BLD-Footing | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Brandon Shaw
|
|
|
Aaron Phone #: ###-####
|
BLD-Footing | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | CANC |
Brandon Shaw
|
|
|
Piers/footings for the deck with the new concrete contractor. Phone number is for the new contractor. I will be out of town. Thanks! Phone #: ###-#### Inspection requested via web by Michael Arnold
|
BLD-Foundation | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Barn has been moved onto stemwall. Now the slab is ready to be poured along with the deck post footings. Phone #: ###-#### Inspection requested via web by Michael Arnold
|
BLD-Footing | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | FAIL |
Brandon Shaw
|
|
|
No plans or permit on site...
|
OVERRIDE | | | 10/4/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLANNING | 10/4/2019 | | 10/4/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 10/4/2019 | | 10/4/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 10/4/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/4/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/23/2019 | | 9/23/2019 | | FAIL |
Brian McGowan
|
|
|
Is updating plans to show engineering. Needed foundation plan, structure sheets and building section on min. 18"x24" sheets.
No section showing exterior deck was provided or structure for it.
|
Routing Walk-In (Zoning) | 8/28/2019 | 8/28/2019 | 8/28/2019 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/28/2019 | 8/28/2019 | 8/28/2019 | A | FAIL |
Rob Patrick
|
|
|
needs to have more details of foundation and update dwgs to remove work not being done.
|
Routing Walk-In (BLD) | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 8/28/2019 | | 8/28/2019 | | FAIL |
Rob Patrick
|
|
|
|
1st review completed | | | 8/28/2019 | | FAIL |
Rob Patrick
|
|
|
|
Application received | | 8/28/2019 | | | |
|
|
|
|