BLD-Aging Inspection | 6/23/2020 | 6/23/2020 | 6/23/2020 | | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Jim Storey
|
|
|
Dominic Phone #: ###-####
|
BLD-Framing/Rough-in | 2/10/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Jim Storey
|
|
|
Diminic Phone #: ###-####
|
BLD-Conference | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Jim Storey
|
|
|
Call for access- Dominic Phone #: ###-####
|
BLD-Conference | 12/17/2019 | 12/20/2019 | 12/20/2019 | P | DONE |
Tell Riley
|
|
|
Dominic Phone #: ###-####//framing and connection questions//some will need to be approved or designed by engineer for I beam//
|
Meeting | | | 12/17/2019 | | DONE |
|
|
|
Bradley Built LLC were originally on permit (RCE-38822). Homeowner took over permit
|
(F) Reprint permit | | | 12/17/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PART |
Jim Storey
|
|
|
Justin Phone #: ###-#### exterior nailling ok
|
BLD-Concrete | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Jim Storey
|
|
|
stem wall- Justin Phone #: ###-####
|
BLD-Footing | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
OVERRIDE | | | 9/26/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/26/2019 | 9/26/2019 | 9/26/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/26/2019 | | 9/26/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 9/26/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/26/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 9/5/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 9/5/2019 | 9/5/2019 | 9/5/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/5/2019 | | 9/5/2019 | | FAIL |
Josh Bogle
|
|
|
handed out the handy-dandy checklist
|
1st review completed | | | 9/5/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 9/5/2019 | | | |
|
|
|
|