Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD19-03439
StatusIssued
Name BROWN DOMINIC
Site Address 2513 S HAYDEN WAY
Project NameBrown Addition
Customer Number 
ePlanReviewNo
Description
Permit for an addition that adds 168sq' of garage and 570sq' of living space. New Living space includes a Master Suite, a 1/2 bath, and expands the Kitchen. Half of the roof framing is being rebuilt as part of this project and bearing locations below are being altered. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/23/20206/23/20206/23/2020 PASS
DetailsJim Storey
BLD-Conference3/16/20203/16/20203/16/2020PPASS
DetailsJim Storey
Dominic Phone #: ###-####
BLD-Framing/Rough-in2/10/20202/10/20202/10/2020PPASS
DetailsJim Storey
Diminic Phone #: ###-####
BLD-Conference1/29/20201/29/20201/29/2020PPASS
DetailsJim Storey
Call for access- Dominic Phone #: ###-####
BLD-Conference12/17/201912/20/201912/20/2019PDONE
DetailsTell Riley
Dominic Phone #: ###-####//framing and connection questions//some will need to be approved or designed by engineer for I beam//
Meeting  12/17/2019 DONE
Bradley Built LLC were originally on permit (RCE-38822). Homeowner took over permit
(F) Reprint permit  12/17/2019 DONE
BLD-Framing/Rough-in12/5/201912/6/201912/6/2019APART
DetailsJim Storey
Justin Phone #: ###-#### exterior nailling ok
BLD-Concrete10/1/201910/2/201910/2/2019APASS
DetailsJim Storey
stem wall- Justin Phone #: ###-####
BLD-Footing9/26/20199/27/20199/27/2019APASS
DetailsBrandon Shaw
Work in progress...
OVERRIDE  9/26/2019  
Routing Walk-In (BLD)9/26/20199/26/20199/26/2019ADONE
DetailsJosh Bogle
Routing - PLAN CHECK9/26/2019 9/26/2019 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  9/26/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  9/26/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/26/2019 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  9/26/2019 DONE
Issue PAID IN FULL permit  9/26/2019 DONE
Routing Walk-In (BLD)9/24/20199/24/20199/24/2019PFAIL
DetailsJosh Bogle
Routing Walk-In (BLD)9/10/20199/10/20199/10/2019PFAIL
DetailsJosh Bogle
Routing Walk-In (Zoning)9/5/20199/5/20199/5/2019APASS
DetailsJeff Lowe
Routing Walk-In (BLD)9/5/20199/5/20199/5/2019AFAIL
DetailsJosh Bogle
Routing - PLAN CHECK9/5/2019 9/5/2019 FAIL
DetailsJosh Bogle
handed out the handy-dandy checklist
1st review completed  9/5/2019 FAIL
DetailsJosh Bogle
Application received 9/5/2019