BLD-Final | 7/17/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Tell Riley
|
|
|
Gary *screened* *other door enterance. Phone #: ###-####//two detectors were switched for smoke/co combos to meet code requirements, sent via photos for confirmation//
|
DOC - Permit Finaled | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | CANC |
Tell Riley
|
|
|
Gary *screened* *other door enterance. Phone #: ###-####
|
BLD-Energy code compliance | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Tell Riley
|
|
|
Gary Phone #: ###-####
|
BLD-Framing/Rough-in | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Tell Riley
|
|
|
gary Phone #: ###-####//ok to insulate only//ok to cover interior walls when air seal has been completed//
|
BLD-Framing/Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | NR |
Tell Riley
|
|
|
*screened* *Virtual inspection requested* Addition at rear with seperate entrance, please call ahead - Gary Phone #: ###-####//no shear inspection scheduled, and already covered//not ready for framinng, need trades inspections first//
|
BLD-Foundation | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PART |
Tell Riley
|
|
|
*screened* Brian Phone #: ###-####
|
BLD-Footing | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PART |
Tell Riley
|
|
|
Call before coming-Brian **cleared** Phone #: ###-####//ok when rebar is not touching earth, pad footing needs to bump out to 5 feet//setbacks appear to meet aproved plans//
|
Telephone call | | | 3/16/2020 | | DONE |
|
|
|
Spoke with Trevor Kesner from Boise Parks who said that the GC has applied to access the property from Park property and he denied the application. See DOCS on file.
|
Routing Walk-In (Zoning) | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | DONE |
Rob Patrick
|
|
|
|
Plan assigned to (RDP) | 3/11/2020 | 3/11/2020 | 3/11/2020 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 3/11/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/11/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/11/2020 | | 3/11/2020 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 3/11/2020 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 3/11/2020 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 3/11/2020 | | DONE |
Rob Patrick
|
|
|
|
Application received | | 3/11/2020 | | | |
|
|
|
|