BLD-Final | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PASS |
Brandon Shaw
|
|
|
Gabe Phone #: ###-####
|
DOC - Permit Finaled | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | NR |
Tell Riley
|
|
|
Shane Phone #: ###-####//need mechanical permits finaled prior to final building inspection//talked with Shane, and asked he reschedule when complete//
|
BLD-Framing/Rough-in | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Joe Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/13/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 12/12/2019 | | |
|
|
|
|
BLD-Wall cover | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Framing and enegy...
|
Routing Walk-In (BLD) | 12/11/2019 | 12/11/2019 | 12/12/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/12/2019 | | 12/12/2019 | | PASS |
Josh Bogle
|
|
|
patio cover - fees per added value
|
Case Summary (BLD) | | | 12/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/12/2019 | | DONE |
|
|
|
DO NOT ISSUE -plan mod
|
Telephone call | | | 12/12/2019 | | DONE |
|
|
|
Called Joe to let him know his permit is ready
|
Routing Walk-In (Zoning) | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | FAIL |
Josh Bogle
|
|
|
make sure have all info for plan mod - didn't have site plan or engineering calcs
|
BLD-Wall Bracing | 11/27/2019 | 11/29/2019 | 11/29/2019 | A | PASS |
Brandon Shaw
|
|
|
shear // Shane Phone #: ###-####
|
BLD-Foundation | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
Routing Walk-In (BLD) | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Josh Bogle
|
|
|
discussed a potential Plan Modification
|
CHANGE STATUS TO (ISS) | | | 11/8/2019 | | DONE |
|
|
|
per josh just questions about plan mod. customer was not ready to start one
|
Plan Modification Accepted | | | 11/8/2019 | | DONE |
|
|
|
patio cover
|
BLD-Foundation | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Brandon Shaw
|
|
|
rebar // Shane Phone #: ###-####
|
BLD-Footing | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | CANC |
Brandon Shaw
|
|
|
JOSH- PLEASE GO LATE MORNING Phone #: ###-####
|
Routing Walk-In (Zoning) | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Ethan Mansfield
|
|
|
move structure 4 feet toward rear of lot. meets setbacks per plan.
|
Routing Walk-In (BLD) | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Josh Bogle
|
|
|
no structural change
|
Plan Modification Accepted | | | 10/17/2019 | | DONE |
|
|
|
Placing shop in another spot on the parcel
|
OVERRIDE | | | 9/17/2019 | | |
|
|
|
|
Telephone call | | | 9/17/2019 | | DONE |
|
|
|
called Joe to let know permit is ready and how much is owed-left message- left message on Joes phone
|
Issue PAID IN FULL permit | | | 9/17/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/17/2019 | | DONE |
|
|
|
Need RP
|
Routing Walk-In (Zoning) | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Josh Bogle
|
|
|
no contact with applicant
|
Routing Walk-In (Zoning) | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Ethan Mansfield
|
|
|
Plat Notes indicate funky setbacks noted on site plan.
|
Routing Walk-In (BLD) | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/16/2019 | | 9/16/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 9/16/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/16/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Application received | | 9/16/2019 | | | |
|
|
|
|