BLD-Energy code compliance | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kristen McNeill
|
BLD-Framing/Rough-in | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kristen McNeill// ok to insulate// verify seal package
|
BLD-Framing/Rough-in | 7/2/2020 | 7/6/2020 | 7/6/2020 | A | NR |
Tony Young
|
|
|
Pre-meeting to review current status (just waiting on HVAC and Plumbing rough in approvals) to see if there''s anything we''re missing.
Please call Kristen 30 minutes before - ###-#### Phone #: ###-#### Inspection requested via web by Kristen McNeill/// walk through// needs trades,, fire blocking, seal pack
|
Inspection Record Card- Bld | | | 7/1/2020 | | DONE |
|
|
|
|
BLD-Wall Bracing | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kristen McNeill
|
BLD-Wall Bracing | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kristen McNeill
|
BLD-Foundation | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PART |
Tony Young
|
|
|
work in progress
|
BLD-Footing | 5/26/2020 | 5/27/2020 | 5/27/2020 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kristen McNeill
|
Issue PAID IN FULL permit | | | 4/29/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/29/2020 | | DONE |
|
|
|
|
Telephone call | | | 4/28/2020 | | DONE |
|
|
|
Contacted GC to let them know we still need an RP
|
OVERRIDE | | | 4/23/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 4/23/2020 | | DONE |
|
|
|
ALL MET
|
Plan assigned to (JAB) Josh | 4/21/2020 | 4/21/2020 | 4/22/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 4/22/2020 | | 4/22/2020 | | PASS |
Troy James
|
|
|
|
Plan assigned to (JAB) Josh | 4/13/2020 | 4/13/2020 | 4/21/2020 | | PASS |
Josh Bogle
|
|
|
04/17 addition, ePlan
|
Routing - PLAN CHECK | 4/13/2020 | | 4/21/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/21/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Routing - MECHANICAL | 4/15/2020 | | 4/15/2020 | | FAIL |
Troy James
|
|
|
Emailed corrections to designer.
|
Routing - PLANNING | 4/13/2020 | | 4/13/2020 | | DONE |
Sue Cummings
|
|
|
sent to Ted V.
|
Intake Approval | | | 4/13/2020 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2020 | | DONE |
|
|
|
|
Intake Approval | | | 4/9/2020 | | FAIL |
|
|
|
Prescreen 1
1. Please upload all drawings as individual files(not in one packet) and name according to what is on the page ex. DWG_Floor Plan 1, DWG_Electrical Plan
2. Two packets were uploaded that seem to have the same content but different dates. Please indicate if one should be deleted or if both relevant to scope of work.
3. Indicate code year 2015 IRC on cover page of plans
|
Application received | | | 3/17/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 17 2020 3:25PM
|