Permit Information
Permit NumberBLD19-03121
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 6095 E FOXGROVE DR
Project NameLot 11 Block 2 Harris North #3
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **W.U.I. HILLSIDE ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3395 sq. ft., two story (first story 1894 sq. ft., second story 1501 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 488 sq. ft. of covered patio/porch and a 846 sq. ft. attached. JJN ***SPRINKLERS ARE NOT REQUIRED***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20204/9/20204/9/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled4/9/20204/9/20204/9/2020PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval4/9/20204/9/20204/9/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Photos of the landscaping and a video of the drainage connection have been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final4/8/20204/8/20204/8/2020ANR
DetailsBrandon Shaw
BLD-Final4/7/20204/8/20204/8/2020APASS
DetailsBrandon Shaw
Work in progress...
BLD-Other1/3/20201/6/20201/6/2020APASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other1/3/20201/6/20201/6/2020ACANC
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance1/3/20201/3/20201/3/2020PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Energy code compliance12/31/201912/31/201912/31/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Kyle Seick. Noted that denoted hardware on sheet S1.1 has not yet been installed.
BLD-Framing/Rough-in12/24/201912/27/201912/27/2019AFAIL
DetailsBrandon Shaw
Provide Truss Engineering...
See pg S1.1 for missing hardware...
OK to insulate...
BLD-Wall Bracing12/2/201912/2/201912/2/2019PFAIL
DetailsBrandon Shaw
Renail 2nd floor shear panels, see red crayon...
BLD-Foundation10/9/201910/9/201910/9/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing10/7/201910/7/201910/7/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval10/4/201910/4/201910/4/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  9/26/2019 DONE
Inspection Record Card- Bld  9/26/2019 DONE
OVERRIDE  9/13/2019  
Plan assigned to (J_N)8/19/20198/19/20199/13/2019 DONE
DetailsJenny Nelson
09/05 sfd L2 ePlan. 1st review complete 8/23, failed hillside
PLANS/APPL TAKEN TO FRONT DESK  9/13/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  9/13/2019 DONE
met
Routing PW Grading-Hillside9/11/2019 9/11/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing PW Grading-Hillside8/21/2019 8/23/2019 FAIL
DetailsMelissa Jannusch
plan modification to be submitted moving wall to lower lot or removing wall.
1st review completed  8/23/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK8/19/2019 8/23/2019 PASS
DetailsJenny Nelson
Routing - FIRE8/19/20198/19/20198/21/2019 PASS
DetailsLee G Meredith
08/30-6094 E FoxGrove Dr. 404 LGM

Sprinklers are not required.
Routing - PUBLIC WORKS8/19/2019 8/21/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment8/19/2019 8/21/2019 PASS
DetailsMichael Zawacki
Route to Impact Fee Review8/19/20198/22/20198/20/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL8/19/2019 8/20/2019 PASS
DetailsChad Schwendiman
Routing - Addressing8/19/2019 8/20/2019 PASS
DetailsLaura Hunter
Intake Approval  8/19/2019 PASS
Recd Pcfee & Taken To Pln CK  8/19/2019 DONE
Routing - PLANNING8/19/2019 8/19/2019 PASS
DetailsSue Cummings
Application received  8/15/2019 DONE
Application submitted via PDS Online on Aug 15 2019 11:09AM