BLD-Wall Bracing | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PART |
Tony Young
|
|
|
Kade - */Screened/* Phone #: ###-####// ok after nailing panels on plans rather than staples
|
BLD-Foundation | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Tony Young
|
|
|
screened // Sam Phone #: ###-####
|
BLD-Footing | 7/1/2020 | 7/1/2020 | 7/2/2020 | P | PASS |
Tony Young
|
|
|
Sam *screened* Phone #: ###-####
|
BLD-Footing | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PART |
Tony Young
|
|
|
Phone #: ###-####// soils ok per e-mail from JT
|
BLD-Final | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | NR |
Tony Young
|
|
|
Sam Phone #: ###-####// wanted a footing inspection,, needs soils approval 1st
|
Issue PAID IN FULL permit | | | 5/11/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/11/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/8/2020 | | DONE |
|
|
|
sent email to jevans@simplicity-homes.com about ALL fees needing to be paid for issuance of permits
|
OVERRIDE | | | 4/29/2020 | | |
|
|
|
|
Plan assigned to (BJM) | 2/25/2020 | 2/25/2020 | 4/29/2020 | | DONE |
Brian McGowan
|
|
|
04\28- 2nd Review Complete- SFD L2 ePlan
|
Routing - PUBLIC WORKS | 2/25/2020 | | 4/29/2020 | | PASS |
Candy A. Nichols
|
|
|
MORGAN PASSED IN E PLAN ON 2-25-20
|
Routing - PLAN CHECK | 4/29/2020 | | 4/29/2020 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/29/2020 | | DONE |
|
|
|
Met
|
Routing - PLAN CHECK | 4/23/2020 | | 4/23/2020 | | FAIL |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 4/20/2020 | | 4/20/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 3/27/2020 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/25/2020 | | 3/27/2020 | | FAIL |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 2/25/2020 | | 3/3/2020 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - PLANNING | 3/2/2020 | | 3/2/2020 | | PASS |
Karla Nelson
|
|
|
Ok per CFH19-00100
|
Route to Impact Fee Review | 2/25/2020 | 2/28/2020 | 2/26/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 2/25/2020 | | 2/26/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - FIRE | 2/25/2020 | 2/25/2020 | 2/25/2020 | | PASS |
Lee G Meredith
|
|
|
Sprinkelrs are not required. All measurements are within acceptable limits. No written review comments provided.
|
Routing - PLANNING | 2/25/2020 | | 2/25/2020 | | DONE |
Sue Cummings
|
|
|
set to karla again
|
Routing - Erosion and Sediment | 2/25/2020 | | 2/25/2020 | | PASS |
Michael Zawacki
|
|
|
Site prep required
|
Routing - MECHANICAL | 2/25/2020 | | 2/25/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/25/2020 | | 2/25/2020 | | DONE |
Sue Cummings
|
|
|
Sent to Karla
|
Plans ACCEPTED BY PLAN TECH | | | 2/25/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2020 | | DONE |
|
|
|
|
Intake Approval | | | 2/25/2020 | | PASS |
|
|
|
|
Intake Approval | | | 2/18/2020 | | FAIL |
|
|
|
NEED
ROTATE FLOOR LAYOUT PLAN
REScheck or PRESCRIPTIVE
|
Intake Approval | | | 2/13/2020 | | FAIL |
|
|
|
NEED
Grading & Drainage Plan
Truss Layout & Floor Layout Plan Sheet (too small)
Building Cross Section
REScheck
Foundation plan stamped & signed by engineer
ESC Narrative
Soils & Geo report
|
Application received | | | 2/10/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 10 2020 3:27PM
|
PubWorks Subgrade Approval | 7/1/2020 | 7/1/2020 | | | |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
PubWorks Subgrade Approval | 6/30/2020 | 6/30/2020 | | | |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|