BLD-Framing/Rough-in | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Mike Jordan
|
|
|
Ed Phone #: ###-####. Interior wood framed walls for new bathroom. Also 2x10 wood joist repair. pending mech. ri inspection.
|
Plan assigned to (BJM) | 11/15/2019 | 11/15/2019 | 11/18/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/15/2019 | | 11/18/2019 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/18/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/18/2019 | | DONE |
|
|
|
called Strite Design and Remodel to let them know their permit is ready for pick up and what fees are due.
|
Inspection Record Card- Bld | | | 11/18/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/18/2019 | | DONE |
|
|
|
plan mod
|
Plan Modification Accepted | | | 11/15/2019 | | DONE |
|
|
|
one copy of sheet 1 of 1 and one copy of engineer letter taken to brian
|
Routing Walk-In (BLD) | 10/22/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/22/2019 | | 10/22/2019 | | FAIL |
Brian McGowan
|
|
|
Did not know if walls being removed are bearing. I suggested a demo permit to remove ceiling cover and wall cover (NO WALLS) to see what is bearing or not.
|
1st review completed | | | 10/22/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/22/2019 | | 10/22/2019 | | PASS |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/22/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/22/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/22/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/22/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/22/2019 | | |
|
|
|
|
Application received | | 10/22/2019 | | | |
|
|
|
|