Permit Information
Permit NumberBLD19-03726
StatusIssued
Name CLAWSON JOSHUA J
Site Address 3909 N CARTWRIGHT RD
Project NameCartwright Retaining Wall
Customer Number 
ePlanReviewYes
Description
Permit to build a retaining wall to serve as a debris wall to protect house and occupants from possible mudslides, avalanches, etc. All work per plans, engineering, local codes and ordinances. A letter from the engineer of record is required before final inspection. **JAB**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval8/13/20208/13/20208/13/2020 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer/landscape architect indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
Override - Parcel Holds  8/13/2020  
BLD-Foundation12/6/201912/9/201912/9/2019APART
DetailsTony Young
Rebar- Josh Phone #: ###-####,, retaining wall
BLD-Footing12/6/201912/6/201912/6/2019PPART
DetailsTony Young
Rebar- Josh Phone #: ###-####,,footings poured,, work in progress on wall rebar
BLD-Footing11/22/201911/25/201911/25/2019APART
DetailsTony Young
CAL Phone #: ###-####,, ok to pour footing
BLD-Footing11/22/201911/22/201911/22/2019PPART
DetailsTony Young
CAL Phone #: ###-####,, work in progress on footing,, 90% done
PubWorks Subgrade Approval11/22/201911/22/201911/22/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  11/13/2019 DONE
Telephone call  11/5/2019 DONE
Emailed the parcel owner to let him know that all fees must be paid (and included the fees due). Also let him know that they would need an RP.
OVERRIDE  11/4/2019  
Routing Walk-In (BLD)11/4/201911/4/201911/4/2019PDONE
DetailsJosh Bogle
conference with Josh on what additional plans or document needed
Plan assigned to (JAB) Josh10/23/201910/23/201911/4/2019 PASS
DetailsJosh Bogle
10/29 retaining wall, ePlan - 1st done
Routing - PLAN CHECK11/4/2019 11/4/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/4/2019 DONE
DetailsJosh Bogle
ESC yes - Energy no
Permit Ready to Issue  11/4/2019 DONE
MET
Need RP
1st review completed  11/1/2019 FAIL
DetailsJosh Bogle
Routing PW Grading-Hillside10/23/2019 11/1/2019 PASS
DetailsMelissa Jannusch
RETAINING WALL ONLY
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PLANNING10/23/2019 10/29/2019 PASS
DetailsNicolette Womack
Routing - PLAN CHECK10/23/2019 10/28/2019 FAIL
DetailsJosh Bogle
see notes in ePlan
Plan Reviewer's activity  10/28/2019 DONE
DetailsJosh Bogle
noticed there was no Hillside task in ePlan, added it
Routing - PUBLIC WORKS10/23/2019 10/23/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment10/23/2019 10/23/2019 PASS
DetailsAndy J. Long
ESC site plan and narrative approved. RP not yet listed. Site preparation inspection required prior to earth work.
Plans ACCEPTED BY PLAN TECH  10/23/2019 DONE
Intake Approval  10/23/2019 PASS
Recd Pcfee & Taken To Pln CK  10/23/2019 DONE
Intake Approval  10/21/2019 FAIL
Approved under CFH17-00063. Please move the documents to the documents folder and have the drawings in the drawings folder.(we can delete the files for you) Melissa Jannusch ###-####
Application received  9/20/2019 DONE
Application submitted via PDS Online on Sep 20 2019 11:23AM