DOC - Permit Finaled | | | 9/10/2019 | | DONE |
|
|
|
|
BLD-Final | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
FIRE-Final Inspection | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
Plan assigned to (BJM) | 7/31/2019 | 7/31/2019 | 8/12/2019 | | DONE |
Brian McGowan
|
|
|
08/06- NEED ADDRESSING TO SIGN OFF- L1 Lombard Conrad Architects eplan
|
1st review completed | | | 8/12/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/12/2019 | | DONE |
|
|
|
Need
GC Form
Revised Cert of Value
|
Inspection Record Card- Bld | | | 8/12/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/12/2019 | | DONE |
|
|
|
|
Routing - Addressing | 7/31/2019 | | 8/12/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLAN CHECK | 7/31/2019 | | 8/9/2019 | | PASS |
Brian McGowan
|
|
|
|
Routing - PUBLIC WORKS | 7/31/2019 | | 8/1/2019 | | PASS |
Angela Hardy
|
|
|
|
Plan assigned to (BJM) | 7/31/2019 | 7/31/2019 | 7/31/2019 | | DEFR |
Brian Murphy
|
|
|
L1 Lombard Conrad Architects eplan
|
Intake Approval | | | 7/31/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 7/30/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Reserve the bottom right corner for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on the cover sheet
|
Application received | | | 7/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 29 2019 1:58PM
|