Permit Information
Permit NumberBLD19-02824
StatusFinaled
Name INNOVATIVE BUILDING AND REMODELING
Site Address 5514 W LAKE RIVER LN
Project NameDonovan Deck
Customer Number 
ePlanReviewNo
Description
Permit to build a 1,300sq' 2nd level deck. All work per plans, notations, attachments, local codes & ordinances. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/18/201910/18/201910/18/2019PPASS
DetailsBrandon Shaw
Finalize deck structure. Electrician is finalled. Thanks Phone #: ###-#### Inspection requested via web by Dustin Collins
DOC - Permit Finaled10/18/201910/18/201910/18/2019PPASS
DetailsBrandon Shaw
BLD-Framing/Rough-in9/5/20199/6/20199/6/2019PPASS
DetailsTony Young
Jace Phone #: ###-####
BLD-Energy code compliance8/22/20198/26/20198/26/2019APASS
DetailsTony Young
Please call 15 minutes before inspection so that our project manager can be on site.
Gate code #1937 Phone #: ###-#### Inspection requested via web by Dustin Collins// insulation under deck area over living space
BLD-Foundation8/6/20198/7/20198/7/2019PPART
DetailsTony Young
We will be formed and ready for our sono tubes and stem wall inspection in the afternoon. Gate code #1937. Thanks Phone #: ###-#### Inspection requested via web by Dustin Collins//
work in progress
BLD-Foundation8/6/20198/7/20198/6/2019ACANC
DetailsTony Young
Stem wall inspection prior to pouring walls. These have #4 bar and are formed up and ready. Thanks, Dustin
Gate Code #1937 Phone #: ###-#### >> Inspection requested via web by Dustin Collins Inspection cancelled from web by: Dustin Collins
BLD-Footing8/4/20198/5/20198/5/2019PPART
DetailsTony Young
Please call prior to arrival so we can be present. There is a gate code #1937 to enter the community. Thanks, Dustin Phone #: ###-#### Inspection requested via web by Dustin Collins// work in progress
Routing Walk-In (BLD)8/1/20198/1/20198/1/2019ADONE
DetailsJosh Bogle
Submitting additional paper work that was requested
Routing - PLAN CHECK8/1/2019 8/1/2019 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  8/1/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  8/1/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/1/2019 DONE
DetailsJosh Bogle
ESC no - Energy yes
Permit Ready to Issue  8/1/2019 DONE
Issue PAID IN FULL permit  8/1/2019 DONE
Routing Walk-In (BLD)7/31/20197/31/20197/31/2019PFAIL
DetailsJosh Bogle
still talking
Routing Walk-In (BLD)7/31/20197/31/20197/31/2019PFAIL
DetailsJosh Bogle
Routing - PLAN CHECK7/31/2019 7/31/2019 FAIL
DetailsJosh Bogle
see e-mail to Dustin
Plan resubmittals received  7/30/2019 DONE
Adjust width of shear wall, added insulation details, provided engineering
Routing Walk-In (Zoning)7/26/20197/26/20197/26/2019ADONE
DetailsSue Cummings
Routing Walk-In (BLD)7/26/20197/26/20197/26/2019AFAIL
DetailsJosh Bogle
Routing - PLAN CHECK7/26/2019 7/26/2019 FAIL
DetailsJosh Bogle
1st review completed  7/26/2019 FAIL
DetailsJosh Bogle
Application received 7/26/2019