim Storey
|
|
|
Call 15 mins ahead- Mike Phone #: ###-#### need hvac/ ok to insulate upon hvac aproval.
|
BLD-Wall Bracing | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PASS |
Dave Hannah
|
|
|
shear // Mike Phone #: ###-####
|
BLD-Foundation | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Jim Storey
|
|
|
mike Phone #: ###-####
|
BLD-Footing | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### pad ft ok on exsting house
|
OVERRIDE | | | 9/26/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | DONE |
Josh Bogle
|
|
|
plan mod for foundation and footings. not sure if zoning needs to see it.
|
Plan assigned to (JAB) Josh | 9/26/2019 | 9/26/2019 | 9/26/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/26/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/26/2019 | | DONE |
|
|
|
plan mod for foundation and footings. not sure if zoning needs to see it.
|
CHANGE STATUS TO (ISS) | | | 9/26/2019 | | DONE |
|
|
|
no plan mod fee per JOsh
|
Routing Walk-In (BLD) | 9/23/2019 | 9/23/2019 | 9/23/2019 | A | PASS |
Brian McGowan
|
|
|
Is proposing changes to plan-needs to resubmit foundation plan, footing and ponit load footings for girder trusses to be specified.
Wall section showing icf forms for new stem wall.
|
OVERRIDE | | | 9/9/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/8/2019 | 7/8/2019 | 9/9/2019 | | PASS |
Josh Bogle
|
|
|
07/12 addition, paper - 1st done - waitng on Man J
|
Routing - PLAN CHECK | 9/9/2019 | | 9/9/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/9/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/9/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 9/9/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/9/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/6/2019 | 9/6/2019 | 9/6/2019 | A | FAIL |
Josh Bogle
|
|
|
trying to sort out Manual J
|
Routing - MECHANICAL | 9/6/2019 | | 9/6/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 7/25/2019 | | 7/25/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to TML
|
Plan resubmittals received | | | 7/24/2019 | | DONE |
|
|
|
two copies of manual j's taken to josh
|
Routing Walk-In (BLD) | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | FAIL |
Josh Bogle
|
|
|
waiting for a Manual J
|
Routing - PLAN CHECK | 7/9/2019 | | 7/9/2019 | | FAIL |
Josh Bogle
|
|
|
plans look pretty good - girder truss? manual J? applicant's voice mail is full
|
Routing Walk-In (Zoning) | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/21/2019 | | 6/21/2019 | | PASS |
Josh Bogle
|
|
|
needs building plans
|
1st review completed | | | 6/21/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 6/21/2019 | | | |
|
|
|
|
Routing - PLAN CHECK | 7/25/2019 | | | | |
Josh Bogle
|
|
|
|