Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD19-03644
StatusFinaled
Name LEVCO BUILDERS LLC
Site Address 165 E PARKWAY DR
Project NameGilchrist Shop
Customer Number 
ePlanReviewNo
Description
MODIFICATION - ADDING A288SQ' PATIO COVER WITH 30" FOOTINGS AND 6X6 POSTS. 12-12-19 **jab** Permit for a 748sq' attached RV garage. All work per plans, engineering, local codes & ordinances. Separate electrical & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/24/20201/27/20201/27/2020APASS
DetailsBrandon Shaw
Gabe Phone #: ###-####
DOC - Permit Finaled1/27/20201/27/20201/27/2020PPASS
DetailsBrandon Shaw
BLD-Final1/9/20201/9/20201/9/2020PNR
DetailsTell Riley
Shane Phone #: ###-####//need mechanical permits finaled prior to final building inspection//talked with Shane, and asked he reschedule when complete//
BLD-Framing/Rough-in12/13/201912/16/201912/16/2019APASS
DetailsBrandon Shaw
Joe Phone #: ###-####
CHANGE STATUS TO (ISS)  12/13/2019 DONE
OVERRIDE  12/12/2019  
BLD-Wall cover12/11/201912/12/201912/12/2019APASS
DetailsBrandon Shaw
Framing and enegy...
Routing Walk-In (BLD)12/11/201912/11/201912/12/2019PDONE
DetailsJosh Bogle
Routing - PLAN CHECK12/12/2019 12/12/2019 PASS
DetailsJosh Bogle
patio cover - fees per added value
Case Summary (BLD)  12/12/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  12/12/2019 DONE
DO NOT ISSUE -plan mod
Telephone call  12/12/2019 DONE
Called Joe to let him know his permit is ready
Routing Walk-In (Zoning)12/11/201912/11/201912/11/2019PPASS
DetailsSue Cummings
Routing Walk-In (BLD)12/9/201912/9/201912/9/2019PFAIL
DetailsJosh Bogle
make sure have all info for plan mod - didn't have site plan or engineering calcs
BLD-Wall Bracing11/27/201911/29/201911/29/2019APASS
DetailsBrandon Shaw
shear // Shane Phone #: ###-####
BLD-Foundation11/12/201911/12/201911/12/2019PPASS
DetailsBrandon Shaw
Work in progress...
Routing Walk-In (BLD)11/8/201911/8/201911/8/2019PPASS
DetailsJosh Bogle
discussed a potential Plan Modification
CHANGE STATUS TO (ISS)  11/8/2019 DONE
per josh just questions about plan mod. customer was not ready to start one
Plan Modification Accepted  11/8/2019 DONE
patio cover
BLD-Foundation11/5/201911/6/201911/6/2019APASS
DetailsBrandon Shaw
rebar // Shane Phone #: ###-####
BLD-Footing10/17/201910/18/201910/18/2019ACANC
DetailsBrandon Shaw
JOSH- PLEASE GO LATE MORNING Phone #: ###-####
Routing Walk-In (Zoning)10/17/201910/17/201910/17/2019PPASS
DetailsEthan Mansfield
move structure 4 feet toward rear of lot. meets setbacks per plan.
Routing Walk-In (BLD)10/17/201910/17/201910/17/2019PPASS
DetailsJosh Bogle
no structural change
Plan Modification Accepted  10/17/2019 DONE
Placing shop in another spot on the parcel
OVERRIDE  9/17/2019  
Telephone call  9/17/2019 DONE
called Joe to let know permit is ready and how much is owed-left message- left message on Joes phone
Issue PAID IN FULL permit  9/17/2019 DONE
Permit Ready to Issue  9/17/2019 DONE
Need RP
Routing Walk-In (Zoning)9/16/20199/16/20199/16/2019PPASS
DetailsJosh Bogle
no contact with applicant
Routing Walk-In (Zoning)9/16/20199/16/20199/16/2019PPASS
DetailsEthan Mansfield
Plat Notes indicate funky setbacks noted on site plan.
Routing Walk-In (BLD)9/16/20199/16/20199/16/2019PDONE
DetailsJosh Bogle
Routing - PLAN CHECK9/16/2019 9/16/2019 PASS
DetailsJosh Bogle
1st review completed  9/16/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  9/16/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  9/16/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  9/16/2019 DONE
DetailsJosh Bogle
ESC yes - Energy no
Application received 9/16/2019