Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD19-02360
StatusIssued
Name MAGALSKY MICHAEL
Site Address 2918 E EASTGATE DR
Project NameMagalsky Addition
Customer Number 
ePlanReviewNo
Description
HILLSIDE - Permit for a 1,045sq' addtion that expands the Kitchen & adds a Master Suite. Building 520sq' of new deck as well as a rebuild of the existing deck is part of this project. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (ISS)  4/8/2020 DONE
Waiting for MEC final to pass. Per Brandon S
BLD-Final4/6/20204/7/20204/7/2020APASS
DetailsBrandon Shaw
REMOTELEY INSP- Mike Phone #: ###-####
DOC - Permit Finaled4/7/20204/7/20204/7/2020PPASS
DetailsBrandon Shaw
CHANGE STATUS TO (ISS)  4/6/2020 DONE
per brandon should not be closed
BLD-Conference3/13/20203/13/20203/13/2020PDONE
DetailsBrandon Shaw
call for access- Michael Phone #: ###-####
DOC - Permit Finaled3/13/20203/13/20203/13/2020PPASS
DetailsBrandon Shaw
BLD-Energy code compliance2/13/20202/14/20202/14/2020APASS
DetailsBrandon Shaw
Jim Phone #: ###-####
BLD-Framing/Rough-in2/11/20202/12/20202/12/2020APASS
DetailsBrandon Shaw
Jim Phone #: ###-####
BLD-Framing/Rough-in1/21/20201/22/20201/22/2020PPART
DetailsBrandon Shaw
Kitchen area only...
BLD-Conference12/18/201912/19/201912/19/2019PDONE
DetailsBrandon Shaw
Mike Phone #: ###-####
BLD-Wall Bracing11/15/201911/18/201911/18/2019APASS
DetailsBrandon Shaw
shear // Dale Phone #: ###-####
BLD-Foundation10/25/201910/28/201910/28/2019ADONE
DetailsDave Hannah
as early as possible // Jim Phone #: ###-####
BLD-Foundation10/24/201910/25/201910/25/2019PDEFR
DetailsJim Storey
as early as possible // Jim Phone #: ###-####//out of time
PubWorks Subgrade Approval10/22/201910/22/201910/22/2019 DONE
DetailsMelissa Jannusch
SONOTUBES *A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Footing10/17/201910/18/201910/18/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval10/4/201910/4/201910/4/2019 DONE
DetailsMelissa Jannusch
*FOOTINGS* DOES NOT INCLUDE SONOTUBES! A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  8/27/2019  
Issue PAID IN FULL permit  8/27/2019 DONE
Permit Ready to Issue  8/27/2019 DONE
Routing Walk-In (BLD)8/26/20198/26/20198/26/2019ADONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh7/2/20197/2/20198/26/2019 PASS
DetailsJosh Bogle
07/08 additon, paper - 1st done
PLANS/APPL TAKEN TO FRONT DESK  8/26/2019 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Routing - PLAN CHECK8/26/2019 8/26/2019 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  8/26/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  8/26/2019 DONE
DetailsJosh Bogle
Routing - PLAN CHECK8/23/2019 8/23/2019 FAIL
DetailsJosh Bogle
Plan resubmittals received  8/22/2019 DONE
3 brand new copies of plans. Engineering for deck, truss calcs for existing trusses
Routing - PLAN CHECK8/15/2019 8/15/2019 FAIL
DetailsJosh Bogle
Routing - PLANNING8/13/2019 8/13/2019 PASS
DetailsNicolette Womack
Stairs within side yard setback are allowed as only 1' above grade.
Routing - PUBLIC WORKS7/2/2019 8/7/2019 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside8/6/2019 8/6/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Plan resubmittals received  7/18/2019 DONE
3 large plan on drainage, copies of planning and development approval letters, 2 copies of Geotechnical Inv- given to Plan Reviewer- Josh
1st review completed  7/18/2019 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK7/17/2019 7/18/2019 FAIL
DetailsJosh Bogle
see e-mail to Mike
Routing - Erosion and Sediment7/15/2019 7/17/2019 PASS
DetailsAndy J. Long
ESC plan approved. Certified stormwater team. Site preparation inspection is required.
Routing - PLANNING  7/15/2019 FAIL
DetailsNicolette Womack
Need Fullsize grading and drainage plan per MMJ.
Routing PW Grading-Hillside7/5/2019 7/8/2019 FAIL
DetailsMelissa Jannusch
See e-mail to applicant 7-8-2019
Routing - Addressing7/3/2019 7/3/2019 PASS
DetailsDoug Chausow
Intake Approval  7/2/2019 PASS
Recd Pcfee & Taken To Pln CK  7/2/2019 DONE
no fees paid at intake
Application received 6/25/2019